MONTHYEARML20217J3141999-10-15015 October 1999 Requests Emergency Publication of Document Entitled South Carolina Electric & Gas Co;Vc Summer Nuclear Station,Environ Assessment Transmitted on 991015 to Ofc of Fr for Publication ML20217J3281999-10-15015 October 1999 Forwards Copy of Environ Assessment & Finding of No Significant Impact Re Application for Exemption from Requiremets of 10CFR50,Section 50.60(a) for VC Summer Nuclear Station ML20217F8851999-10-0808 October 1999 Forwards Insp Rept 50-395/99-06 on 990801-0911.One Violation Occurred Being Treated as NCV RC-99-0192, Forwards Updated 1999 ECCS Evaluation Model Revs Rept for VC Summer Nuclear Station.Rept Is Being Submitted Pursuant to 10CFR50.46,which Requires Licensees to Notify NRC of Corrections to or Changes in ECCS Evaluation Models1999-09-28028 September 1999 Forwards Updated 1999 ECCS Evaluation Model Revs Rept for VC Summer Nuclear Station.Rept Is Being Submitted Pursuant to 10CFR50.46,which Requires Licensees to Notify NRC of Corrections to or Changes in ECCS Evaluation Models RC-99-0181, Forwards Anticipated Schedule for Operator Licensing Examinations.Sce&G Requests That NRC Prepare Examinations Stated on Attachment1999-09-21021 September 1999 Forwards Anticipated Schedule for Operator Licensing Examinations.Sce&G Requests That NRC Prepare Examinations Stated on Attachment ML20212C5091999-09-15015 September 1999 Forwards Anticipated Schedule for Operator Licensing Exams for Sce&G.Util Requests That NRC Prepare Exams on Encl RC-99-0184, Submits Seven Requests for Using Alternatives to Requirements of ASME Code,Section XI Re Subsection IWE & Iwl Insps to Be Performed at Vsns.Proposed Alternatives Will Provide Acceptable Level of Quality & Safety1999-09-15015 September 1999 Submits Seven Requests for Using Alternatives to Requirements of ASME Code,Section XI Re Subsection IWE & Iwl Insps to Be Performed at Vsns.Proposed Alternatives Will Provide Acceptable Level of Quality & Safety ML20212A8341999-09-0909 September 1999 Requests That Licensees Affected by Kaowool Fire Barriers Take Issue on Voluntary Initiative & Propose Approach for Resolving Subj Issues.Staff Plans to Meet with Licensees to Discuss Listed Topics ML20212A6951999-09-0909 September 1999 Requests That Licensees Affected by Kaowool Fire Barriers Take Issue on Voluntary Initiative & Propose Approach for Resolving Subj Issues.Staff Plans to Meet with Licensees to Discuss Listed Topics ML20211N4301999-09-0808 September 1999 Discusses Proposed Meeting to Discuss Kaowool Fire Barriers. Staff Requesting That Affected Licensees Take Issue on Voluntary Initative & Propose Approach for Resolving Issues ML20211Q8911999-09-0101 September 1999 Sumbits Summary of Training Managers Conference on Recent Changes to Operator Licensing Program.Meeting Covered Changes to Regulations,Exam Stds,New Insp Program & Other Training Issues.List of Attendees Encl RC-99-0177, Forwards Rev 2 to VC Summer Nuclear Station,Colr for Cycle 12, IAW Section 6.9.1.111999-08-31031 August 1999 Forwards Rev 2 to VC Summer Nuclear Station,Colr for Cycle 12, IAW Section 6.9.1.11 RC-99-0173, Requests That Info Listed in Rvid,Version 2,be Amended to Reflect Date for VC Summer Nuclear Station,As Marked in Encl to Ltr1999-08-31031 August 1999 Requests That Info Listed in Rvid,Version 2,be Amended to Reflect Date for VC Summer Nuclear Station,As Marked in Encl to Ltr ML20211L5181999-08-30030 August 1999 Forwards Insp Rept 50-395/99-05 on 990620-0731.One Violation Identified & Being Treated as non-cited Violation Consistent with App C of Enforcement Policy ML20211H2481999-08-25025 August 1999 Forwards Four Controlled Copies of Amend 43 to Physcial Security Plan. Summary of Plan Changes, Are Included as Part of Each Controlled Copy.Encls Withheld Per 10CFR73.21 05000395/LER-1999-004, Submits Suppl 1 to LER 99-004-00 Re Discovery of Several Fuel Assembly Top Nozzle Holdown Screws Which Had Failed. Root Cause Will Not Be Completed by 990829,as Committed.W Analysis Will Be Issued After Fall Outages Are Complet1999-08-24024 August 1999 Submits Suppl 1 to LER 99-004-00 Re Discovery of Several Fuel Assembly Top Nozzle Holdown Screws Which Had Failed. Root Cause Will Not Be Completed by 990829,as Committed.W Analysis Will Be Issued After Fall Outages Are Completed RC-99-0171, Notifies NRC of Intent Re Submittal of Application to Renew OL of Vcs.Preparatory Work Has Begun to Develop Application for License Renewal to Be Submitted After 020806 Contingent Upon Final Approval of Board of Directors1999-08-23023 August 1999 Notifies NRC of Intent Re Submittal of Application to Renew OL of Vcs.Preparatory Work Has Begun to Develop Application for License Renewal to Be Submitted After 020806 Contingent Upon Final Approval of Board of Directors RC-99-0152, Seeks Exemption Under 10CFR0.12a(2)ii from 10CFR50,App G Requirements to Establish pressure-temperature Limits Curves Using Methodology Presented in 1989 ASME Section Xi,App G1999-08-19019 August 1999 Seeks Exemption Under 10CFR0.12a(2)ii from 10CFR50,App G Requirements to Establish pressure-temperature Limits Curves Using Methodology Presented in 1989 ASME Section Xi,App G RC-99-0164, Forwards semi-annual Fitness for Duty Rept from 990101 to 990630 for VC Summer Nuclear Station,Iaw 10CFR26.71(d)1999-08-17017 August 1999 Forwards semi-annual Fitness for Duty Rept from 990101 to 990630 for VC Summer Nuclear Station,Iaw 10CFR26.71(d) ML20210Q4851999-08-0505 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006 at VC Summer.Requests Info Re Individuals Who Will Take Exam,Personnel Who Will Have Access to Exam.Sample Registration Ltr Encl ML20210R5501999-08-0505 August 1999 Ack Receipt of 990707 Response to NCVs Identified on 990607 Re Activities Conducted at VC Summer.Informs That After Consideration of Basis for Denial of NCV 50-395/99-03, Concluded,For Reasons Stated,That NCV Occurred RC-99-0156, Forwards Rev 1 to VC Summer Nuclear Station COLR for Cycle 12, IAW TS Section 6.9.1.11.Sections 2.1 & 3.0 Were Added to Include Beacon Tsm1999-08-0404 August 1999 Forwards Rev 1 to VC Summer Nuclear Station COLR for Cycle 12, IAW TS Section 6.9.1.11.Sections 2.1 & 3.0 Were Added to Include Beacon Tsm RC-99-0147, Submits Attached Request for Relief from Performing SG PORV Strike Time Testing to Acceptance Criteria of Asme/Ansi OMa-19881999-07-26026 July 1999 Submits Attached Request for Relief from Performing SG PORV Strike Time Testing to Acceptance Criteria of Asme/Ansi OMa-1988 ML20210B7451999-07-22022 July 1999 Informs That as Result of Staff Review of Licensee Responses to GL 92-01,rev 1 & Rev 1,suppl 1,staff Revised Info in Reactor Vessel Integrity Database & Releasing Database as Rvid Version 2 ML20210E3771999-07-16016 July 1999 Forwards Insp Rept 50-395/99-04 on 990509-0619.One Violation Being Treated as Noncited Violation RC-99-0127, Estimates Submittal of Eleven Licensing Actions in Fy 2000. Based on Statistical Estimates of Past Licensing Actions, Number of Licensing Actions in Fy 2001 Should Be Approx Ten, in Response to AL 99-021999-07-0707 July 1999 Estimates Submittal of Eleven Licensing Actions in Fy 2000. Based on Statistical Estimates of Past Licensing Actions, Number of Licensing Actions in Fy 2001 Should Be Approx Ten, in Response to AL 99-02 RC-99-0129, Provides Response to non-cited Violations Noted in Insp Rept 50-395/99-03.C/As:concluded That Cask Loading Pit Inaccessible & Duration of Dose Rates on Operating Floor of Fhb So Short That High Radiation Area Did Not Exist1999-07-0707 July 1999 Provides Response to non-cited Violations Noted in Insp Rept 50-395/99-03.C/As:concluded That Cask Loading Pit Inaccessible & Duration of Dose Rates on Operating Floor of Fhb So Short That High Radiation Area Did Not Exist RC-99-0131, Forwards Rev 9 to VC Summer Nuclear Station Safeguards Contingency Plan,Per 10CFR50.54(p).Encl Withheld1999-07-0707 July 1999 Forwards Rev 9 to VC Summer Nuclear Station Safeguards Contingency Plan,Per 10CFR50.54(p).Encl Withheld ML20210B7111999-07-0606 July 1999 Provides Summary of 990701 Meeting with Sce&G in Atlanta, Georgia Re Recent Virgil C Summer Refueling Outage & Other Items of Interest.List of Meeting Attendees & Licensee Presentation Handouts Encl RC-99-0114, Submits Response to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps, Under Oath or Affirmation1999-06-30030 June 1999 Submits Response to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps, Under Oath or Affirmation ML20195H5861999-06-0707 June 1999 Confirms 990604 Telcon Between J Proper & R Haag Re Meeting Scheduled for 990701 in Atlanta,Ga,To Discuss Plant Refueling Outage & Items of Interest ML20207H5241999-06-0707 June 1999 Forwards Insp Rept 50-395/99-03 on 990328-0508.Six Violations of NRC Requirements Occurred & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy ML20207D1881999-05-28028 May 1999 Informs That Effective 990524,K Cotton Assigned as Project Manager,Project Directorate II-1,for Virgil C Summer Nuclear Station 05000395/LER-1999-006, Forwards LER 99-006-00,describing Identified Safety Hazard with GE 7.2kV Magne-Blast Circuit Breakers.Event Is Being Reported Per 10CFR21.21a(1)1999-05-17017 May 1999 Forwards LER 99-006-00,describing Identified Safety Hazard with GE 7.2kV Magne-Blast Circuit Breakers.Event Is Being Reported Per 10CFR21.21a(1) RC-99-0104, Forwards Amend 17 to Training & Qualification Plan, Under Provisions of 10CFR50.54(p).Summary of Plan Changes Is Included as Part of Controlled Copy1999-05-13013 May 1999 Forwards Amend 17 to Training & Qualification Plan, Under Provisions of 10CFR50.54(p).Summary of Plan Changes Is Included as Part of Controlled Copy RC-99-0105, Forwards Copy of Sce&G Co 1998 Annual Financial Rept & Sc Public Service Authority 1998 Annual Financial Rept, for VC Summer Nuclear Station1999-05-13013 May 1999 Forwards Copy of Sce&G Co 1998 Annual Financial Rept & Sc Public Service Authority 1998 Annual Financial Rept, for VC Summer Nuclear Station 05000395/LER-1999-005, Forwards LER 99-005-00 for VC Summer Nuclear Station.Rept Describes Potential Condition for Exceeding Vsns Plant Design Basis Due to Submergence Qualification Issues for Certain ESF Components1999-05-12012 May 1999 Forwards LER 99-005-00 for VC Summer Nuclear Station.Rept Describes Potential Condition for Exceeding Vsns Plant Design Basis Due to Submergence Qualification Issues for Certain ESF Components ML20206L5121999-05-11011 May 1999 Informs That NRC Reorganized,Effective 990328.Reorganization Chart Encl ML20206P5771999-05-0707 May 1999 Informs That During 980519 Telcon Between T Matlosz & G Hopper,Arrangements Were Made for Administration of Licensing Exam at Virgil C Summer Nuclear Station During Wk of 990927 RC-99-0080, Submits Supplemental Info Re 970128 Response to NRC GL 96-06 Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions. Addl Analysis & Manpower Expenditure Involved Not Cost Effective1999-05-0606 May 1999 Submits Supplemental Info Re 970128 Response to NRC GL 96-06 Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions. Addl Analysis & Manpower Expenditure Involved Not Cost Effective RC-99-0097, Forwards Sce&G Cycle 12 COLR, IAW TS Section 6.9.1.111999-05-0606 May 1999 Forwards Sce&G Cycle 12 COLR, IAW TS Section 6.9.1.11 RC-99-0092, Informs That Util Has Reviewed Proposed Notice of Rulemaking & Fully Endorse Comments Prepared & Submitted on Behalf of Commercial Nuclear Power Industry by NEI1999-05-0303 May 1999 Informs That Util Has Reviewed Proposed Notice of Rulemaking & Fully Endorse Comments Prepared & Submitted on Behalf of Commercial Nuclear Power Industry by NEI RC-99-0090, Submits Special Rept (Spr 1999-003) Re Completion of ISI of SG Tubes,Indicating Number of Tubes Plugged or Repaired in Each Generator,Per TS 4.4.5.5.a & Section 4.4.5.5.b1999-04-29029 April 1999 Submits Special Rept (Spr 1999-003) Re Completion of ISI of SG Tubes,Indicating Number of Tubes Plugged or Repaired in Each Generator,Per TS 4.4.5.5.a & Section 4.4.5.5.b ML20206E1681999-04-29029 April 1999 Informs That FERC & NRC Will Conduct Category I Svc Water Pond (Swp) Dam Insp at Facility on 990610 ML20206P5021999-04-26026 April 1999 Forwards Insp Rept 50-395/99-02 on 990214-0327.One Violation of NRC Requirements Occurred & Being Treated as non-cited Violation,Consistent with App C of Enforcement Policy ML20205M0431999-04-13013 April 1999 Eighth Partial Response to FOIA Request for Records.App Q & R Records Encl & Being Made Available in PDR 05000395/LER-1999-002, Forwards LER 99-002-00 Re Condition for Exceeding Vsns Design Basis During Surveillance Testing Utilizing Certain ECCS Valves.Simplified Flow Diagram Included to Identify Configurations Discussed by Rept Encl1999-04-12012 April 1999 Forwards LER 99-002-00 Re Condition for Exceeding Vsns Design Basis During Surveillance Testing Utilizing Certain ECCS Valves.Simplified Flow Diagram Included to Identify Configurations Discussed by Rept Encl ML20205T2311999-04-0909 April 1999 Informs That on 990318,A Koon & Ho Christensen Confirmed Initial Operator Licensing Exam Scheduled for Y2K.Initial Exam Date Schedules for Wk of 000807 for Approx Eight Candidates ML20205G4181999-04-0101 April 1999 Advises That 970725 Application & Affidavit Which Submitted, WCAP-14932, Probabilistic & Economic Evaluation of Reactor Vessel Closure Head Penetration Integrity for Plant, Will Be Withheld from Public Disclosure,Per 10CFR2.790(a)(4) RC-99-0078, Submits Summary of Present Levels of Property Insurance & Cash Flow Statement for VC Summer Nuclear Station,Per 10CFR50.54(w)(3) & 10CFR140.21(e)1999-04-0101 April 1999 Submits Summary of Present Levels of Property Insurance & Cash Flow Statement for VC Summer Nuclear Station,Per 10CFR50.54(w)(3) & 10CFR140.21(e) 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARRC-99-0192, Forwards Updated 1999 ECCS Evaluation Model Revs Rept for VC Summer Nuclear Station.Rept Is Being Submitted Pursuant to 10CFR50.46,which Requires Licensees to Notify NRC of Corrections to or Changes in ECCS Evaluation Models1999-09-28028 September 1999 Forwards Updated 1999 ECCS Evaluation Model Revs Rept for VC Summer Nuclear Station.Rept Is Being Submitted Pursuant to 10CFR50.46,which Requires Licensees to Notify NRC of Corrections to or Changes in ECCS Evaluation Models RC-99-0181, Forwards Anticipated Schedule for Operator Licensing Examinations.Sce&G Requests That NRC Prepare Examinations Stated on Attachment1999-09-21021 September 1999 Forwards Anticipated Schedule for Operator Licensing Examinations.Sce&G Requests That NRC Prepare Examinations Stated on Attachment ML20212C5091999-09-15015 September 1999 Forwards Anticipated Schedule for Operator Licensing Exams for Sce&G.Util Requests That NRC Prepare Exams on Encl RC-99-0184, Submits Seven Requests for Using Alternatives to Requirements of ASME Code,Section XI Re Subsection IWE & Iwl Insps to Be Performed at Vsns.Proposed Alternatives Will Provide Acceptable Level of Quality & Safety1999-09-15015 September 1999 Submits Seven Requests for Using Alternatives to Requirements of ASME Code,Section XI Re Subsection IWE & Iwl Insps to Be Performed at Vsns.Proposed Alternatives Will Provide Acceptable Level of Quality & Safety RC-99-0177, Forwards Rev 2 to VC Summer Nuclear Station,Colr for Cycle 12, IAW Section 6.9.1.111999-08-31031 August 1999 Forwards Rev 2 to VC Summer Nuclear Station,Colr for Cycle 12, IAW Section 6.9.1.11 RC-99-0173, Requests That Info Listed in Rvid,Version 2,be Amended to Reflect Date for VC Summer Nuclear Station,As Marked in Encl to Ltr1999-08-31031 August 1999 Requests That Info Listed in Rvid,Version 2,be Amended to Reflect Date for VC Summer Nuclear Station,As Marked in Encl to Ltr ML20211H2481999-08-25025 August 1999 Forwards Four Controlled Copies of Amend 43 to Physcial Security Plan. Summary of Plan Changes, Are Included as Part of Each Controlled Copy.Encls Withheld Per 10CFR73.21 05000395/LER-1999-004, Submits Suppl 1 to LER 99-004-00 Re Discovery of Several Fuel Assembly Top Nozzle Holdown Screws Which Had Failed. Root Cause Will Not Be Completed by 990829,as Committed.W Analysis Will Be Issued After Fall Outages Are Complet1999-08-24024 August 1999 Submits Suppl 1 to LER 99-004-00 Re Discovery of Several Fuel Assembly Top Nozzle Holdown Screws Which Had Failed. Root Cause Will Not Be Completed by 990829,as Committed.W Analysis Will Be Issued After Fall Outages Are Completed RC-99-0171, Notifies NRC of Intent Re Submittal of Application to Renew OL of Vcs.Preparatory Work Has Begun to Develop Application for License Renewal to Be Submitted After 020806 Contingent Upon Final Approval of Board of Directors1999-08-23023 August 1999 Notifies NRC of Intent Re Submittal of Application to Renew OL of Vcs.Preparatory Work Has Begun to Develop Application for License Renewal to Be Submitted After 020806 Contingent Upon Final Approval of Board of Directors RC-99-0152, Seeks Exemption Under 10CFR0.12a(2)ii from 10CFR50,App G Requirements to Establish pressure-temperature Limits Curves Using Methodology Presented in 1989 ASME Section Xi,App G1999-08-19019 August 1999 Seeks Exemption Under 10CFR0.12a(2)ii from 10CFR50,App G Requirements to Establish pressure-temperature Limits Curves Using Methodology Presented in 1989 ASME Section Xi,App G RC-99-0164, Forwards semi-annual Fitness for Duty Rept from 990101 to 990630 for VC Summer Nuclear Station,Iaw 10CFR26.71(d)1999-08-17017 August 1999 Forwards semi-annual Fitness for Duty Rept from 990101 to 990630 for VC Summer Nuclear Station,Iaw 10CFR26.71(d) RC-99-0156, Forwards Rev 1 to VC Summer Nuclear Station COLR for Cycle 12, IAW TS Section 6.9.1.11.Sections 2.1 & 3.0 Were Added to Include Beacon Tsm1999-08-0404 August 1999 Forwards Rev 1 to VC Summer Nuclear Station COLR for Cycle 12, IAW TS Section 6.9.1.11.Sections 2.1 & 3.0 Were Added to Include Beacon Tsm RC-99-0147, Submits Attached Request for Relief from Performing SG PORV Strike Time Testing to Acceptance Criteria of Asme/Ansi OMa-19881999-07-26026 July 1999 Submits Attached Request for Relief from Performing SG PORV Strike Time Testing to Acceptance Criteria of Asme/Ansi OMa-1988 RC-99-0129, Provides Response to non-cited Violations Noted in Insp Rept 50-395/99-03.C/As:concluded That Cask Loading Pit Inaccessible & Duration of Dose Rates on Operating Floor of Fhb So Short That High Radiation Area Did Not Exist1999-07-0707 July 1999 Provides Response to non-cited Violations Noted in Insp Rept 50-395/99-03.C/As:concluded That Cask Loading Pit Inaccessible & Duration of Dose Rates on Operating Floor of Fhb So Short That High Radiation Area Did Not Exist RC-99-0131, Forwards Rev 9 to VC Summer Nuclear Station Safeguards Contingency Plan,Per 10CFR50.54(p).Encl Withheld1999-07-0707 July 1999 Forwards Rev 9 to VC Summer Nuclear Station Safeguards Contingency Plan,Per 10CFR50.54(p).Encl Withheld RC-99-0127, Estimates Submittal of Eleven Licensing Actions in Fy 2000. Based on Statistical Estimates of Past Licensing Actions, Number of Licensing Actions in Fy 2001 Should Be Approx Ten, in Response to AL 99-021999-07-0707 July 1999 Estimates Submittal of Eleven Licensing Actions in Fy 2000. Based on Statistical Estimates of Past Licensing Actions, Number of Licensing Actions in Fy 2001 Should Be Approx Ten, in Response to AL 99-02 RC-99-0114, Submits Response to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps, Under Oath or Affirmation1999-06-30030 June 1999 Submits Response to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps, Under Oath or Affirmation 05000395/LER-1999-006, Forwards LER 99-006-00,describing Identified Safety Hazard with GE 7.2kV Magne-Blast Circuit Breakers.Event Is Being Reported Per 10CFR21.21a(1)1999-05-17017 May 1999 Forwards LER 99-006-00,describing Identified Safety Hazard with GE 7.2kV Magne-Blast Circuit Breakers.Event Is Being Reported Per 10CFR21.21a(1) RC-99-0104, Forwards Amend 17 to Training & Qualification Plan, Under Provisions of 10CFR50.54(p).Summary of Plan Changes Is Included as Part of Controlled Copy1999-05-13013 May 1999 Forwards Amend 17 to Training & Qualification Plan, Under Provisions of 10CFR50.54(p).Summary of Plan Changes Is Included as Part of Controlled Copy RC-99-0105, Forwards Copy of Sce&G Co 1998 Annual Financial Rept & Sc Public Service Authority 1998 Annual Financial Rept, for VC Summer Nuclear Station1999-05-13013 May 1999 Forwards Copy of Sce&G Co 1998 Annual Financial Rept & Sc Public Service Authority 1998 Annual Financial Rept, for VC Summer Nuclear Station 05000395/LER-1999-005, Forwards LER 99-005-00 for VC Summer Nuclear Station.Rept Describes Potential Condition for Exceeding Vsns Plant Design Basis Due to Submergence Qualification Issues for Certain ESF Components1999-05-12012 May 1999 Forwards LER 99-005-00 for VC Summer Nuclear Station.Rept Describes Potential Condition for Exceeding Vsns Plant Design Basis Due to Submergence Qualification Issues for Certain ESF Components RC-99-0097, Forwards Sce&G Cycle 12 COLR, IAW TS Section 6.9.1.111999-05-0606 May 1999 Forwards Sce&G Cycle 12 COLR, IAW TS Section 6.9.1.11 RC-99-0080, Submits Supplemental Info Re 970128 Response to NRC GL 96-06 Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions. Addl Analysis & Manpower Expenditure Involved Not Cost Effective1999-05-0606 May 1999 Submits Supplemental Info Re 970128 Response to NRC GL 96-06 Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions. Addl Analysis & Manpower Expenditure Involved Not Cost Effective RC-99-0092, Informs That Util Has Reviewed Proposed Notice of Rulemaking & Fully Endorse Comments Prepared & Submitted on Behalf of Commercial Nuclear Power Industry by NEI1999-05-0303 May 1999 Informs That Util Has Reviewed Proposed Notice of Rulemaking & Fully Endorse Comments Prepared & Submitted on Behalf of Commercial Nuclear Power Industry by NEI RC-99-0090, Submits Special Rept (Spr 1999-003) Re Completion of ISI of SG Tubes,Indicating Number of Tubes Plugged or Repaired in Each Generator,Per TS 4.4.5.5.a & Section 4.4.5.5.b1999-04-29029 April 1999 Submits Special Rept (Spr 1999-003) Re Completion of ISI of SG Tubes,Indicating Number of Tubes Plugged or Repaired in Each Generator,Per TS 4.4.5.5.a & Section 4.4.5.5.b 05000395/LER-1999-002, Forwards LER 99-002-00 Re Condition for Exceeding Vsns Design Basis During Surveillance Testing Utilizing Certain ECCS Valves.Simplified Flow Diagram Included to Identify Configurations Discussed by Rept Encl1999-04-12012 April 1999 Forwards LER 99-002-00 Re Condition for Exceeding Vsns Design Basis During Surveillance Testing Utilizing Certain ECCS Valves.Simplified Flow Diagram Included to Identify Configurations Discussed by Rept Encl RC-99-0078, Submits Summary of Present Levels of Property Insurance & Cash Flow Statement for VC Summer Nuclear Station,Per 10CFR50.54(w)(3) & 10CFR140.21(e)1999-04-0101 April 1999 Submits Summary of Present Levels of Property Insurance & Cash Flow Statement for VC Summer Nuclear Station,Per 10CFR50.54(w)(3) & 10CFR140.21(e) RC-99-0066, Submits Rept of Status of Decommissioning Funding (RR-1950), for Vsns Per 10CFR50.751999-03-31031 March 1999 Submits Rept of Status of Decommissioning Funding (RR-1950), for Vsns Per 10CFR50.75 ML20205B9981999-03-29029 March 1999 Informs That Authority & Sce&G Has Ownership Interests of one-third & two-thirds,respectively in VC Summer Nuclear Station.Operating License Scheduled to Expire in 2022.Rept Addresses Decommissioning Cost Estimates & Financing RC-99-0054, Forwards Rev 2 to VC Summer Nuclear Station Training Simulator Quadrennial Certification Rept,1996-99, Per 10CFR55.45(b)(5)(ii)1999-03-22022 March 1999 Forwards Rev 2 to VC Summer Nuclear Station Training Simulator Quadrennial Certification Rept,1996-99, Per 10CFR55.45(b)(5)(ii) RC-99-0053, Requests That Implementation Date of Proposed TS Change Request Re Best Estimate Analyzer for Core Operations - Nuclear (Beacon) Be Extended. Util Requests 120 Day Time Frame to Perform Initial Beacon Calibrs During Cycle 121999-03-22022 March 1999 Requests That Implementation Date of Proposed TS Change Request Re Best Estimate Analyzer for Core Operations - Nuclear (Beacon) Be Extended. Util Requests 120 Day Time Frame to Perform Initial Beacon Calibrs During Cycle 12 RC-99-0048, Informs That Util Has Implemented Policy That Requires All Personnel Granted Unescorted Access to Vsns Satisfactorily Complete Test on Site Specific Info1999-03-10010 March 1999 Informs That Util Has Implemented Policy That Requires All Personnel Granted Unescorted Access to Vsns Satisfactorily Complete Test on Site Specific Info ML20207J5661999-02-16016 February 1999 Requests That Proprietary Rev 1 to WCAP-14932 Re Rv Closure Head Penetrations Integrity for VC Summer Nuclear Plant,Be Withheld from Public Disclosure,Per 10CFR2.790(b)(4) RC-99-0026, Provides Response to NRC RAI Re TS Change Request Re Best Estimate Analyzer for Core Operations - Nuclear1999-02-0505 February 1999 Provides Response to NRC RAI Re TS Change Request Re Best Estimate Analyzer for Core Operations - Nuclear RC-99-0023, Informs That in Response to GL 97-06,SCE&G Informed NRC of Plan to Perform Secondary Side Examination Scheduled for Refueling Outage RF-11.SCE&G Has Decided to Defer Secondary Side Insp of Sg.Reasons for Change of Plan Listed1999-02-0101 February 1999 Informs That in Response to GL 97-06,SCE&G Informed NRC of Plan to Perform Secondary Side Examination Scheduled for Refueling Outage RF-11.SCE&G Has Decided to Defer Secondary Side Insp of Sg.Reasons for Change of Plan Listed 05000395/LER-1998-009, Forwards LER 98-009-01 for VC Summer Nuclear Station.Rept Describes Unanalyzed Condition for non-safety Related Component for Which All Failure Mechanisms Had Not Been Evaluated1999-01-28028 January 1999 Forwards LER 98-009-01 for VC Summer Nuclear Station.Rept Describes Unanalyzed Condition for non-safety Related Component for Which All Failure Mechanisms Had Not Been Evaluated RC-99-0015, Forwards Amend 16 to Training & Qualification Plan,Per 10CFR50.54(p).Summary of Changes,Encl1999-01-22022 January 1999 Forwards Amend 16 to Training & Qualification Plan,Per 10CFR50.54(p).Summary of Changes,Encl RC-99-0005, Responds to 980908 RAI Re GL 97-01, Degradation of Control Rod Drive Mechanism Nozzle & Other Vessel Closure Head Penetrations1999-01-15015 January 1999 Responds to 980908 RAI Re GL 97-01, Degradation of Control Rod Drive Mechanism Nozzle & Other Vessel Closure Head Penetrations RC-98-0225, Forwards Rev 41 to EP-100, Radiation Emergency Plan. List of Changes by Page Number Affected by Rev 41 Also Encl1998-12-14014 December 1998 Forwards Rev 41 to EP-100, Radiation Emergency Plan. List of Changes by Page Number Affected by Rev 41 Also Encl RC-98-0226, Forwards Amend 42 to Psp.Changes Do Not Degrade Safeguards Effectiveness in PSP or Safeguards Contingency Plan,As Described in 10CFR50.54(p).Without Encl1998-12-14014 December 1998 Forwards Amend 42 to Psp.Changes Do Not Degrade Safeguards Effectiveness in PSP or Safeguards Contingency Plan,As Described in 10CFR50.54(p).Without Encl RC-98-0216, Requests Extension of Response Period to 990115 to Respond to NRC 980908 RAI Re GL 97-01, Degradation of CRDM Nozzle & Other Vessel Closure Head Penetrations. Util Intends to Utilize Industry Generic RAI Response1998-12-0404 December 1998 Requests Extension of Response Period to 990115 to Respond to NRC 980908 RAI Re GL 97-01, Degradation of CRDM Nozzle & Other Vessel Closure Head Penetrations. Util Intends to Utilize Industry Generic RAI Response RC-98-0189, Provides Assessment Results of GL 98-02, Loss of Rc Inventory & Associated Potential for Loss of Emergency Mitigation Functions While in Shutdown Condition, Per 10CFR50.54f1998-11-24024 November 1998 Provides Assessment Results of GL 98-02, Loss of Rc Inventory & Associated Potential for Loss of Emergency Mitigation Functions While in Shutdown Condition, Per 10CFR50.54f RC-98-0207, Forwards 120-day Response to NRC GL 98-04, Potential for Degradation of ECCS & CSS After LOCA Because of Construction & Protective Coating Deficiencies & Foreign Matl in Containment1998-11-11011 November 1998 Forwards 120-day Response to NRC GL 98-04, Potential for Degradation of ECCS & CSS After LOCA Because of Construction & Protective Coating Deficiencies & Foreign Matl in Containment RC-98-0177, Informs That Sce&G Will Classify as Moderate Any Stratification Condition That Results in Total Cuf,Based on Design Basis Values Plus Any Contribution from Stratification,Of Between 0.1 & 0.71998-11-0909 November 1998 Informs That Sce&G Will Classify as Moderate Any Stratification Condition That Results in Total Cuf,Based on Design Basis Values Plus Any Contribution from Stratification,Of Between 0.1 & 0.7 RC-98-0194, Provides Response to RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of SR Movs1998-11-0202 November 1998 Provides Response to RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of SR Movs RC-98-0202, Forwards Response to RAI Re Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions1998-10-30030 October 1998 Forwards Response to RAI Re Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions RC-98-0186, Expresses Appreciation for Opportunity to Present Topical Rept TR-104965, On-Line Monitoring of Instrument Channel Performance1998-10-26026 October 1998 Expresses Appreciation for Opportunity to Present Topical Rept TR-104965, On-Line Monitoring of Instrument Channel Performance RC-98-0185, Forwards non-proprietary Trs,Including Rev 0 to WCAP-15101, Analysis of Capsule W from Sce&G VC Summer Unit 1 Rv Radiation Surveillance Program & Rev 0 to WCAP-15103, Evaluation of PTS for VC Summer Unit 11998-10-0909 October 1998 Forwards non-proprietary Trs,Including Rev 0 to WCAP-15101, Analysis of Capsule W from Sce&G VC Summer Unit 1 Rv Radiation Surveillance Program & Rev 0 to WCAP-15103, Evaluation of PTS for VC Summer Unit 1 RC-98-0182, Responds to 980402 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs1998-10-0808 October 1998 Responds to 980402 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs RC-98-0178, Provides Comments on SALP Insp Rept 50-395/98-99.Util Ack That Station Can Enhance Future Performance Further with More Focus & Attention on Change Mgt Practices Re Plant & Procedure Changes1998-10-0505 October 1998 Provides Comments on SALP Insp Rept 50-395/98-99.Util Ack That Station Can Enhance Future Performance Further with More Focus & Attention on Change Mgt Practices Re Plant & Procedure Changes 1999-09-28
[Table view] |
Text
.
s i; "
4 -.; -
e 4 a;
- g E G_
A SCANA COMPANY R 99 014 Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555 Attention: Ms. K. R. Cotton Gentlemen:
1
Subject:
VIRGIL C. SUMMER NUCLEAR STATION
DOCKET NO. 50/395 g$'[','[,"[g OPERATING LICENSE NO. NPF-12 STEAM GENERATOR - PORV STROKE TIME RELIEF REQUEST (NRR 990001)
South Carolina Electric and Gas Company (SCE&G) hereby submits the attached request for relief from performing steam generator power operated
~7 relief valve (SG-PORV) stroke time testing to the acceptance criteria of ASME/ ANSI OMa-1988.Section XI of the 1989 Edition of the ASME Code
' South Cm!ino mctric a cos to ; requires that the 1988 addenda of part 10 to the ASME/ ANSI Operations and Virgil C 5mner Nodecr 5tation - Maintenance Code (OM-10) be used when performing inservice testing (IST) )
l' 0. Ba 881 for valves. This code effectively restricts the SG-PORV stroke time to a e ine, seuth tmlina tolerance of less than i 5 seconds of the reference value. The inherent stroke time variances in the operators of the VCSNS SG-PORVs preclude achieving so3345;m4-- consistent stroke times within the allowed OM-10 tolerances. SCE&G requests, 803345.5209 as an attemate requirement, to apply a maximum performance stroke time limit
- =55= as the acceptance criteria for the SG-PORVs in lieu of the OM-10 tolerance based on the reference value.
u This relief request is necessary because the inherent stroke time variances in ,
the design of the SG-PORVs' operators is greater than the tolerances allowed j by OM-10. However, these variances are well within the design requirements g for the valves function. The alternative requirements of this relief request will P -, ; allow the performance monitoring of the SG-PORVs to be meaningful and realistic for the design of these valves and will prevent the exercise of unnecessarily applying the corrective actions of 4.2.1.9 of OM-10 when there is
- ( , ? no degradation. SCE&G has determined that this alternative acceptance criteria is an appropriate method of monitoring the performance and potential degradation of the VCSNS SG-PORVs due to the unique design of the valve operator and the plant conditions required to test the SG-PORVs. ,\
9909020102 990726 i. I \
c- PDR ADOCK 05000395 R q P PDR .LQ< g i V y . NUGLtAH tXUkLLENCE- A SUMMER TRADITION! :
u
- Docum:nt Control D:sk NRR 990001
. RC-99-0147 Page 2 of,2 :
l SCE&G requests the review and approval of this relief request'as expeditiously as practical.
Should you have any questions, please call Mr. David Haile at (803) 345-4322. or Mr.
Jim Turkett at (803) 345-4047.
,(
z
, Very truly yours, G . r DCH/JT/GJT/dr Attachment c: J. L. Skolds W. F. Conway R. R. Mahan (w/o Attachment)
R. J. White L. A. Reyes K. R. Cotton NRC Resident inspector J. B. Knotts, Jr.
NSRC RTS (NRR 990001)
File (810.19-2)
DMS (RC-99-0147)
~
Document Control D:sk Attachment NRR 990001 RC-99-0147 Page 1 of 3 Request for Relief from ASME/ ANSI OM-10 Acceptance Criteria for Steam Generator PORV Stroke Time Tolerance
Subject:
This relief request relaxes the acceptance criteria for stroke time tolerances imposed by Section XI of the ASME code,1989 edition as they apply to the steam generator PORVs.
Components:
Steam generator power operated relief valves IPV-2000,2010, and 2020.
Current Code Requirement:
Subsection IWV and Subarticle IWA-1600 incorporates the 1988 addenda of the ASME
/ ANSI Operation and Maintenance Code, Part 10, (OM-10) for requirements related to I inservice testing of ASME Code Class 1,2, and 3 valves. Paragraph 4.2.1.8 of OM-10 l titled " Stroke Time Acceptance Criteria," sets stroke time tolerances for various valve types. Valves not stroking within the limits of this paragraph must comply with the applicable corrective actions of 4.2.1.9.(a), (b), (c), (d), and (e). Acceptance criteria 4.2.1.8(b) and (d) apply to the PORVs and states the following: _
1 4.2.1.8(b) Other power-operated valves (non electric-motor operated) with reference l stroke times greater than 10 seconds shall exhibit no more than i 25% change in stroke time when compared to the reference value.
4.2.1.8(d) Other power-operated valves (non electric-motor operated) sNith reference '
stroke times less than or equal to 10 seconds shall exhibit no more than 50% change in stroke time when compared to the reference value.
Note: 4.2.1.8(d), yields a maximum tolerance of i 5 seconds, and 4.2.1.8.(b), would require a reference value of 20 second.c to result in a i 5 seconds tolerance.
Alternative Requirement: '
As an altemative to the above requirements, the following stroke time acceptance criteria will be applied to IPV-2000, IPV-2010, and IPV-2020:
The valve stroke time will be recorded and must exhibit an opening stroke time of less than 16 seconds.
4
y
' Document Control D:sk' Attachment NRR 990001
- (. 6 RC-99-0147 Page 2 of 3 -
Basis for Relief:
LThe inherent seoke time variances in the design of the SG-PORV operators are outside the tolerances adowed by the OM Code but well within the design requirements for the
, valves. The variances are characteristic of the operator design and are not indicative of
- the valve cperational condition.
Also, the conditions under which the valve is tested adversely affect the consistency of the stroke time. The followlag discussion will address the design requirements related to the -
valves, the reason the inherent variances in stroke time are not an indication of valve degradation, and how the test conditions are not conducive to stroke time consistency.
Desian stroke time The SG-PORVs are deceribed in the FSAR, Section 10.4.4 as operating in conjunction with the atmospheric dump valves to provide additional steam dump capacity and as power operated relief valves for the SG secondary side. The Main Steam Design Basis Document states the SG-PORVs regulate steam line pressure following a plant trip with loss of condenser dumps to hold no load conditions. The power relief valves are necessary for the controlled shutdown of the plant if the condenser is unavailable and are specifically relied upon during a Steam Generator tube rupture with a loss of offsite power to mitigate that accident. The main steam safety valves are designed to protect the steam generators from over pressurization, however,-the operation of the SG-PORVs avoids unnecessarily cycling the main steam safety valves.
As containment isolation valves, the SG-PORVs are normally closed and fail closed to prevent an uncontrolled steam release. During norrr,al plant operation, each valve is controlled automatically by steam line pressure or Tavg. The SG-PORVs are closed during normal plant operations and fail closed upon loss of control signal. The valves have a handwheel for local operation if required due to loss of air.
Thus, the SG-PORVs retain a control function for shutting down the reactor to the cold shutdown condition and/or mitigating an accident and a fail safe function for preventing an uncontrolled steam releasc. An engineering evaluation has
- determined that a SG-PORV opening time of 20 seconds fulfills the design function of controlling secondary pressure during a design basis event that closes the main steam isolation valves (MSIVs). There is no time associated with the fail safe function.
i
l w.
Docum:nt Control D:sk-Attachment
- NRR 990001 RC-99-0147 Page 3 of 3 Va'vo I Operator Desian The opening function of the SG-PORVs must meet dual criteria. The valve must open quickly (20 seconds) to handle the steam dump demand of MSIV closure and must also be able to have fine control functions to regulate steam flow for a controlled shutdown. Due to this, the valve operator was designed to use a 1 pneumatic positioner, assisted by a pneumatic booster. When the valve receives a full open signal, the booster assists the valve open to approximately 80% in 2-4 seconds. The final 20% of the opening stroke is controlled at a much slower rate by the positioner. Slight changes in valve conditions such as packing friction, supply pressure, etc. will vary the effect of the pneumatic booster on the initial portion of the opening stroke This varies the percentage- of the total stroke assisted by the booster and thus varies the portion of the stroke controlled by the much slower positioner. Therefore, the valve's full open stroke time will vary even though the valve is functioning as designed.
Testina Conditions Due to the operational impact of stroking open a SG-PORV while at power, the SG-PORVs are tested while isolated. This has two negative impacts on the test :
process. The first is that once a SG-PORV is isolated (from approximately 500*F ,
steam) it immediately begins to cool down and introduces thermal gradients in the I valves clearances and triction bearing surfaces. These gradients introduce conditions in the valve that would not be present during inservice conditions.
Secondly, the design of the valve is such that when the valve is pressurized the pressure actually assists the valve in opening. Therefore, testing the valves while they are isolated, eliminates that assisting opening force and thus affects stroke time.
For the reasons discussed above, the design of the valve and the test conditions for the SG-PORVs will continue to result in stroke times exceeding the tolerance that the OM Code allows. Also, these variances, inherent to the valve operator, would not be indicative of valve degradation. The attemative requirements of this relief request will allow the monitoring of the SG-PORVs performance to be meaningful, and realistic for the unique design of the SG-PORVs, and will prevent the unnecessary exercise of performing the corrective actions of 4.2.1.9 of OM-10 when there is no valve degradation.
l
.