From: Dixon O
SOUTH CAROLINA ELECTRIC & GAS CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20071B367 List:
References
NUDOCS 8302280196
Download: ML20071B366 (3)


LER-1983-007, Forwards LER 83-007/03L-0.Detailed Event Analysis Encl
Event date:
Report date:
3951983007R00 - NRC Website

text

,.

SOUTH CAROLINA ELECTRIC & GAS COMPANY Po87 OFFICS 764 COLUMe A. SOUTH CAROLINA 29218 g

M ct e

O. W. D1xON. JR.

nJIU.~oEIr%.

February 17, 1983 h

N E5 Mr. James P. O'Reilly, Director U.S. Nuclear Regulatory Commission g

Region II, Suite 3100 a

101 Marietta Street, N.W.

Atlanta, Georgia 30303 SUBJECT: Virgil C. Summer Nuclear Station Docket No. 50/395 Operating License No. NPF-12 Thirty Day Written Report LER 83-007

Dear Mr. O'Reilly:

Please find attached Licensee Event Report #83-007 for Virgil C.

Summer Nuclear Station. This Thirty Day Report is required by_

Technical Specification 6.9.1.13.(b) as a result of entry into Action Statement (a) of Technical Specification 3.3.3.5, " Remote Shutdown Instrumentation," on January 24, 1983.

Should there be any questions, please call us at your convenience.

Ver truly yours

[

u

0. W. Dixon, J.

CJM:0WD:dwf/fJc Attachment A. R. Koon cc:

V. C. Summer G. D. Moffatt T. C. Nichols, Jr.

Site QA E. C. Roberts C. L. Ligon (NSRC)

0. W. Dixon, Jr.

G. J. Braddick H. N. Cyrus J. L. Skolds H. T. Babb J. B. Knotts, Jr.

D. A. Nauman B. A. Bursey M. B. Whitaker, Jr.

I&E (Washington)

W. A. Williams, Jr.

Document Management Branch

0. S. Bradham INP0 Records Center R. B. Clary NPCF C. A. Price File fNh O

h., **#

~~~~s. AA T

8302280196 830217 PDR ADOCK 05000395 D

PDR

HMr~.. James P. O'Reilly LER No.83-007 Page Two-Febru ary 17, 1983 DETAILED DESCRIPTION OF EVENT-

~

On January:24,:1983, withIthe Plant 'in Mode 1, t'he. NRC Resident Inspector identifiedLa discrepancy of 9% between the Main' Control, Board and Control Room Evacuation Panel (CREP) indication for Pressurizer Relief Tank Level. 'The' Channel. Check performed by the licensee, in compliar.ce with Technical Specification Surveillance

- Requirement 4.3.3.5, has an established maximum deviation of.4%

between toe redundant indicators. A Channel Check performed on January. 3,1983, indicated'that since the redundant channels were

. within the 4% allowable deviation, the out-of-tolerance condition 4

i occurred after that date.

The CREP indication (LI-470A) was declared inoperable at 1145 hours0.0133 days <br />0.318 hours <br />0.00189 weeks <br />4.356725e-4 months <br /> on January 24, 1983, in accordance with Action Statement (a) 7 of Technical Specification 3.3.3.5.,

PROBABLE CONSEQUENCES There were no adverse consequences from this event. The level

- indication was functional but drifted high during the period of time between January 3 through 24, 1983.

r CAUSE(S) 0F THE OCCURRENCE

- The cause of the occurrence is attributed to instrument drift.-

IMMEDIATE CORRECTIVE ACTIONS TAKEN

- A calibration was performed on the Main Control Board and CREP indication channels for Pressurizer Relief Tank Level.- Level l

transmitter LT-470A, which provides indication to' the CREP, was found to have a zero shif t of approximately 8% in the high 4

direction. The transmitter was calibrated and returned to operable' status on January 25,1983,.at 1630 hours0.0189 days <br />0.453 hours <br />0.0027 weeks <br />6.20215e-4 months <br />, upon the satisf actory completion of a' Channel Check performed with the appropriate surveillance test procedure.

1-

- I 1

1 i

i 1

,-,vy,~

.v,--.

,,,_.,,,,,, m

,_,,_,,,--_r,..m..-

,,.,.,..... _ _ _ _,., ~ _ _.

..__,.,-,..-.r%.

Mr. James P. O'Reilly LER No.83-007 Page Three February 17, 1983 ACTION TAKEN TO PREVENT RECURRENCE The licensee has initiated the following actions to prevent recurrence:

1.

Level transmitter LT-470A is scheduled for replacement during the next scheduled outage in March 1983. The exact time of the equipment replacement is dependent upon the receipt of the new transmitter from the vendor.

2.

The monthly Channel Check performed on Pressurizer Relief Tank Level will be accomplished on a weekly basis until the transmitter is replaced. A transmitter calibration will be performed if a deviation of 3% or greater is observed.