Forwards Rept on Valid Test Failure Experienced on Diesel Generator 1DG01KB,per Tech Spec 6.9.2
ML20148P819
Person / Time
Site: Braidwood Constellation icon.png
Issue date: 04/06/1988
From: Hunsader S
COMMONWEALTH EDISON CO.
To: Davis A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
4470K, NUDOCS 8804120208
Download: ML20148P819 (29)


Text

- m , .

.9 h

.I 'seO Commonwealth Eilson

  • [ 0- ) One First Noonal Maza_. Chcago, Illinois h

,g \ v ~J Address Reply to: Post Offc3 Box 767

'( j Chcago, litiros 60690 0767 pg10H7f C$f!M 7 rill N

'A April 6, 1988

[ r-kh O v Mr. A. Bert Davis n -

e-Regional Administrator flLNfD' U.S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL. 60137

Subject:

Braidwood Statio". Unit 1 Diesel Generator IDG0lKB Failure NRC Docket No. 50-456 Reference (a): NUREG-1276, Technical Specification, dated July, 1987 (b): October 5, 1987 S.C. Hunsader letter to A.b. Davis

Dear Mr. Davis:

Section 4.8.1.1.3 of reference (a) requires that all diesel generator failures, valid or non-valid, be reported to the NRC pursuant to Specification 6.9.2. The enclosure provides the report that addresses one valid test failure experienced on diesel generator IDG0lKB.

Attachment A provides the summary of diesel generator IDG01XA performance since the successful completion of pre-operational testing.

Attachment B provides an update of the same report for diesel generator IDG0lKB.

Reference (b) is the most recent report addressing diesel generator t'ailures, issued per Section 4.8.1.1.3.

Please direct any questions concerning this matter to this office.

Very truly yours, 880412O200 880406 gDR ADOCK O y 46 g S. C. Hunsader Nuclear Licensing Administrator

/klj cc: S. Sands-NRR Braidwood Resident Inspector p p\

NRC Document Control Desk [

}

4470K g%

f v

.f .\

18 D/G FAILURE REPORT On January 27, 1988 at 0430, while performing the Load Sequencing portion of Tech Staff Surveillance IBwVS 8.1.1.2.f-14 "18 Diesel Generator 24 Hour Load Test and ECCS Surveillance" the 18 D/G Failed to maintain steady state frequency at 601 1.2Hz as defined by Tech Spec 4.8.1.1.2f.6) b). The cause of this event has been attributed to high contact resistance across the 4EX3 "Emergency Mode Master Run Relay".

The 4EX3 relay was replaced. Following a troubleshooting run Tech Staff Surveillance IBwVS 8.1.1.2.f-14 was successfully performed.

Diesel Generator steady state frequency maintained at 601 1.2 Hz during performance of that test. l Two similar 4EX3 related failures were previously identified in Deviation Investigation Report #20-1-87-284 and letter to U.S. NRC dated October 5, 1987,

Subject:

Braidwood Station Unit 1 Diesel Generator IDG0lKA Failure NRC Docket No. 50-456. As a result of this most recent failure, the Modification Request which was previously submitted and being tracked by A. 4456-200-87-28401 is being expedited in an effort to prevent future re-occurrence of this event.

The 18 Diesel Generator was inoperable throughout this event. This was the ninth valid failure since completion of pre-cperational testing.

The IB Diesel Generator is currently being tested monthly in accordance with Technical Specification 4.8.1.1.2. The January 27, 1988 failure was the first valid failure in the last 31 valid tests.

Monthly testing of the IB Diesel will continue in accordance with  ;

Table 4.8-1 of Technical Specifications.

Pursuant to Regulatory Guide 1.108 Rcgulatory Position C.3.b.7 Item (1) the lA Diesel Generator has had four valid failures and the IB Diesel Generator has had nine valid failures since the completion of pre-operational testing. Attachment "A" provides summary of the 1A Diesel Generator's performance since successful completion of pre-operational testing. Attachment "B" provides a summary of th IB Diesel Generator's performance since successful completion of pre-operational testing.

The corrective actions taken to address the existing failures on the 1A and IB Diesel Generators in general, have been successful. The previously submitted Modification Request to replace all 4EX3 relays with new relays having less contact resistance and more stable characteristics than relays currently installed is being expedited to prevent future re-occurrence of this type failure (AIR

  1. 456-200-87-28401).

l l

l (6735z)

The Diesel Generators are inspected during every operability run.

Any problems that develop are corrected in a timely manner.

Braidwood Station believes that this approach is appropriate to maintain proper Diesel Generator availability and operability. The 1A and IB Diesel Generators have met all testing and operability requirements of position C.2 of Regulatory Guide 1.108.

Presently the 1A Diesel Generator is on a monthly surveillance schedule having successfully completed 19 valid tests without a failure.

l I

(6/35z)

t ATTACHMENT A Summary of the 1A Diesel Generator Starts

1) 9-3-86 Performed the 18 month IA Diesel Generator (DG)

Inspection Surveillance,18w0S 8.1.1.2.e-1. The 1 A DG was run for 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> at approx. 5000kw.

Valid Test - Successful.

2) 9-4-86 Following air regulator adjustments, the 1A DG tripped during performance of a troubleshooting run.

Invalid Test - Failure (I).

3) 9-4-86 The 1A DG tripped during a troubleshooting run due to the misadjusted air regulators.

Invalid Test - Failure (II).

4) 9-4-86 The 1A DG was run for approx. 5 minutes, unloaded for a troubleshooting run.

Invalid Test - Successful.

5) 9-5-86 The 1A DG was run for 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> at full load for the performance of inspection surveillance, 18wVS 8.1.1.2.e-1.
Valid Test - Successful.
6) 9-18-86 The 1A DG tripped on "Connecting Rod High Temp."

This failure was originally classified as Valid.

However, upon further review the failure was re-classified as Invalid per Reg. Guide 1.108 c.2.e.2.

Invalid Test - Failure (III).

7) 9-19-86 The 1A DG was run for 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> at varying loads.

Invalid Test - Successful.

8) 9-19-86 The 1A DG was run for 35 minutes at varying loads.

Invalid Test - Successful.

9) 9-20-86 Performed a 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> run at varying loads for the 1A DG Inspection Surveillance, 18wVS 8.1.1.2.e-1. The 1A OG was run for greater than 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> at full load during this run.

Valid Test - Successful.

10) 9-20-86 Peak Firing Pressures were taken for the 1A DG Inspection Surveillance, 18wVS 8.1.1.2.e-1.

Invalid Test - Successful.

11) 9-25-86 1A DG was started to adjust jacket water control valve. The DG tripped on several non-emergency trips due to a small air leak.

Invalid Test- Failure (IV).

1 4

(6735z)

l l

1

. I

12) 9-25-86 Following adjustment to DG air regulator, the 1A DG l tripped again from a troubleshooting run on the previous failure.

Invalid Test - Failure (V).  !

13) 9-25-86 During a troubleshooting run, the 1A DG tripped again l on several non-amergency -trips.

Invalid Test - Failure (VI)

14) 9-25-86 1A (DG) was run for approx. 5 minutes and shut down due to lack of field flash. DG potential fuses were ,

removed, i Invalid Test - Failure (VII).

15) 9-25-86 Performed Load Reject Surveillance, IBwVS 8.1.1.2.f-11. lA DG was run at full load for 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

Valid Test - Successful.

t 16) 9-26-86 Performed the 1A DG start on an SI signal surveillance,18wVS 8.1.1.2.f-7.

The 1A DG was run for 15 minutes, unloaded.

Invalid Test - Successful.

17) 9-16-86 1A DG run to test the installation of new jacket water controller valve. The DG was run for approx.  !

., 30 minutes.

Invalid Test - Successful.

18) 9-26-86 Performed the 1A DG Bypass of Automatic Trips Surveillance,18wVS 8.1.1.2.f-9. The 1A DG was run for greater than one hour, unloaded.

Invalid Test - Successful.

19) 9-27-86 Started the 1A DG for the SI Override of the Test Mode Surveillance, IBwVS 8.1.1.2.f-19. The 1A SX pp brkt malfunctioned in the equipment test position, i

The 1A DG was run for 30 minutes unloaded.

4 Invalid Test - Successful.

20) 9-27-86 Performed the 1A DG SI Override of the Test Mode Surveillance, IBwVS 8.1.1.2.f-19. The 1A DG was run for approx. 45 minutes unloaded.

7 Invalid Test - Successful.

l 21) 9-29-86 The 1A DG was run at 1500 kw for approx. 15 minutes.

Invalid Test - Successful.

22) 10-1-86 Performed the Semi-Annual Operability Surveillance, .

18w0S 8.1.1.2.a-3. The operator inadvertently 4 overloaded the DG and the engine was emergency l stopped.  ;

1 Invalid Test - Failure (VIII) ,

)

1 (6735z)

. i l

23) 10-2-86 Re-performed the Semi-Annual Operability Surveillance, IBw0S 8.1.1.2.a-3. The 1A DG was run ,

for 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> at full load. '

Valid Test - Successful.

I

24) 10-11-86 Ran the 1A DG for 15 minutes, unloaded, to test strip chart recorders to be used in the 1A DG 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> load I test and ECCS survelliance, IBwVS 8.1.1.2.f-13.

Invalid Test - Successful,

25) 10-11-86 Performed the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> full load test for 18wVS 8.1.1.2.f-13.  :

Valid Test - Successful, l 26) 10-13-86 1A DG was started on a Safety Injection and Undervoltage signal per 18wVS 8.1.1.2.f-13. The DG l

was run for 40 minutes at varying loads. <

l Invalid Test - Successful. l

27) 1D-13-86 1A DG was started on an undervoltage signal for the Loss of ESF Bus Voltage with no SI signal, IBwVS 8.1.1.2.f-15. The 1A DG was run at varying loads for approx. 30 minutes.

Invalid Test - Successful.

28) 10-23-86 Performed the Monthly 1A DG Operability Surveillance,

! 18w0S 8.1.1.2.a-1. The 1A DG was run at full load i for greater than one hour. i Valid Test - Successful. l

29) 11-2-86 Performed the Monthly lA DG Operability Surveillance,  !

18w0S 8.1.1.2.a-1. The 1A DG was run at full load for greater than one hour. ,

Valid Test - Successful. 1 l

l l 30) 12-3-86 Performed the Quarterly ESF Actuation surveillance i 18w0S 3.2.1-806. The 1A DG started on a safety injection signal and was run for 10 minutes, unloaded.

Invalid Test - Successful.

31) 12-3-86 Performed the Monthly 1A DG Operability Surveillance, IBw0S 8.1.1.2.a-1. The 1A DG was run at full load for greater than one hour. '

Valid Test - Successful.  !

32) 1-16-87 Following a maintenance outage the 1A DG was run for a troubleshooting run. The DG was run at full load for approx. 45 minutes.

Invalid Test - Successful. l

33) 1-16-87 The 1A DG was run for a modification test. The j engine was run for one hour at varying loads. l Invalid Test - Successful.

4 (67352)

~

34) 1-16-87 Performed the 1A DG Monthly Operability Surveillance, IBw0S 8.1.1.2.a-1. The 1A DG was run at full load for greater than one hour.

Valid Test - Successful.

35) 1-23-87 Following conduit repair, an operability test of the 1A DG was performed. The DG was run for 45 minutes to test the repaired conduit.

Invalid Test - Successful.

36) 2-5-87 The damaged cable described in the previous run was replaced. A 1A DG test was performed to test the cable's operability. The 1A DG was run for 40 minutes.

Invalid Test - Successful.

37) 2-6-87 The 1A DG was started for the Quarterly ESF actuation surveillance. 18w0S 3.2.1-806. The 1A DG was run, unloaded, for 20 minutes.

Invalid Test - Successful.

38) 2-16-87 Performed the 1A DG Monthly Operability Surveillance, IBw0S 8.1.1.2.a-1. The 1A DG was run at full load for one hoer.

Valid Test - Successful.

39) 3-3-87 Following a maintenance outage, the 1A DG was run for 35 minutes at full load during a troubleshooting test.

Invalid Test - Successful.

40) 3-3-87 The 1A DG was run for approx. 80 hours9.259259e-4 days <br />0.0222 hours <br />1.322751e-4 weeks <br />3.044e-5 months <br /> at full load as 3-6-87 part of the cumulative 100 hour0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> run to prove rocker arm durability.

Valid Test - Successful.

41) 3-7-87 Performed a troubleshooting run following the repair of a fuel line leak. The 1A DG was run for 20 '

minutes and shutdown after the leak reappeared.

  • Invalid Test - Successful.  ;
42) 3-7-87 Performed a troubleshooting run to inspect repair of fuel leak. lA DG was run for 40 minutes and shut down after the fuel leak recurred.

Invalid Test - Successful.

43) 3-7-87 Performed a troubleshooting run following the replacement of leaking fuel injector. The 1A DG was run at full load for approx. 30 minutes.

Invalid Test - Successful.

44) 3-7-87 Ran the 1A DG for greater than 20 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br /> at full load for rocker arm test.

Valid Test tuccessful.

(6735z)

. l

45) 3-9-87 Following a maintenance outage to inspect crosshead
  • clearances, a troubleshoo'. tag run was performed. The !

IA DG was run for 30 minutes at full load.

Invalid Test - Successful.

46) 3-9-87 Performed the 1A DG Honthly Operability Surveillance, IBw0S 8.1.1.2.a-1. The IA DG was run at full load for over one hour.

Valid Test - Successful.

47) 3-15-87 Performed the 1A DG Honthly Operability Surveillance, 18w0S 8.1.1.2.a-1. The 1A DG was run at full load '

for over one hour.

Valid Test - Successful.

48) 3-27-87 The 1A DG was run for approx. 10 minutes, unloaded, to satisfy IB DG inoperability LC0AR requirements.

Invalid Test - Successful.  ;

49) 4-15-87 Performed the 1A DG Honthly Operability Surveillance, 18w05 8.1.1.2.a-1. The 1A DG was run at full load for over one hour.

Valid Test - Successful.

50) 4-24-87 The 1A DG was run at 2300 kw for approx. 30 minutes during an Aux. Power Test.

Invalid Test - Successful.

51) 4-24-87 The 1A DG was started as part of Unit 2 pre-operational testing support. The DG was run for 30 minutes at varying loads.

Invalid Test - Successful.

52) 4-24-87 Performed the 1A DG Honthly Operability Surveillance, ,

IBw0S 8.1.1.2.a-1. The 1A DG was run at full load for over one hour.

Valid Test - Successful.

53) 5-4-87 The 1A DG was started to satisfy IB DG inoperability ,

LC0AR requirements. The 1A DG was run for approx. 10 1 minutes, unloaded. i Invalid Test - Successful. l

54) 6-4-87 Performed the IA DG Honthly Operability Surveillance, IBw0S 8.1.1.2.a-1. The 1A DG was run at full load for over one hour.

Valid Test - Successful.

55) 6-18-87 The 1A DG was run for 45 minutes at full load following a maintenance outage as a troubleshooting test.

Invalid Test - Successful.

(67352)

4

56) 6-18-87 Performed the 1A DG Monthly Operability Surveillance, IBw0S 8.1.1.2.a-l. The 1A DG was run at full load for over one hour.

Valid Test - Successful. .

Started the 1A DG for the Quarterly ESF Surveillance  !

57) 6-19-87 18w0S 3.2.1-806. The 1A DG was run for 10 minutes, unloaded.

Invalid Test - Successful.

58) 7-4-87 The Performed the lA DG Monthly Operability Surveillance, IBw0S 8.1.1.2.a-l. The 1A DG was run at full load for over one hour. l Valid Test - Successful.
59) 7-18-87 The 1A DG was started to satisfy 1B DG inoperability  !

LC0AR requirements. The 1A DG was run for approx. 10 minutes, unloaded.

Invalid Test - Successful.

60) 7-19-87 Performed the 1A DG Semi-Annual Operability Surveillance, 18w0S 8.1.1.2.a-1. The 1A DG was run at full load for one hour.

Valid Test - Successful.

61) 7-25-87 The 1A DG was run for 20 minutes, unloaded, to satisfy IB DG inoperability LC0AR requirements.

Invalid Test - Successful.

62) 8-7-87 The 1A DG Monthly Operability surveillance was stopped after approx. 5 minutes due to operator error in recording the start time.

Invalid Test - Successful.

63) 8-7-87 The 1A DG Honthly Operability surveillance was stopped after approx. 5 minutes due to operator error in recording the start time.

Invalid Test - Successful.

64) 8-7-87 The 1A DG was shutdown while loading during the i a performance of the 1A DG monthly Operability 1

Surveillance due to a fuel oil leak.

I Valid Test - Failure (1)

65) 8-7-87 Performed the 1A DG Honthly Operability Surveillance, 18w0S 8.1.1.2.a-1. The 1A DG was run at full load for greater than one hour.

Valid Test - Successful.

1 1

66) 8-15-87 Performed the 1A DG Honthly Operability Surveillance, 18w05 8.1.1.2.a-1. The 1A DG was run at full load for greater than one hour.

Valid Test - Successful.

i (6735:)

li

67) 8-16-87 The 1A DG was run for approx. 15 minutes to troubleshoot an annunciator power supply panel replacement. ,

Invalid Test - Successful.

68) 8-16-87 The 1A DG was run for 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> at varying loads to support start-up testing (AP-30). -

Invalid Test - Successful.

69) 8-18-87 The 1A DG was started for the second performance of AP-30. The engine dropped in rpm and began recovering. The engine then tripped on Incomplete Sequence.

Valid Test - Failure (2).

70) 8-19-87 A troubleshooting run was performed to investigate l the previous failure. The DG started and ran for 4

approx. 20 minutes. No abnormalities found.

Invalid Test - Successful.  !

71) 8-19-87 Performed the 1A DG Honthly Operability Surveillance, 18w0S 8.1.1.2.a-1. The 1A DG was run at full load i for greater than one hour.

Valid Test - Successful.

1 72) 8-19-87 Partial retest of startup test AP-30 was performed I the 1A DG was run at varying loads for approx. 40 minutes.

Invalid Test - Successful.

I

73) 8-20-87 Partial retest of startup test AP-30 was performed I

the 1A DG was run at varying loads for approx. 40 minutes.

j Invalid Test - Successful.

74) 8-26-87 Performed the Monthly 1A DG Operability Surveillance, 18w05 8.1.1.2.a-1. The 1A DG was run at full load for greater than one hour.

Valid Test - Successful, i

75) 9-2-87 Performed the Monthly 1A DG Operability Surveillance 18w0S 8.1.1.2.a-1. A large load oscillation was experienced approx. 30 minutes into the full load run. No other problems were experienced during the 130 minute run. The 1A DG was run at full for greater than I hour.

Valid Test - Successful.

76) 9-2-87 Raa the 1A DG for 11 minutes unloaded to troubleshoot emergency relay.

, Invalid Test - Successful.

1 I

(6735z)

77) 9-2-87 Performed a troubleshooting run following replacement of an emergency master run relay. The 1A DG was run at full load for over one hour.

Invalid Test - Successful.

78) 9-2-87 Started the 1A DG for the Monthly Operability Surveillance 18w0S 8.1.1.2.a-1. Unstable frequency response was experienced in both the emergency and non-emergency modes.

Valid Test - Failure (3) l 79) 9-3-87 Installed another replacement emergency master run l relay and performed a troubleshooting run. The 1A DG tripped on "Incomplete Sequence" due to leads on the emergency run relay being loose.

Invalid Test - Failure (IX).

80) 9-3-87 Started the 1A DG for a troubleshooting run. The DG l was run unloaded for 40 minutes in both emergency and non-emergency modes. Unstable frequency response was observed in the non-emergency mode.

Invalid Test - Successful.

81) 9-3-87 Performed a troubleshooting run on the 1A DG following relay cleaning and relay socket replacement. The 1 A DG was run for 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> at varying loads in the emergency and non-emergency modes.

Invalid Test - Successful.

82) 9-3-87 Performed the 1A DG Honthly Operability Surveillance, 18w05 8.1.1.2.a-1 and the Quarterly Auto-Start Surveillance IBw0s 3.2.1-805. The 1A DG was run at full load for greater than one hour.

Valid Test - Successful.

83) 9-4-87 The 1A DG was run for approx. 90 minutes of varying loads to support the performance of start-up test AP-30, Loss of Offsite Power. Invalid Test -

l Successful.

84) 9-10-87 Performed the 1A DG Honthly Operability Surveillance l 18w05 8.1.1.2.a-1, the 1A DG was run at full load for l

greater than one hour. Valid Test - Successful.

85) 9-19-87 1A DG was started for a troubleshooting run following rocker arm replacements. The 1A DG was run at full load for approx. 45 minutes. Invalid Test -

Successful.

86) 9-20-87 Performed the lA DG Honthly Operability Surveillance 18w0S 8.1.1.2.a-1, the 1A DG was run at full load for l greater than one hour. Valid Test - Successful.

1 l

(6735z)

87) 9-28-87 Performed the 1A DG Honthly Operability Surveillance IBw0S 8.1.1.2.a-1, the 1A DG was run at full load for greater than one hour. Valid Test - Successful.
88) 10-3-87 Performed the 1A DG Honthly Operability Surveillance 18w0S 8.1.1.2.a-1, the 1A OG was run at full load for greater than one hour. Valid Test - Successful.
89) 10-10-87 The 1A DG was started for the performance of the Monthly Operability Surveillance, 18w0S 8.1.1.2.a-1.

The 1A DG was shutdown after running at full load for 5 minutes due to a fuel oil leak. Valid Test -

Failure (4).

90) 10-10-87 The 1A DG was run for a troubleshooting run following

' pair of the fuel oil leak. The 1A DG was run at

,arying loads for 30 minutes. Invalid Test -

Successful.

91) 10-10-87 Performed the 1A DG Monthly Operability Surveillance IBw05 8.1.1.2.a-1, the 1A DG was run at full load for greater than one hour. Valiti Test - Successful.
92) 10-16-87 Performed the 1A DG Monthly Operability Surveillance 18w0S 8.1.1.2.a-1, the 1A DG was run at full load for greater than one hour. Valid Test - Successful.
93) 10-19-87 Performed the 1A DG Honthly Operability Surveillance 18w0S 8.1.1.2.a-1, the 1A DG was run at full load for greater than one hour. Valid Test - Successful.
94) 10-23-87 Performed the 1A DG Monthly Operability Surveillance IBw0S 8.1.1.2.a-1, the 1A DG was run at full load for greater than one hour. Valid Test - Successful.
95) 10-26-87 Performed the 1A DG Monthly Operability Surveillance 18w0S 8.1.1.2.a-1, the 1A DG was run at full load for greater than one hour. Valid Test - Successfel.
96) 11-02-87 Performed the 1A DG Honthly Operability Surveillance 18w0S 8.1.1.2.a-1, the 1A DG was run at full load for greater than one hour. Valid Test - Successful. I
97) 11-9-87 Performed the 1A DG Honthly Operability Surveillance IBw0S 8.1.1.2.a-1, the 1A DG was run at full load for greater than one hour. Valid Test - Successful.
98) 11-16-87 Performed the 1A DG Honthly Operability Surveillance IBw0S 8.1.1.2.a-1, the 1A DG was run at full load for greater than one hour. Valid Test - Successful.

l l

(6735z) 1

99) 11-23-87 Performed a troubleshooting run on the 1A DG following replacement of the 4R Intake Rocker Arm and repair of a minor fuel oil leak on 7R fuel injector.

The 7R fuel injector continued to leak. Invalid Test

- Successful.

100) 11-23-87 Performed a troubleshooting run on the 1A DG following repa*.r of the minor fuel oil leak on 7R fuel injector. The 7R fuel injector continued to leak. Invalid Test - Successful.

101) 11-23-87 Performed a troubleshooting run on the 1A DG following replacement of the 7R fuel injector. The 1A DG was run at full load for approx one half hour.

Invalid Test - Successful.

102) 11-23-87 Performed the 1A DG Honthly Operability Surveillance 18w0S 8.1.1.2.a-1, the 1A DG was run at full load for greater than one hour. Valid Test - Successful.

103) 11-30-87 Performed the 1A DG Honthly Operability Surveillance IBwCS 8.1.1.2.a-1, the 1A DG was run at full load for greater than one hour. Valid Test - Successful.

104) 12-7-87 The 1ADG was started per 18w0S 3.2.1-806. The 1A DG was run unloaded for 13 minutes. Invalid Test -

Successful.

105) 12-7-87 Performed the 1A DG Honthly Operability Surveillance 18w0S 8.1.1.2.a-1, the 1A DG was run at full load for greater than one hour. Vaiid Test - Successful.

106) 12-14-87 Performed the 1A DG Honthly Operability Surveillance 18w0S 8.1.1.2.a-1, the 1A DG was run at full load for greater than one hour. Valid Test - Successful.

107) 12-21-87 Performed the 1A DG Honthly Operability Survelliance 18w0S 8.1.1.2.a-1, the 1A DG was run at full load for greater than one hour. Valid Test - Successful.

108) 12-28-87 Performed the 1A DG Honthly Operability Surveillance 18w0S 8.1.1.2.a-1, the 1A DG was run at full load for greater than one hour. Valid Test - Successful.

109) 1-10-88 The 1A DG was started and run at full load for i approximately 2 1/2 hours to monitor cylinder peak l firing pressures. Valid Test - Successful. 1

, 110) 1-12-88 Ran the 1A DG for a troubleshooting run following engine timing inspection. The 1A DG was run for 20 i minutes at full load. Invalid Test - Successful.  !

4 (6735 )

i 111) 1-12-88 Performed the 1A DG Honthly Operability Surveillance IBw0S 8.1.1.2.a-1, the 1A DG was run at full load for greater than one hour. Valid Test - Successful.

112) 1-18-88 The 1A DG was started to cross-tie busses 241 and 141. The 1A DG was run for approximately one half hour with a max load of 2500kw Invalid Test -  ;

Successful.

113) 2-1-88 The 1A DG was started and run at full lori for I hour and 40 minutes to monitor cylinder peak firing  :

i pressures following cam timing adjustment. Invalid Test - Successful.

114) 2-4-88 The 1A DG was started to check operability of installed chart recorders prior to performance of

, load sequencing test. Invalid Test - Successful.

1 115) 2-4-88 The 1A DG was inadvertently started during performance of 18wVS 8.1.1.2.f-13 on an SI signal due to operator mis-communication. The 1A DG ran for 15 -

minutes unloaded. Invalid Test - Successful.

116) 2-4-88 The 1A DG was started on a UV and SI signal for performance of IBwVS 8.1.1.2.f-13 Load Sequence Surveillance. The 1A DG ran for 48 minutes at '

various loads. Invalid Test - Successful.

l l 117) 2-4-88 Performed the 1A DG Honthly Operability Surveillance l 18w0S 8.1.1.2.a-1, the 1A DG was run at full load for greater than one hour. Valid Test - Successful.  ;

l 118) 2-7-88 The 1A DG was started for performance of 18w05 3.2.1.1.a-l. The 1A DG ran for I hour and 4 minutes at an average load of 3050kw. Valid Test - '

Successful.

119) 2-9-88 The 1A DG was started for surveillance 18w0S 8.1.1.1.B-1. The 1A DG was run at various loads for 47 minutes. Invalid Test - Successful.

12) 2-14-88 Performed the 1A DG Honthly Operability Surveillance 18w0S 8.1.1.2.a-1, the 1A DG was run at full load for greater than one hour. Valid Test - Successful.

l (6735z)

1 l

1,2,3...... - Valid Failures I,II,III... - Invalid Failures :

ATTACHMENT B Summary of 1B Diesel Generator Starts Activity Qitt Activity

1) 8-10-86 Performed Load Reject Surveillance, IBwVS 8.1.1.2.f-12.

Strip chart recorder did not trace. Invalid Test -  !

Successful

2) 8-10-86 Performed Load Reject Sut<elllance, IBwVS 8.1.1.2.f-12.

Engine loaded to 5500 kw for < 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. Invalid Test -

Successful

3) 8-11-86 Performed 18 uonth diesel generator inspection, IBwVS 8.1.2.e-2 to check peak firing and compression pressures. Run at 5500 kw for 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br />. Valid Test -  !

Successful I

4) 9-10-86 Attempted to complete 18 month diesel generator inspection, 18wVS 8.1.1.2.e-2. Diesel generator tripped on "Incomplete Sequence". Cause was improper fuel priming. Valid Test - Failure (1) ,
5) 9-10-86 Engine was started and tripped on "Incomplete Sequence". Troubleshooting Run - Invalid Test -

Failure (I)

6) 9-13-86 Ran diesel generator unloaded for 5 minutes. .

Troubleshooting Run - Invalid Test - Successful

7) 9-13-86 Ran diesel generator unloaded for 8 minutes.

Troubleshooting Run - Invalid Test - Successful

8) 9-21-86 Ran diesel generator to complete 18 month inspection,  !

IBwVS 8.1.1.2.e-2. Ran diesel generator 5500 kw for  !

4.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />. Valid Test - Successful  !

9) 9-22-86 Attempted Auto-Start Surveillance of diesel generator '

18wVS 8.1.1.2.f-8. Diesel gena ator tripped on i "Incomplete Sequence". Loss of fuel prime problem. I Valid Test - Failure (2) )

i

10) 9-29-86 Diesel generator run te check repairs on fuel system.

Troubleshooting Run - Invalid Test - Successful (6735z)

I l

l l

ATTACHMENT B Summary of 18 Diesel Generator Starts Activity DAtt Activity

11) 9-30-86 Performed diesel generator auto-start on SI signal '

surveillance, 18wVS 8.1.1.2.f-8. Diesel was run for less than 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. Invalid Test - Successful

12) 9-30-86 Diesel generator run for less than 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> to check fuel prime. Invalid Test - Successful
13) 10-01-86 Diesel generator run for less than I hour to check fuel prime. Invalia Test - Successful
14) 10-02-86 Performed Trip Bypass Surveillance, IBwVS 8.1.1.2.f-10. .

Diesel generator was not loaded. Invalid Test -  !

Successful

15) 10-02-86 Performed final section of Trip Bypass Surveillance, IBwVS 8.1.1.2.f-10. Diesel generator was run for less ,

than 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> unloaded. Invalid Test - Successful  !

16) 10-02-86 Performed Alternate AC Power Surveillance, 18w0S 8.1.1.1.b-1. Diesel generator was run at 500 kw for less than 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. Invalid Test - Successful
17) 10-02-86 Diesel generator run for 12 minutes unloaded to check  ;

frequency. Invalid Test - Successful

18) 10-04-86 Operating attempted to run operability surveillance, 18w0S 8.1.1.2.a-4. Diesel generator did not start.

Valid Test - Failure (3) ,

19) 10-05-86 Ran SI signal override of Test Mode Surveillance.

18wVS 8.1.1.2.f-20. Diesel generator was run for less l than one hour. Invalid Test - Successful

20) 10-05-86 Operating performed the semi-annual operability surveillance, IBw0S 8.1.1.2.a-4. Valid Test -

Successful  !

21) 10-06-86 Ran SI signal override of Test Mode Surveillance, 18wVS 8.1.1.2.f-20. Invalid Test - Successful
22) 10-14-86 Start diesel for 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> loaded run per IBwVS 8.1.1. 2. f- 14. Stopped diesel after 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> loaded due to cylinder noise. Valid Test - Successful i I

i l

(6735z)

I L_________

ATTACHMENT 8 Summary of 1B Diesel Generator Starts Activity DAtg Activity

23) 10-14-86 Started diesel for 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> loaded run per IBwVS 8.1.1.2.f-14. Valid Test - Sur:essful
24) 10-15-86 Diesel generator was started on an undervoltage and SI signal following the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> run per IBwVS 8.1.1.2.f-14.

Governor response to loads was unsatisfactory. Diesel l was shutdown. Governor adjustments made. Valid Test -

Failure (4) ,

25) 10-12-86 Started the 18 diesel generator for speed servo governor adjustment. Troubleshooting Run - Jnvalid Test - Successful
26) 10-17-86 Started the diesel generator on an SI signal to adjust governor in the Emergency Mode. Troubleshooting Run -

Invalid Test - Successful i

27) 10-17-86 Started and loaded the diesel generator to 5500 kw for 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for the auto-actuation portion of 18wVS 8.1.1.2.f-14. Invalid Test - Successful
28) 10-17-86 Diesel generator emergency started for surveillance i

, 18wVS 8.1.1.2.f-14. Invalid Test - Successful  ;

29) 10-19-86 Diesel generator was started on an undervoltage signal for surveillance IBwVS 8.1.1.2.f-16. Engine was run 3

for 7 minutes and stopped. One strip chart channel did

not record. Invalid Test - Successful  ;

4

30) 10-19-86 Diesel generator was auto started on undervoltage signal per 1BwVS 8.1.1.2.f-16. Diesel generator was  ;

run for less than one hour. Invalid Test - Successful ,

j 31) 10-19-86 Operating performed Alternate AC Power Supply Surveillance. The diesel generator was run for less than one hour. Invalid Test - Successful

32) 10-24-86 Operating performed the monthly operability l 1 surveillance, IBw0S 8.1.1.2.a-2. The operator recorded i an 11 second start with a stopwatch. Valid Test - '

q Failure (5) i i

j l (67352)

ATTACHMENT 8

]

Summary of IB Diesel Generator Starts Activity 1

QLtt As.tbity

33) 10-31-86 Diesel generator was started to troubleshoot start time. Strip chart connections were loose causing erroneous diesel engine indication. DG was stopped.

Troubleshooting Run - Invalid Test - Failure. (II) ,

l

34) 11-01-86 Diesel generator was started to check strip chart I
connection problem. DG was run for less than 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

Troubleshooting Run - Invalid test - Successful

35) 11-01-86 Diesel generator was started for Monthly Operability Surveillance, 18w0S 8.1.1.2.a-2. Valid Test -

Successful  ;

36) 11-07-86 Operating performed the Monthly Operability Surveillance, 18w0S 8.1.1.2.a-2. Operator recorded a 13.2 second start with a stopwatch. Valid Test -

Failure (6)

, 37) 11-08-86 Monthly Operability Surveillance 18w0S 8.1.1.2.a-2 was performed with strip chart recorder to investigate start time. Diesel generator started within limits and was run for greater than I hour at 5500 kw. Valid Test J - Successful d

, 38) 11-11-86 Performed Operability Surveillance 18w0S 8.1.1.2.a-2, 1

Diesel generator ran for greater than 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> at 5500 kw.

Valid Test - Successful ,

39) 11-21-86 Diesel generator was started after tightening air start valves and adjusting timing. Diesel generator tripped on Incomplete Sequence. Troubleshooting Run - Invalid Test - Failure (III) i
40) 11-23-86 Diesel generator was run to investigate incomplete ,

sequence trip. Diesel generator tripped on Incomplete  !

, Sequence. Troubleshooting Run - Invalid Test - '

Failure (IV)

)

41) 11-23-86 Diesel generator was run to investigate Incomplete Sequence Trip. Diesel generator tripped on Incomplete 4

Sequence. Troubleshooting Run - Invalid Test -

Failure (V)

.1 i

f (6735z) 4

3 .

ATTACHMENT B i

Summary of IB Diesel Generator Starts Attivity .

) QAls Activity

)
42) 11-23-86 Diesel generator was run to investigate Incomplete Sequence Trip. Engine was run for 7 minutes with a jumper installed. Troubleshooting Run - Invalid Test -

Successful

43) 11-25-86 Diesel generator was run to investigate Incomplete Sequence Trip. Diesel generator tripped on incomplete sequence. Troubleshooting Run - Invalid Test -

j a Failure (VI)

44) 11-25-86 Diesel generator was run to. investigate Incomplete i

Sequence Trip. Diesel generator tripped on incomplete

~

sequence. Troubleshooting Run - Invalid Test - r Failure (VII) ,

45) 11-26-86 Diesel generator was run to investigate Incomplete  !

Sequence trip. Engine was run for 10 minutes with a  !

i jumper installed. Troubleshooting Run - Invalid Test -

) Successful 1

46) 11-26-86 Diesel generator was run to investigate Incomplete  ;

4 Sequence trip. DG was run for greater than 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> at 5500 kw. Troubleshooting Run - Invalid Test -

Successful i

47) 11-26-86 Operating performed the Monthly Operability Surveillance IBw0S 8.1.1.2.a-2. Diesel generator was run for greater than 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> at 5500 kw. Valid Test -

Successful

48) 12-02-86 Operating perfonaed the Monthly Operating Surveillance IBw0S 8.1.1.2.a-2. Diesel generator was run for j greater than 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> at 5500 kw. Valid Test - Successful i
49) 12-09-86 Diesel generator was started on a quarterly slave relay i

surveillance. Diesel Generator was run for less than 1 i hour. Invalid Test - Successful i

! 50) 12-09-86 Operating performed the Monthly Operability

) Surveillance. The diesel generator output breaker did not close. Valid Test - Failure (7) 4 J l j (6735z) l ,

i

ATTACHMENT B Su,nmary of 1B Diesel Generator Starts Activity '

DAtt Activity

51) 12-10-86 Diesel generator started to troubleshoot output breaker. Breaker functioned properly. Diesel generator was run for less than one hour.

Troubleshooting Run - Invalid Test - Successful

52) 12-10-86 Diesel generator was started on a quarterly slave relay surveillance. Diesel generator was run for less than 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. Invalid Test - Successful
53) 12-10-86 Operating performed the Monthly Operability

, Surveillance 18w0S 8.1.1.2.a-2. Diesel generator was run for greater than I hour at 5500 kw. Valid Test -

Successful

54) 12-17-86 Operating performed monthly operability surveillance 18w0S 8.1.1.2.a-2. Diesel generator was run for greater than 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> at 5500 kw. Valid Test - Successful
55) 12-29-86 Performed a maintenance troubleshooting run. The diesel generator tripped on Incomplete Sequence.

Troubleshooting Run - Invalid Test - Failure (VIII)

56) 12-30-86 Performed a troubleshooting run on the Incomplete Sequer.ce trip. The diesel generator tripped on incomplete sequence. Troubleshooting Run - Inva'ld Test - Failure (IX)
57) 1-02-87 Performed a maintenance, troubleshooting run.

Troubleshooting Run - Invalid Test - Successful

)

! 58) 1-02-87 Operating performed Honthly Operability Surveillance i IBw0S 8.1.1.2.a-2. Diesel Generator was run for

greater than I hour of 5500 kw. Valid Test - Successful
59) 1-08-87 Operating performed Monthly Operability Surveillance 18w0S 8.1.1.2.a-2. Diesel Generator was run for greater than I hour of 5500 kw. Valid Test - Successful
60) 1-16-87 Operating performed Monthly Operability Surveillance IBw0S 8.1.1.2.a-2. Diesel Generator was run for greater that. I hour of 5500 kw. Valid Test - Successful i

l

, (6735z)

1 I

i ATTACHMENT B Summary of IB Diesel Generator Starts Activity i

Q111 &ctivity  ;

l

61) 1-28-87 Performed a maintenance, troubleshooting test following a maintenance outage. The diesel generator tripped on "Main and Conn. Rod Brg. Temp. Hi". Invalid Test - '

Failure (X) t

62) 1-28-87 Performed a maintenance, troubleshooting test. The l diesel generator was run for 5 minutes and stopped to l investigate strip chart recorders. Invalid Test -

Successful

63) 1-29-87 Performed a maintenance, troubleshooting test. The diesel generator was run for 10 minutes and stopped to investigate strip chart recorder ground. Invalid Test 1

- Successful

64) 1-29-87 Performed a maintenance, troubleshooting test. The  :

diesel generator was run for 15 minutes and stopped after determined strip chart recorders functioned correctly. Invalid Test - Successful

65) 1-29-87 Performed diesel generator modification test M20-1-86-003-1. The diesel generator was run at approximately 1000 kw for 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> and 45 minutes.

Invalid Test - Successful

66) 1-29-87 Operating performed Monthly Operability Surveillance  :

IBw0S 8.1.1.2.a-2. Diesel Generator was run for greater than I hour at 5500 kw. Valid Test - Successful

67) 1-31-87 Diesel Generator was run for 5 minutes to verify proper ,

field flash indication. Invalid Test - Successful ^

68) 2-05-87 Operating performed Monthly Operability Surveillance IBw0S 8.1.1.2.a-2. Diesel Generator was run for greater than 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> at 5500 kw. Valid Test - Successful

, 69) 2-12-87 Operating performed Monthly Operability Surveillance 18w05 8.1.1.2.a-2. Diesel Generator was run for j greater than 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> at 5500 kw. Valid Test - Successful i 70) 2-13-87 The diesel generator was auto-started on a simulated SI l j signal for survelliance testing and run for 20 minutes '

unloaded. Invalid Test - Successful i

1 i

1 (6735z) 1

1 l

ATTACHMENT 8 i l

l Summary of IB Diesel Generator Starts Activity <

DAtt Activity

71) 2-19-87 The diesel generator was started for Monthly l Operability Surveillance IBw0S 8.1.1.2.a-2. The diesel l generator was shutdown after 25 minutes when a Klene indicating cock valve failed. Valid Test - Failure (8)
72) 2-20-87 Performed a maintenance, troubleshooting test after replacement of the failed indicating valve. The diesel generator was run for 50 minutes at 5500 kw. Invalid  ;

Test - Successful

73) 2-20-87 Performed the Monthly Operability Surveillance 18w0S <

8.1.1.2.a-2. The diesel generator was run for greater l than I hour at 5500 kw. Valid Test - Successful  !

74) 2-27-87 Performed the Monthly Operability Surveillance 18w0S 8.1.1.2.a-2. The diesel generator was run for  :

greater than 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> at 5500 kw. Valid Test - Successful

75) 3-02-87 Performed a maintenance, troubleshooting run after the i replacement of the 8L cylinder fuel line. The diesel i generator was run for 30 minutes at 5500 kw. Invalid i Test - Successful .
76) 3-02-87 Performed the Monthly Operability Surveillance IBw0S 8.1.1.2.a-2. The diesel generator was run for greater than I hour at 5500 kw. Valid Test - Successful l t
77) 3-10-87 Performed a Maintenance Troubleshooting run after [

replacement of all Kiene indicating valves. The diesel  !

generator was run for 30 minutes at 5500 kw. Invalid  !

Test - Successful.  !

78) 3-10-87 Diesel Generator was run for 23 hours2.662037e-4 days <br />0.00639 hours <br />3.80291e-5 weeks <br />8.7515e-6 months <br /> at full load as i to part of the 100 hour0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> cumulative run. The IB diesel ,

3-11-87 generator was shutdown to repair minor fuel injector leaks on 3 cylinders. Valid Test - Successful. l

79) 3-11-87 Attempted to run diesel generator for maintenance, I troubleshooting run following fuel injector line ,

repairs. Diesel generator tripped on "Incomplete I Sequence" after approximately 1 minute. Invalid Test -

Failure (XI)

(6735z) 1

)

ATTACHMENT B i

Summary of IB Diesel Generator Starts ___ Activity DAtt Activity

80) 3-11-87 Attempted to run the diesel generator for a maintenance, troubleshooting test. The diesel generator tripped on "Incomplete Sequence" after approximately 1 minute. Invalid Test - Failure (XII)
81) 3-11-87 Attempted to run the diesel generator for a maintenance, troubleshooting test. The diesel '

generator tripped on "Incomplete Sequence" after approximately 1 minute. Invalid Test - Failure (XIII)

82) 3-12-87 Started the diesel generator for maintenance, troubleshooting after correcting instrument valve  ;

i line-up. The diesel generator was run for 10 minutes l

at 5500 kw. Invalid Test - Successful

! 83) 3-12-87 The diesel generator was run for approximately 77 hours8.912037e-4 days <br />0.0214 hours <br />1.273148e-4 weeks <br />2.92985e-5 months <br /> l to at 5500 kw to complete the 100 hour0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> cumulative run. i 3-15-87 Valid Test - Successful

. 84) 3-16-87 Performed a maintenance, troubleshooting run after  :

I rocker arm inspections and relay replacement. The  !

diesel generator tripped on "Generator Reverse Power" -

after running for 45 minutes at 5500 kw. Invalid Test  :

- Failure (XIV)  :

85) 3-17-87 Performed a maintenance, troubleshooting run to  !

investigate load fluctuations. The diesel generator was run for 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> at varying loads. Invalid Test -

Successful l

86) 3-17-87 Performed a maintenance, troubleshooting run to investigate load fluctuations. The diesel generator l

was run for 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> at varying loads. Invalid Test -

Successful.

l

87) 3-17-87 Performed a maintenance, troubleshooting run following the isochronous mode relay replacement. The diesel generator was run for 45 minutes at 5500 kw. Invalid Test - Successful
88) 3-17-87 Performed the Monthly Operability Surveillance 18w0S 8.1.1.2.a-2. The diesel generator was run for greater than I hour at 5500 kw. Valid Test - Successful 1

(6735z)

\

ATTACHMENT B l Summary of IB Diesel Generator Starts Activity j Qait Activity t

89) 3-24-87 Performed the Monthly Operability Surveillance ,

IBw0S 8.1.1.2.a-2. The diesel generator was run for i greater than 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> at 5500 kw. Valid Test - Successful ,

90) 3-28-87 Performed & maintenance, troubleshooting following l valve tappet adjustments. The diesel generator was run  ;

for 45 minutes at 5500 kw. Invalid Test - Successful ,

91) 3-28-87 Performed the Monthly Operability Surveillance IBw0S 8.1.1.2.a-2. The diesel generator was run for  ;

greater than 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> at 5500 kw. Valid Test - Successful

92) 3-29-87 Diesel Generator was run for 20 minutes to check leakage on fuel oil relief valve. Invalid Test -

Successful

93) 3-29-87 Diesel Generator was run for 15 minutes to check ,

leakage on fuel oil relief valve. Invalid Test -

Successful  !

94) 4-03-87 Performed the Monthly Operability Surveillance IBw05 8.1.1.2.a-2. The diesel generator was run for j greater than I hour at 5500 kw. Valid Test - Successful
95) 4-04-87 Performed a maintenance, troubleshooting run following (

replacenent of the 7L fuel injector due to minor  !

leakage. The diesel generator was run for 30 minutes  ;

at 5500 kw. Invalid Test - Successful l

96) 4-05-87 Performed the Monthly Operability Surveillance f IBw05 8.1.1.2.a-2. The diesel generator was run for  ;

greater than I hour at 5500 kw. Valid Test - Successful l

97) 4-05-87 Perform a maintenance, troubleshooting start following  !

calibration of the vibration shutdown press switch. l The diesel was run for 15 minutes unloaded. Invalid i Test - Successful  :

i

98) 4-10-87 Performed the Monthly herability Surveillance ,

IBw0S 8.1.1.2.a-2. The diesel generator was run for (

greater than 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> at 5500 kw. Valid Test - Successful '

(6735z)

$ ATTACHMENT B i

Summary of IB Diesel Generator Starts Activity Qtti Activity J

99) 4-28-87 18 diesel generator was u>ed to crosstie Bus 142 to Bus 242 for a temporary auxiliary power procedure. The IB ,

) diesel generator tripped on "Reverse Power" after synchronization. Invalid Test - Failure (XV) 100) 4-28-87 18 diesel generator was started and used to transfer

Bus 142 loads back to Unit 1 System Auxiliary l Transformer. Invalid Test - Successful 4 101) 5-06-87 Performed a maintenance, troubleshooting run following l the installation of modifications to add isolation valves and replacement of the isochronous mode relay. l The 1B diesel generator was operated for greater than 1

, hour at varying loads. Invalid Test - Successful 102) 5-06-87 Performed a maintenance, troubleshooting run following installation of modifications. The IB diesel generator -

j was operated for greater than I hour at varying loads, a

i Valid Test - Successful 103) 5-06-87 Performed the Monthly Operability Surveillance,18w05 3

8.1.1.2.a-2. The diesel generator was run for greater  !

! than I hour at 5500 kw. Valid Test - Successful .

1 l

1 104) 5-18-87 Performed a maintenance, troubleshooting run to monitor load fluctuations using several strip chart connections. The diesel generator was run for greater  :

j than 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> at varying loads. Invalid Test - Successful  !

I i 105) 5-18-87 Performed the Monthly Operability Surveillance, 18w0S 8.1.1.2.a-2. The diesel generator was run greater than

] 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> at 5500 kw. Valid Test - Successful i 106) 6-16-87 Perform 2d the Monthly Operability Surveillance 18w05 l i

8.1.1.2.a-2. The diesel generator was run greater than )

I hour at 5500 kw. Valid Test - Successful.

, 107) 7-17-87 Ran 18w0S 8.1.1.2a-2 for Operability run. The DG was 4

shut down before 60 minutes greater than 5500 kw was achieved. The surveillance was unsuccessful due to i load swings taking load below 5500 kw. Valid Test -

I Successful.

108) 7-17-87 Performed a troubleshooting run to investigate load

! swings. The 18 DG was run at varying loads for approx.

1 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />. Invalid Test - Successful, i

I

]

(6735:)

i ATTACHMENT B l Synnary of IB_ Diesel Generator Starts Activity l QAlt Alt.l Y_1.t3  !

109) 7-18-87 Performed a troubleshooting run to investigate load l swings. The 18 DG was run at varying loads for approx.  !

2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />. Invalid Test - Successful. '

110) 7-18-82 Performed a troubleshooting run to investigate load f swhgs. The IB DG was run unloaded for 16 minutes.

Invalid Test - Successful.

111) 7-18-87 Performed a troubleshooting run to investigate load swings. The IB DG was run at full load for approx. 1  :

br. Invalid Test - Successful.

112) 7-20-87 Performed a troubleshooting run to investigate load -

swings. The IB DG was run at approx. full load for 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />. Invalid Test - Successful.

113) 7-20-87 Performed a troubleshooting run to investigate load .

swings IB DG was run at varying loads for approx. j 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />. Invalid Test - Successful.  ;

114) 7-20-87 Performed a troubleshooting run to investigate load swings. The IB DG was run at full load for 20  :

minutes. Invalid Test - Successful, t 115) 7-21-87 Ptrformed a troubleshooting run to investigate load '

swings. The 18 DG was run at varying loads for to i minutes. Invalid Test - Successful.

116) 7-21-87 Performed a troubleshooting run to investigate load swings. The 18 DG was run for approx. 45 minutes at  ;

full load. Invalid Test - Successful. j 117) 7-21-87 Performed a troubleshooting run to investigate load l swings. The iB DG was run for 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> at full load. '

Invalid Test - Successful.

118) 7-22-87 Performed a troubleshooting run to investigate load swings. The IB DG was rur for approx. 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> at full load. Invalid Test - Successful, t 119) 7-22-87 Performed a troubleshooting run to investigate load i swings. The 18 DG was run for greater than 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> at l full load. Invalid Test - Successful.

120) 7-22-87 Performed 18w05 8.1.1.2.a-2 to demonstrate IB DG Operability. The IB DG was run greater than I hour at 5500kw. Valid Test - Successful.

1 (6735z)

i .

ATTACHMENT B  ;

i Summary of 18 Diesel Generator Starts Activity l

] Qtte Activity i 1 ,

121) 7-23-87 Performed the Monthly Operability Surveillance, 1Bw05 8.1.1.2.a-2. Load swings were experienced, the DG was i run for approx. 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> including 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> at full load.

j Valid Test - Successful.  !

122) 7-24-87 Performed a troubleshooting run to investigate load 4

swings. The IB DG was run at vary ng loads for approx.  ;

2.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />. Invalid Test - Success ul. l 123) 7-25-87 Performed a troubleshooting run to investigate load  !

swings. The 18 DG was run at varying loads for 1.5 j i hours. Invalid Test - Successful.

124) 7-26-87 Performed a troubleshooting run to investigate load  !

swings. The IB DG was run at full load for 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. l Invalid Test - Successful. ,

i

{ 125) 7-26-87 Performed the Monthly Operability Surveillance IBw05 8.1.1.2.a-2 and Quarterly Auto Start Surveillance. .

1 IBw05 3.2.1-816. The IB DG was run for greater than 1 I j hour at full load. Valid Test Successful.

126) 7-27-87 Performed the Monthly Operability Surveillance. IBwoS ,

J 8.1.1.2.a-2. the IB DG was run for greater than I hour  !

at full load. Valid Test - Sucesssful.  ;

i j 127) 7-28-87 Performed the Monthly Operability Surveillance, IBw05  !

8.1.1.2.a-2. The IB DG was run for greater than I hour i at full load. Valid Test - Successful. '

l 128) 7-29-87 Performed the Monthly Operability Surveillance, Ibw0S J. 8.1.1.2.a-2. The IB DG was run for greater than 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> 1 at full load. Valid Test - Successful.  :

129) 8-8-87 Performed a maintenance, troubleshooting run following

the installation of new rocker arms and valve tappet i.

i adjustments. The IB DG was run at full load for '

! approx. 45 mirutes. Invalid Test - Successful.

. 130) 8-8-87 Performed the Monthly Operability Surveillance. 18w05  !

l 8.1.1.2.a-2. The 18 DG was run for greater than I hour i

at full load. Valid Test - Successful. )

]

i I1 (6735z)

I

ATTACHMENT B Sumiry of IB DieaLGenrAtor Starts Activity Eait Activity 131) 8-16-87 IB DG started on an undervoltage signal for startup

, test AP-30. The DG accepted load satisfactorily. The IB DG was run for 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> at varying loads. Invalid Test - Successful.

122) 6-21-87 Performed the Monthly Operability Surveillance,18w05 d.1.1.2.a-2, the IB DG was run greater than I hour at full load. Valid Test - Successful.

133) 9-3-87 Performed the Nonthly Oper' 'iv Surv2111ance, 18w05 8.1.1.2.a-2. the 18 DG wa greater than 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> at full load. Valid Test - $ ful.

134) 9-18-87 The IB DG was run for 35 mi ates unloaded for completion of an operating test. Invalid Test -

Successful.

135) 9-21.87 Performed the Monthly Operability Surveillance, IBwr 8.1.1.2.a-2. The IB DG was run greater than I hocr oi full load. Valid Test - Successful.

136) 10-19-87 Performed the Monthly Operability Surveillance, IBw0S 8.1.1.2.a-2. The IB DG was run greater than I hour at full load. Valid Test - Successful.

137) 10-24-87 The IB Die;91 Generator was run for 5 minutes at 15D0kw to ensure operability of output breaker following VA-11 Testing. )

Invalid Test - Successful. ,

l 138) 11-19-87 Performed the Monthly Operability Surveillance, 18w05 l 8.1.1.2.a-2. The 18 DG was run greater than I hour at i full load. Valid Test - Successful.

139) 11-23-87 The 1B DG was started and run unloaded for 10 minutes to satisfy the requirements of LC0AR 1Bw05 8.1.1-1A.

Invalid Test - Successful.

140) 12-20-87 Performed the Monthly Operability Surveillance,18w05 1 8.1.1.2.a-2. The IB DG was run greater than 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> at i full load. Valid Test - Successful. l 141) 1-6-88 The IB DG was started and run at varying loads for approximately 71/2 hours to perform engine analysis and l monitor cylinder peak firing pressures. Valid Test -

Successful.

(6735z)

142) .-13-88 The IB DG was started to cross-tie busses 142 and 242.

The IB DG was run for 14 minutes at varying power levels. Invalid Test - Successsul.

143) 1-22-88 The 18 DG was started and run 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> and 40 minuter at full load to monitor cylinder peak firing pressures following cam timing adjustments. Invalid Test -

Successful.

144) 1-25-88 The IBDG was started and run for approximately 20 minutes at full load to monitor cylinder peak firing pressures following shimming of several fuel oil pumps. Hinor fuel oil leaks developed on the 4R and 8R high pressure fuel oi! injection lines. Invalid Test -

Successful.

145) 1-26-88 Performed a trouble shooting run on the 18 DG following repair of the minor fuel oil leaks on 4R and 8R cylinders. The 1 high pressure fuel oil line

, continued to leal The 18 DG ran for 35 minutes at full load. Inval i Test - Successful.

146) 1-26-88 Performed a trouble shooting run on the IB DG following replacement of the 8 cylinder fuel pump. In addition, cylinder peak firing pressures were monitored. The 18 DG ran for 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> and 32 minutes at full rated load.

Invalid Test - Successful.

147) 1-27-88 18 DG was started on a UV and SI signal per IBwVS 8.1.1.2.f-14. DG frequency response did not meet the acceptance criteria as defined in 18wVS 6.1.1.2.f-14.

Valid Test - Failure (9) 148) 1-27-88 Started the 18 DG for a troubleshooting run. The IB DG was run for 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> at various power levels in both the emergency and non-emergency modes following Emergency Mode Master Run Relay replacement (4EX3). Invalid Test

- Successful.

149) 1-27-88 18 DG was started on a UV and SI signal per 18wVS 8.1.1.2.f-14. All DG measured parameters indicated proper during the load sequencing and subsequent steady state operation. The IB DG was run :or approximately 30 minutes. Invalid Test - Successful.

150) 1-28-88 18 DG was started to perform "Override of Test Mode Surveillance" 18wVS 8.1.1.2.f-20. Invslid Test -

Successful.

151) 1-28-88 Performed the Semi-Annual Operability Surveillance, 18w05 8.1.1.2.a-2 in conjunction with 18wos 3.2.1-816.

The 18 DG was run for greater than one hour at full load. Valid Test - Successfui.

152) 2-8-88 1B DG was started for performance of 18w0S 3.2.1.1.a-2 and 18w0S 8.1.1.1.b-1. The IB DG was run for > 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> at various loads. Invalid Test - Successful.

(6735z)

_ _