Forwards Safety Evaluation Granting Util 790711 & 801224 Requests to Establish Common Date for Implementing Inservice Insp Program Requirements.Start Date of 880301 Accepted for Second 10-yr Insp Interval
ML20206L966
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 06/20/1986
From: Muller D
Office of Nuclear Reactor Regulation
To: White S
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20206L971 List:
References
NUDOCS 8607010008
Download: ML20206L966 (2)


Text

-

June 20, 1986 9C@gfg Mr. S. A. White DISTRIBUTION Manager of Nuclear Power ,.dydket Fi TpN JPartlow Tennessee Valley Authority ( PDR/LPDR ACRS (10) 6N 38A Lookout Place DEisenhut Gray File 1101 Market Street OELD Chattanooga, Tennessee 37402-2801 SNorris RClark/MGrotenhuis

Dear Mr. White:

EJordan JGrace Your letters dated July 11, 1979 and December 24, 1980 requested that a common date be established for implementing the inservice inspection program

! requirements of 10 CFR 50.55a(g) at the Browns Ferry Nuclear Plant, Unit Nos.

1, 2 and 3. The provisions of 10 CFR 50.55a(g), " Inservice Inspection Requirements", requires that applicable ASME Code components of a boiling water-cooled nuclear power facility meet the requirements set forth in Section XI, Rules for Inservice Inspection of Nuclear Power Plant components of the ASME Boiler and Pressure Vessel Code. Each facility is required by 10 CFR 50.55a(g)(4)(ii) to have an inspection program plan which is updated every ten years to meet the requirements of the latest approved applicable edition and addenda of Section XI in effect 12 months prior to the start of successive 120 month inspection intervals.

You have requested a common implementation date for Browns Ferry Units 1, 2 and 3, (i.e., to have all three units begin 40 month and 20 month inspection periods on the same date), so there will be a single inservice inspection program and implementing procedures for these three basically identical units. It is our understanding that all inspections and tests required to be performed in the third inspection period are, or will be, completed.

We have reviewed your request and find it acceptable. November 1, 1984 is hereby approved as a common start date for all three units for the third 40 month inspection period. Approval is also granted for a start-date of March 1, 1988 for all three units to begin the second 10 year inspection interval. Our related Safety Evaluation is enclosed.

Sincerely,

/5/

Daniel R. Muller, Director BWR Project Directorate #2 Division of BWR Licensing

Enclosure:

As Stated cc w/ enclosure:

See next page cc w/ enclosure:

See next page DB PD#2 DBL: PD#h DB S rris RClark 5 ,

D 6 /20/86 4/2o/86 6/ 86 n87AEMM$2' G

j

r y ,

i

  • Mr. S. A. White Browns Ferry Nuclear Plant Tennessee Valley Authority Units 1, 2, and 3 cc:

H. S. Sanger, Jr. , Esquire Mr. W. C. Bibb _

General Counsel Site Director, BFNP Tennessee Valley Authority Tennessee Valley Authority 400 Commerce Avenue Post Office Box 2000 E 11B 330 Decatur, Alabama 35602 Knoxville, Tennessee 37902 Mr. Ron Rogers Resident Inspector Tennessee Valley Authority V. S. Nuclear Regulatory Commission SN 1308 Lookout Place Route 2, Box 311 Chattanooga, Tennessee 37402-2801 Athens, Alabama 35611 Chairman, Limestone County Commission Mr. Donald L. Williams, Jr.

Post Office Box 188 Tennessee Valley Authority Athens, Alabama 35611 400 West Summit Hill Drive, W10B85 Knoxville, Tennessee 37902 Ira L. Meyers, M.D.

State Health Officer Mr. Robert L. Lewis, Manager, BFNP State Department of Public Health Tennessee Valley Authority State Office Building Post Office Box 2000 Montgomery, Alabama 36130 Decatur, Alabama 35602 Mr. K. W. Whitt E3A8 400 West Summit Hill Drive Tennessee Valley Authority Knoxville, Tennessee 37902 Regional Administrator, Region II U. S. Nuclear Regulatory Commission 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 Mr. Steven Roessler U. S. Nuclear Regulatory Commission Reactor Training Center Osborne Office Center, Suite 200 Chattanooga, Tennessee 37411 6

9

_ _ . .