DCL-94-258, Forwards Public Version of Revised Epips,Including Rev 11A to EP RB-8,Rev 4B to EP RB-10,Rev 5 to EP RB-12,on-spot Change to Rev 9 to EP RB-15:C,Rev 16A to EP EF-1 & Rev 3B to EP EF-3B

From kanterella
Jump to navigation Jump to search
Forwards Public Version of Revised Epips,Including Rev 11A to EP RB-8,Rev 4B to EP RB-10,Rev 5 to EP RB-12,on-spot Change to Rev 9 to EP RB-15:C,Rev 16A to EP EF-1 & Rev 3B to EP EF-3B
ML20078N916
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 11/21/1994
From: Sexton J
PACIFIC GAS & ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20078N920 List:
References
DCL-94-258, NUDOCS 9412150103
Download: ML20078N916 (1)


Text

Pacific Gas and Electric Company Nuck

  • D .uiatory Sem;es A10A James A Sexter, 333* - T.bsra'

~~59e9 PC :00 Nuc/ 9m'a:cr. Sete San , CA 9 77 4ST :i Fax & 0374 l

November 21,1994 PG&E Letter DCL-94-258 ft U.S. Nuclear Regulatory Commission ATTN: Document Control Desk i Washington, D.C. 20555 1 Docket No. 50-275, OL-DPR-80 l Docket No. 50-323, OL-DPR-82 l Diablo Canyon Units 1 and 2 i Emeraency Plan implementina Procedure Update Gentlemen:  !

In accordance with Section V, " Implementing Procedures," of 10 CFR 50, Appendix E, enclosed is the update to the Emergency Plan implementing Procedures for Diablo Canyon Power Plant Units 1 and 2. This update includes an on-the-spot-change (OTSC) that was approved on October 27,1994. The

)

update contains privacy / proprietary information that has been bracketed in accordance with NRC Generic Letter 81-27, " Privacy and Proprietary Material in Emergency Plans."

S icerely, y pg,M W

/

James A. Sexton cc: L. J. Callan (2)

Mary H. Miller Kenneth E. Perkins (w/o enc)

Sheri R. Peterson (w/o enc)

Enclosure 6696S/DDS/1345 110001 Y

9412t501o3 941 tai PDR ADOCK 05000275 P DFL_

8' (

p