Pacific Gas and Electric Company Diablo Canyon Power Plant P O. Box 56 Avila Beach. CA 93424 805/545 6000 l

January 25,1996 l 1

PG&E Letter DCL-96-015 l R. n U.S. Nuclear Regulatory Commission ATTN: Document Control Desk '

l Washington, D.C. 20555 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Emeroency Plan Imolementino Procedure Update

Dear Commissioners and Staff:

I in accordance with Section V, " Implementing Procedures" of 10 CFR 50, Appendix E, enclosed is an update to the emergency plan implementing procedures for the Diablo Canyon Power Plant Units 1 and 2.

This update includes the following emergency procedure (EP) changes:

1. EP OR-2, " Release of Information to the Public," has been rescinded and incorporated into a new procedure EP EF-10, " Joint Media Center Activation and Operation."
2. EP EF-3A," Interim EOF Activation and Operation," and EP EF-3B, "Long-Term EOF Activation and Operation" have been rescinded and incorporated into procedure EP EF-3, " Activation and Operation of the Emergency Operations Facility." EP EF-3 had previously been rescinded (Revision 9), but has been resurrected as Revision 10.
3. Both Revision 15 and 16 of EP G-4," Personnel Assembly, Accountability and Site Access Control During Emergencies," are included in this submittal. Revision 15 is included for record purposes only. Revision 16 is the current procedure in effect.
4. Additional procedures have been revised as indicated in the enclosures to this letter.

02M 5 140051 9602140392 960125 PDR ADOCK 05000275 W( ,

F PDR

l Document Control D:sk i January 25,1996 l Page 2 l As provided under 10 CFR 50.54(q), the changes in this update have been l made without commission approval since they do not decrease the effectiveness  !

of the emergency plan; and the plan, as changed, continues to meet the standards of 10 CFR 50.47(b) and 10 CFR 50, Appendix E.

This update contains privacy / proprietary information that has been bracketed in accordance with NRC Generic Letter 81-27, " Privacy and Proprietary Material in Emergency Plans."

Sincerely, un Robert P. Powers Manager - Operations Services cc: Steven D. Bloom (w/o enclosures)