05000395/LER-1983-023, Forwards LER 83-023/03L-0.Detailed Event Analysis Encl

From kanterella
Jump to navigation Jump to search
Forwards LER 83-023/03L-0.Detailed Event Analysis Encl
ML20073C558
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 04/08/1983
From: Dixon O
SOUTH CAROLINA ELECTRIC & GAS CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20073C564 List:
References
NUDOCS 8304130222
Download: ML20073C558 (2)


LER-2083-023, Forwards LER 83-023/03L-0.Detailed Event Analysis Encl
Event date:
Report date:
3952083023R00 - NRC Website

text

.

SOUTH CAROLINA ELECTRIC & GAS COMPANY POST OFFICE 784 COLuusiA. south CAROUNA 29218

o. w. oixos. ;

VICE PRESfDENT NUCLE AR OPERATIONS April 8, 1983 aa -

ca  :

$9 h

^10 Mr. James P. O'Reilly  ;; 63; Regional Administrator ;tm U.S. Nuclear Regulatory Commission P ST Region II, Suite 2900 0 S

101 Marietta Street, N.W. (,7 Atlanta, Georgia 30303  % 6

SUBJECT:

Virgil C. Summer Nuclear Station ,

Docket No. 50/395 .

Operating License No. NPF-12 Thirty Day Written Report LER 83-023

Dear Mr. O'Reilly:

Please find attached Licensee Event Report #83-023 for Virgil C.

Summer Nuclear Station. This Thirty Day Report is required by Technical Specification 6.9.1.13. (b) as a result of entry into Action Statement 16 of Technical Specification 3.3.2, Table 3.3-3, Items 2.c and 3.b.2, " Engineered Safety Feature Actuation System Instrumentation," on March 9, 1983.

Should there be any questions, please call us at your convenience.

Very trul yours, O. W. xon, Jr CJM:OWD/dwr Attachment cc: V. C. Summer G. J. Braddick T. C. Nichols, Jr.,/0. W. Dixon, Jr. J. C. Miller E. C. Roberts J. L. Skolds H. N. Cyrus J. B. Knotts, Jr.

Group / General Managers I&E (Washington)

O. S. Bradham Document Management R. B. Clary Branch C. A. Price INPO Records Center A. R. Koon NPCF D. A. Lavigne File (Lic./Eng.)

C. L. Ligon (NSRC) 8304130222 830408 DR ADDCK 05000395 ..- T Y 3 nyp1CTM ID PDR 8~Ah

Q O

Mr. James P. O'Reilly LER No.83-023 Page Two April 8, 1983 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES

! On March 9,1983, with the Plant in Mode 1, the Main Control Board pressure indication for Reactor Building Pressure Channel 950

, failed low. The instrumentation channel was declared inoperable at 0300 hours0.00347 days <br />0.0833 hours <br />4.960317e-4 weeks <br />1.1415e-4 months <br /> and subsequently placed in the bypassed condition 1

within one (1) hour in compliance with Action Statement 16 of Technical Specification 3.3.2, Table 3.3-3, Items 2.c and 3.b.2.

4 Similar failures have occurred to this instrumentation channel on December 2, 1982 (LER 82-016) and February 3,1983 (LER 83-009).

All of the failures are attributed to the same component failure.

There were no adverse consequences during any of' these events since.the remaining three (3) channels of Reactor Building Pressure remained operable.

CAUSE AND CORRECTIVE ACTIONS The cause of the events is attributed to an intermittent electronic failure of Reactor Building Presssee Transmitter PT-950. Af ter the channel was placed in the bypassed condition on March 9,1983, the circuitry returned to normal operation as previously documented in the earlier failures. The channel was returned to operable status at 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br /> on March 9,1983, after the completion of-a satisfactory surveillance test. The licensee is presently in the process of replacing Reactor Building Pressure Transmitter PT-950 and expects this replacement will prevent a repeat of the previous failures. Since the Plant is presently in an outage, the transmitter replacement is expected to be complete prior to entry into Mode 3.