ML20151U369

From kanterella
Revision as of 18:43, 24 October 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Safety Insp Repts 50-254/86-01 & 50-265/86-01 on 860115-23.No Violation Noted
ML20151U369
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 02/07/1986
From: Reyes L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20151U372 List:
References
NUDOCS 8602110005
Download: ML20151U369 (2)


See also: IR 05000254/1986001

Text

. .

i

FEB 0 71986

Docket No. 50-254

Docket No. 50-265

Commonwealth Edison Cor..pany

ATTN: Mr. Cordell Reed.

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the routine safety inspection conducted by Mr. W. Milbrot of

this office on January 15-23, 1986, of activities at Quad Cities Nuclear Fower

Station,- Units 1 and 2 authorized by NRC Operating License No. DPR-29 and

No. DPR-30 and to the discussion of our findings with Mr. N. J. Kalivianakis

and others of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

[' examination of procedures and representative records, observations, and

! interviews with personnel.

l

'

No violations of NRC requirements were identified during the course of this

inspection.

In accordance with 10 CFR 2.790 of the Comission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

[ We will gladly discuss any questions you have concerning this inspection.

Sincerely,

ORIGINAL SIGNED BY LUIS A. REYES

Og2QQ@$ hs [ ,

Luis A. Reyes, Chief

$

l

Operations Branch

!

Enclosure: Inspection Report

No. 50-254/86001(DRS);

No. 50-265/86001(DRS)

See Attached Distribution

RIII RI I RII RI I

%/%

Milbr6t/mab debond e

l

02/06/86  ! B3[,yd[M

1?g a ,

r

3 i i

. . - .

S ._

- .. o

- Comonwealth Edison Company 2

IEB D 712E5

Distribution

cc w/ enclosure:. .

D. L. Farrar, Director

of Nuclear Licensing

N. Kalivianakis, Plant Manager

DCS/RSB(RIDS) ~

Licensing Fee Management Branch

Resident Inspector, RIII

Phyllis Dunton, Attorney

General's-Office, Environmental

Control Division

-:-.