ML20212A619

From kanterella
Revision as of 21:19, 21 January 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Repts 50-259/86-23,50-260/86-23 & 50-296/86-23 on 860623-25.No Violation or Deviation Noted
ML20212A619
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 07/23/1986
From: Zech G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: White S
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20212A625 List:
References
GL-84-07, GL-84-11, GL-84-7, TAC-55590, TAC-55591, TAC-55592, NUDOCS 8607290086
Download: ML20212A619 (2)


See also: IR 05000259/1986023

Text

r!

l# M. M

JUL 2 31986

Docket Nos. 50-259, 50-260, 50-296

License Nos. D'R-33, DPR-52, DPR-68

Tenne Valley Authority

ATTN: Mr.gs S. A. White

Manager of Nuclear Power

6N 38A Lookout Place

1101 Market Street

Chattanooga, TN 37402-2801

Gentlemen:

SUBJECT: NRC INSPECTION REPORT NOS. 50-259/86-23, 50-260/36-23, AND 50-296/86-23

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

J. L. Coley on June 23-25, 1986. The inspection included a review of activities

authorized for your Browns Ferry facility. At the conclusion of the inspection,

the findings were discussed with those members of your staff identified in the

enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

Within the scope of the inspection, no violations or deviations were identified.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely,

e.o . 5L

kb[ Gary Zech, Director

TVA Projects

Enclosure:

NRC Inspection Report

cc w/ encl: (See page 2)

86072%B C p

PDR

O

reo/

/ I

V

p.. -

l

JUL 2 31986 i

Tennessee Valley Authority 2 l

cc y/ encl:

(V.P.Pomrehn,BrownsFerryNuclear

ant Site Director

L. Lewis, Plant Manager -

W. Whitt, Director, Nuclear

(r_.janagersReviewGroup

L. Williams, Jr. , Supervisor

D). E.dcensing

Rogers, Section

Project Engineer

bcc w/ encl:

k. Grace

. Walker

[ [R. Denton, NRR

L. Thompson, NRR

. Taylor, IE

B. Hayes, OI

,\$

Y.R.Connelly,DIA

J. Clark, Licensing

Project Manager, NRR

Hi. Grotenhuis, Project

Mariager, NRR

(fd'G.Zech

VS. P. Weise

VNRpResidentInspector

W. H. Girard

State of Alabama

Document Control Desk

,

i

l

-/

RII

gotC-

R j/ RII;k,y

4

JLColey: 1b lake A He dt SPdeise

07//0/86 7p/86 07/j/86 07/N/86

l

(