Forwards Insp Rept 50-245/88-18 on 880912-16.No Violations Noted
ML20205J609
Person / Time
Site: Millstone Dominion icon.png
Issue date: 10/24/1988
From: Durr J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mroczka E
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20205J611 List:
References
REF-GTECI-A-07, REF-GTECI-CO NUDOCS 8810310441
Download: ML20205J609 (2)


See also: IR 05000245/1988018

Text

. .

.. .

. .

OCT 2 41968

Docket No. 50-245

Northeast Nuclear Energy Company

ATTN: Mr. E. J. Mroczka

Senior Vice President - Nuclear

Engineering and Operations Group

P. O. Box 270

Hartford, Connecticut 06141-0270

Gentlemen:

Subject: Inspection Report No. 50-245/88-18

This letter refers to the special inspection conducted by Messrs. Kaplan and

Carrasco of this office on September 12-16, 1988 at the Millstone Nuclear

Power Station - Unit 1 in Waterford, Connecticut. Messrs. Kaplan and Carrasco

discussed the results of the inspection with J. Stetz of your staff at the

conclusion of the inspection.

This inspection focused on modifications made to the Mark I containment torus.

Areas examined during this inspection are described in the NRC Region I Inspection

Report which is enclosed with this letter. Within these areas, the inspection

consisted of selected examinations of procedures and representative records,

interviews with personnel, and observations by the inspectors.

Within the scope of this inspection, no violations were observed.

No reply to this letter is required. Your cooperation with us in this matter

is appreciated.

Sincerely,

Original Signed By

Cliff ord J. /.nicraon

Jacque P. Durr, Chief

Engineering Branch

Olvision of Reactor Safety

Enclosure: NRC Region I Inspection Report No. 50-245/88-18

0FFICIAL RECORD COPY IR MILL 1 88-18 - 0001.0.0

10/21/88

0810310441 881024 H ', C) \

PDR ADOCK 0b000245

Q PDC

m

. .

~ '

. . OCT 2 41993

Northeast Nuclear Energy Company 2

cc w/tnc1:

W. D. Romberg, Vice President, Nuclear Operations

S. E. Scace, Station Superintendent

D. O. Nordquist, Director of Quality Services

R. M. Kacich, Manager, Generation Facilities Licensing

Gerald Garfield, Esquire

Pubite Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of Connecticut

bec w/ enc 1:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o enc 1)

DRP Section Chief

J. Shedlosky, SRI, Haddam Neck

W. Raymond, SRI, Millstone 3

M. Boyle, LPM, NRR

R. Bores, DRSS

s

R

c)9

RI:DRS RI:DRS RI:DRS RT:DRS

Kaplan/jhpp/rw Carrasco Strosnider Durr

'

10/1' /88 10/15/88 10/2'/88 10/Y/88

0FFICIAL REC 00 COPY IR HILL 1 88-18 - 0001.0.1

10/14/88