Forwards Updated LER 83-007/03L-1.Detailed Event Analysis Encl
ML20071C122
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 02/22/1983
From: Dixon O
SOUTH CAROLINA ELECTRIC & GAS CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20071C123 List:
References
NUDOCS 8303010495
Download: ML20071C122 (3)


LER-2083-007, Forwards Updated LER 83-007/03L-1.Detailed Event Analysis Encl
Event date:
Report date:
3952083007R00 - NRC Website

text

)

. . i

  • '- s l

SOUTH CAROLINA ELECTRIC & GAS COMPANY

' " "'** @ c. r.)e n.,,. l CowusiA SouT,H C,AnouNA 29218 f..

. , h :.n . v - - l

,[,,,',*,"j,"' February.22, 1983 i

~oc<... o......o~.

83 F8 25 AID: 3'l Mr. James P. O'Reilly, Director U.S. Nuclear Regulatory Commission Region II, Suite 3100 101 Marietta Street, N.W.

Atlanta, Georgia 30303-

SUBJECT:

Virgil C. Summer Nuclear Station Docket No. 50/395 Operating License No. NPF-12 Thirty Day Written Report LER 83-007, Revision 1

Dear Mr. O'Reilly:

Please find attached Licensee Event Report #83-007, Revision 1, for Virgil C. Summer Nuclear Station. This Thirty Day Report is required by Technical Specification 6.'9.1.13.(b) as a result of entry into Action Statement (a) of Technical Specification 3.3.3.5, " Remote Shutdown Instrumentation," on January 24, 1983.

Revision 1 to this LER corrects an administrative error discovered by the Licensee. Should there be any questions, please call us at your convenience.

Very truly ours, O. W. Died , .

CJM:OWD:dwf/fjc Attachment cc: V. C. Summer A. R. Koon T. C. Nichols, Jr. G. D. Moffatt E. C. Roberts Site QA O. W. Dixon, Jr. C. L. Ligon (NSRC)

H. N. Cyrus G. J. Braddick H. T. Babb J. L. Skolds D. A. Nauman J. B. Knotts, Jr.

M. B. Whitaker, Jr. B. A. Bursey W. A. Williams, Jr. I&E (Washington)

O. S. Bradham Document Management Branch R. B. Clary INPO Records Center C. A. Price NPCF File 8303010495 B30222 UI'FICIAT" COPY PDR ADDCK 05000395 S PDR fggg

Mr. James P. O'Reilly LER No.93-007,. Revision 1 P&ge Two February 22, 1983 DETAILED DESCRIPTION OF EVENT On January 24, 1983, with the Plant in Mode 1, the NRC Resident Inspector identified a discrepancy of 9% between the Main Control Board and Control Room Evacuation Panel (CREP) indication for Pressurizer _ Relief Tank Level. The Channel Check performed by the licensee, in compliance with Technical Specification Surveillance Requirement 4.3.3.5, has an established maximum deviation of 4%

between the redundant indicators. A Channel Check performed on January 3, 1983, indicated that since the redundant channels were within the 4% allowable deviation, the out-of-tolerance condition occurred after that date.

The CREP indication (LI-470A) was declared inoperable at 1145 hours0.0133 days <br />0.318 hours <br />0.00189 weeks <br />4.356725e-4 months <br /> on January 24, 1983, in accordance with Action Statement (a) of Technical Specification 3.3.3.5.

PROBABLE CONSEQUENCES There were no adverse consequences from this event. The level indication was functional _but drifted high during the period of time between January 3 through 24, 1983.

CAUSE(S) OF THE OCCURRENCE The cause of the occurrence is attributed to instrument drif t.

IMMEDIATE CORRECTIVE ACTIONS TAKEN A calibration was performed on the Main Control Board and CREP indication channels for Pressurizer Relief Tank Level. Level transmitter LT-470A, which provides indication to the CREP, was l found to have u zero shift of approximately 8% in the high i

direction. The tc nsmitter was calibrated and returned to operable status on uanuary 25, 1983, at 1630 hours0.0189 days <br />0.453 hours <br />0.0027 weeks <br />6.20215e-4 months <br />, upon the satisfactory completicn of a Channel Check performed with the appropriate surveillance test procedure.

l i

Mr. James P. O'Reilly LER No.83-007, Revision 1 Page Three February 22,-1983 ACTION TAKEN TO PREVENT RECURRENCE The licensee has initiated the following actions to prevent recurrence: ,

~

'l.- Level transmitter LT-470A is scheduled for replacement during'the next scheduled outage.

-in March 1983. The exact time of the equipment replacement is dependent upon-the receipt of the new transmitter 1from the vendor.

2. The monthly Channel check performed on Pressurizer Relief Tank Level will be accomplished.on a weekly basis until the transmitter is replaced. A transmitter calibration will be performed if a deviation of 3% or greater is observed.