Advises That NRC Design Baseline & Verification Program Team Will Perform Insp of Program Calculations on 880418-22.Insp Plan Encl
ML20150C529
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 03/11/1988
From: Zech G
NRC OFFICE OF SPECIAL PROJECTS
To: White S
TENNESSEE VALLEY AUTHORITY
References
TAC-62258, NUDOCS 8803210069
Download: ML20150C529 (3)


Text

. _ _ _ _ - _ - _ - _ _ ___ . _ - - _ . _ _ _ _ _ _ _ _ _ _ __ __ __ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _

-u March 11, 1988 Docket Nos. 50-259/260/296 Distribution (Docket file, C. Jamerson N RC ' PDR "^" G. Gears Local PDR D. Moran Mr. S. A. White S. Ebneter OGC Manager of Nuclear Power J. Axelrad J. Rutberg Tennessee Valley Authority S. Richardson F. Miraglia ,

G. Zech E. Jordem e 6N 38A Lookout Place 1101 Market Street B. D. Liaw J. Partlow Chattanooga, Tennessee 37402-2801 K. Barr ACRS(10)

A. Ignatonis TVA-Rockville

Dear Mr. White:

BFN Reading File

SUBJECT:

NRC DESIGN BASELINE AND VERIFICATION PROGRAM (DBVP) TEAM INSPECTION Re: Browns Ferry Nuclear Plant, Units 1, 2 and 3 The NRC will perform a team inspection of the calculation aspects of the Design Baseline and Verification Program (DBVP) during the period of April 18-22, 1988, at Knoxville. The objective of this inspection, inspection tasks and inspectors participating on the team are identified in the enclosure.

Members of your staff will be kept informed of our inspection progress and significant findings. An exit meeting with you or members of your staff will be conducted on April 22, 1988. in accordance with our normal procedures.

The inspection results of the team inspection will be transmitted to you through the standard NRC inspection report.

If you have any questions regardin Project Manager, G. Gears at (301)g 492-0767.this activity, please contact the NRC Sincerely, Original Signed by 8803210069 880311 ADOCK 050 9 Gary G. Zech, Assistant Director kDR for Projects TVA Projects Division Office of Special Projects

Enclosure:

DBVP Inspection Plan Outline cc w/ enclosure:

See next page r

V c

. .rs

'.Y a

INSPECTION PLAN BROWNS FERRY Inspection Topic: Team Inspection of the calculation aspects of the DBVP Date: April 18-2?., 1988 Inspection Report Nos. 50-259/88-07,50-260/88-07,50-296/88-07 Inspectors:

G. Georgiev, Team Leader P. Hearn, Mechanical Systems S. Traiforos, Nuclear Systems C. Kimuro, Mechanical Systems R. McFadden, Electrical Systems N. Rivera, Electrical Systems L. Stanley, Instrumentation and Control P. Chan, Instrumentation and Control A. DuBouchet, Mechanical Components M. Partridge, Mechanical Components

0. Mallon, Civil / Structural T. Tsai, Civil / Structural Objective:

To review and assess the adequacy of the calculations related to the Browns Ferry DBVP.

Inspection Tasks:

1. Review in detail the latest revisions to Browns Ferry DBVP.
2. Review the status of open items from the first NRC Team Inspection of DBVP.
3. Review the available documentation and interview cognizant TVA personnel to obtain pertinent information concerning the calculations aspects of the DBVP.

I

ir

-,, 'q{-

O e Mr. S. A. White Browns Ferry Nuclear Plant Tennessee Valley Authority Units 1, 2. and 3 cc:

General Counsel Regional Adninistrator, Region !!

Tennessee Valley Authority U.S. Nuclear Regulatory Cemnissier 400 West Summit Hill Drive 101 Marietta Street, N.W.

E11 833 Atlanta, Georgia 30323 Knoxville, Tennessee 37902 Resident Inspector / Browns Ferry NP Mr. R. L. Gridley U.S. Nuclear Pegulatory Commission Tennessee Valley Authority Route 12, Box 637 SN 157B Lookout Place Athens, Alabama 35611 Chattapooga, Tennessee 37402-2801 Mr. Richard V.ing Mr. H. P. Porrehn c/o U.S. GAO Tennessee Valley Authority 1111 North Shore Drive

, Browns Ferry Nuclear Plant Suite 225, Box 194 P.O. Box 2000 Knoxville, Tennessee 37919 Decatur, Alabama 35602 Dr. Henry Myers, Science Advisor Mr. M. J. May Comnittee on Interior Tennessee Valley Authority and Insular Affairs Browns Ferry Nuclear Plant U.S. House of Representatives P.O. Box 2000 Washington, D.C. 20515 Decatur, Alabama 35602 Mr. D. L. Williams Tennessee Valley Authority 400 West Summit Hill Drive W10 B85 Knoxville, Tennessee 37902 Chairman, Limestone County Commission P.O. Box 188 Athens, Alabama 35611 Claude Earl Fox, M.D.

State Fealth Officer i State Department of Public Health State Office Building Montgomery, Alabama 36130 i