ML20154L772

From kanterella
Revision as of 20:28, 22 October 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Rept 50-423/85-74 on 851119-860106 & Notices of Violations.Details of App B Notice of Violation & Portions of Insp Rept Deleted (Ref 10CFR73.21)
ML20154L772
Person / Time
Site: Millstone Dominion icon.png
Issue date: 03/07/1986
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Opeka J
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20154L776 List:
References
RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8603120237
Download: ML20154L772 (2)


See also: IR 05000423/1985074

Text

-

' ' [4(d/b &(

NAR 07 8

.

Docket No. 50-423

License No. NPF-44

Northeast Nuclear Energy Company

ATTN: Mr. John F. Opeka

Senior Vice President-Nuclear

Engineering and Operations Group

P.O. Box 270

Hartford CT 06101

Gentlemen:

Subject: Inspection 50-423/85-74 (11/19/85-1/6/86)

This refers to the routine inspection by Messrs. T. Rebelowski, F. Casella, and

J. Shediosky of this office from November 19, 1985 to January 6, 1986 at the Mill-

stone Point Nuclear Power Station, Unit 3, and to the discussions of findings with

Mr. Crockett and other members of your staff during and at the conclusion of the

inspection.

It appears that certain of your activities ' violated NRC requirements as set forth

in the Notices of Violation enclosed as Appendices A and 8. The Violations of

Appendix B contain Safeguards Information and will not be discussed in this letter

except to state that we believe both are isolated cases.

The Violations in Appendix A are indicative of problems which, if uncorrected,

could become safety concerns. The first identifies lapses in cleanlivess control

when safety related systems are open. In your response, please include details

of long term corrective actions to enhance personnel knowledge and understanding

of cleanliness requirements. The second Violation in Appendix A concerns a failure

to follow procedures and to take thorough corrective ar.tions when a Plant Equipment

Operator found a Diesel Fuel Oil System valve mispositioned. This did not result

in esragement directed follow-up to evaluate the reason for the mispositioning and

to assess the potential for other valves being out of position. Please address

this in your response.

Your cooperation with us in these matters is appreciated.

Sincerely, Grisiaa13senedgg

ltyr/tt.W

Edward C. Wenzinger, Chief

Projects Branch No. 3

Division of Reactor Projects

L

{J 3855, ShJ / t

,

._

'..

Northeast Nuclear En2rgy Company 2 MAR 0 7126

.

Enclosures:

1. Appendix A, Notice of Violation

2. Appendix B, Notice of Violation *

3. NRC Region I Inspection Report.50-423/85-74*

  • Cortains Safeguards Information

cc (w/o Appendix B and Page 17 of Enclosure 3):* /

V. Papadopoli, Construction Quality Assurance SupervJsor/

E. R. Foster, Director of Generation Construction 7 /

W. J. Mroczka, Vice President, Nuclear Operationy 7

0. O. Nordquist, Manager of Quality Assurance v /

R. T. Laudenat, Manager, Generation Facilities Licensing /

W. D. Romberg, Station Superintendent /

Public Document Room (PDR) / -

'

Local Public Document Room (LPDR) #

Nuclear Safety Information Center (NSIC)V

NRC Senior Resident Inspector (w/cy of encis)* s

State of Connecticut y

  • Contains Safeguards Information

bec (w/o Appendix B and Page 17 of Enclosure.3):*

Region I Docket Room (with concurrences) / '

Management Assistant, DRMA (w/o enc 1)* /

DRP Section Chief f

G. Walton, SRI, BV 2 V

T. Shedlosky, SRI, Millstone 1&2 /

E. Doolittle, LPM

P. Eselgroth, RI /, NRR /

J. Johnson, RI /

M. McBride, SRI, Pilgrim /

M. Shanbaky, RI /

J. Wiggins, RI f

  • Contains Safeguards Information

R :DRP RI RP RI- RI:

Rebelokski/meo McCabe M4 Jo r Wer zi nger

2/27/86 y f-i-S 4 3 kT

OFFICIAL RECORD COPY

_ _ - -- ._