MONTHYEARML20217J3141999-10-15015 October 1999 Requests Emergency Publication of Document Entitled South Carolina Electric & Gas Co;Vc Summer Nuclear Station,Environ Assessment Transmitted on 991015 to Ofc of Fr for Publication ML20217J3281999-10-15015 October 1999 Forwards Copy of Environ Assessment & Finding of No Significant Impact Re Application for Exemption from Requiremets of 10CFR50,Section 50.60(a) for VC Summer Nuclear Station ML20217F8851999-10-0808 October 1999 Forwards Insp Rept 50-395/99-06 on 990801-0911.One Violation Occurred Being Treated as NCV RC-99-0192, Forwards Updated 1999 ECCS Evaluation Model Revs Rept for VC Summer Nuclear Station.Rept Is Being Submitted Pursuant to 10CFR50.46,which Requires Licensees to Notify NRC of Corrections to or Changes in ECCS Evaluation Models1999-09-28028 September 1999 Forwards Updated 1999 ECCS Evaluation Model Revs Rept for VC Summer Nuclear Station.Rept Is Being Submitted Pursuant to 10CFR50.46,which Requires Licensees to Notify NRC of Corrections to or Changes in ECCS Evaluation Models RC-99-0181, Forwards Anticipated Schedule for Operator Licensing Examinations.Sce&G Requests That NRC Prepare Examinations Stated on Attachment1999-09-21021 September 1999 Forwards Anticipated Schedule for Operator Licensing Examinations.Sce&G Requests That NRC Prepare Examinations Stated on Attachment ML20212C5091999-09-15015 September 1999 Forwards Anticipated Schedule for Operator Licensing Exams for Sce&G.Util Requests That NRC Prepare Exams on Encl RC-99-0184, Submits Seven Requests for Using Alternatives to Requirements of ASME Code,Section XI Re Subsection IWE & Iwl Insps to Be Performed at Vsns.Proposed Alternatives Will Provide Acceptable Level of Quality & Safety1999-09-15015 September 1999 Submits Seven Requests for Using Alternatives to Requirements of ASME Code,Section XI Re Subsection IWE & Iwl Insps to Be Performed at Vsns.Proposed Alternatives Will Provide Acceptable Level of Quality & Safety ML20212A8341999-09-0909 September 1999 Requests That Licensees Affected by Kaowool Fire Barriers Take Issue on Voluntary Initiative & Propose Approach for Resolving Subj Issues.Staff Plans to Meet with Licensees to Discuss Listed Topics ML20212A6951999-09-0909 September 1999 Requests That Licensees Affected by Kaowool Fire Barriers Take Issue on Voluntary Initiative & Propose Approach for Resolving Subj Issues.Staff Plans to Meet with Licensees to Discuss Listed Topics ML20211N4301999-09-0808 September 1999 Discusses Proposed Meeting to Discuss Kaowool Fire Barriers. Staff Requesting That Affected Licensees Take Issue on Voluntary Initative & Propose Approach for Resolving Issues ML20211Q8911999-09-0101 September 1999 Sumbits Summary of Training Managers Conference on Recent Changes to Operator Licensing Program.Meeting Covered Changes to Regulations,Exam Stds,New Insp Program & Other Training Issues.List of Attendees Encl RC-99-0177, Forwards Rev 2 to VC Summer Nuclear Station,Colr for Cycle 12, IAW Section 6.9.1.111999-08-31031 August 1999 Forwards Rev 2 to VC Summer Nuclear Station,Colr for Cycle 12, IAW Section 6.9.1.11 RC-99-0173, Requests That Info Listed in Rvid,Version 2,be Amended to Reflect Date for VC Summer Nuclear Station,As Marked in Encl to Ltr1999-08-31031 August 1999 Requests That Info Listed in Rvid,Version 2,be Amended to Reflect Date for VC Summer Nuclear Station,As Marked in Encl to Ltr ML20211L5181999-08-30030 August 1999 Forwards Insp Rept 50-395/99-05 on 990620-0731.One Violation Identified & Being Treated as non-cited Violation Consistent with App C of Enforcement Policy ML20211H2481999-08-25025 August 1999 Forwards Four Controlled Copies of Amend 43 to Physcial Security Plan. Summary of Plan Changes, Are Included as Part of Each Controlled Copy.Encls Withheld Per 10CFR73.21 05000395/LER-1999-004, Submits Suppl 1 to LER 99-004-00 Re Discovery of Several Fuel Assembly Top Nozzle Holdown Screws Which Had Failed. Root Cause Will Not Be Completed by 990829,as Committed.W Analysis Will Be Issued After Fall Outages Are Complet1999-08-24024 August 1999 Submits Suppl 1 to LER 99-004-00 Re Discovery of Several Fuel Assembly Top Nozzle Holdown Screws Which Had Failed. Root Cause Will Not Be Completed by 990829,as Committed.W Analysis Will Be Issued After Fall Outages Are Completed RC-99-0171, Notifies NRC of Intent Re Submittal of Application to Renew OL of Vcs.Preparatory Work Has Begun to Develop Application for License Renewal to Be Submitted After 020806 Contingent Upon Final Approval of Board of Directors1999-08-23023 August 1999 Notifies NRC of Intent Re Submittal of Application to Renew OL of Vcs.Preparatory Work Has Begun to Develop Application for License Renewal to Be Submitted After 020806 Contingent Upon Final Approval of Board of Directors RC-99-0152, Seeks Exemption Under 10CFR0.12a(2)ii from 10CFR50,App G Requirements to Establish pressure-temperature Limits Curves Using Methodology Presented in 1989 ASME Section Xi,App G1999-08-19019 August 1999 Seeks Exemption Under 10CFR0.12a(2)ii from 10CFR50,App G Requirements to Establish pressure-temperature Limits Curves Using Methodology Presented in 1989 ASME Section Xi,App G RC-99-0164, Forwards semi-annual Fitness for Duty Rept from 990101 to 990630 for VC Summer Nuclear Station,Iaw 10CFR26.71(d)1999-08-17017 August 1999 Forwards semi-annual Fitness for Duty Rept from 990101 to 990630 for VC Summer Nuclear Station,Iaw 10CFR26.71(d) ML20210Q4851999-08-0505 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006 at VC Summer.Requests Info Re Individuals Who Will Take Exam,Personnel Who Will Have Access to Exam.Sample Registration Ltr Encl ML20210R5501999-08-0505 August 1999 Ack Receipt of 990707 Response to NCVs Identified on 990607 Re Activities Conducted at VC Summer.Informs That After Consideration of Basis for Denial of NCV 50-395/99-03, Concluded,For Reasons Stated,That NCV Occurred RC-99-0156, Forwards Rev 1 to VC Summer Nuclear Station COLR for Cycle 12, IAW TS Section 6.9.1.11.Sections 2.1 & 3.0 Were Added to Include Beacon Tsm1999-08-0404 August 1999 Forwards Rev 1 to VC Summer Nuclear Station COLR for Cycle 12, IAW TS Section 6.9.1.11.Sections 2.1 & 3.0 Were Added to Include Beacon Tsm RC-99-0147, Submits Attached Request for Relief from Performing SG PORV Strike Time Testing to Acceptance Criteria of Asme/Ansi OMa-19881999-07-26026 July 1999 Submits Attached Request for Relief from Performing SG PORV Strike Time Testing to Acceptance Criteria of Asme/Ansi OMa-1988 ML20210B7451999-07-22022 July 1999 Informs That as Result of Staff Review of Licensee Responses to GL 92-01,rev 1 & Rev 1,suppl 1,staff Revised Info in Reactor Vessel Integrity Database & Releasing Database as Rvid Version 2 ML20210E3771999-07-16016 July 1999 Forwards Insp Rept 50-395/99-04 on 990509-0619.One Violation Being Treated as Noncited Violation RC-99-0127, Estimates Submittal of Eleven Licensing Actions in Fy 2000. Based on Statistical Estimates of Past Licensing Actions, Number of Licensing Actions in Fy 2001 Should Be Approx Ten, in Response to AL 99-021999-07-0707 July 1999 Estimates Submittal of Eleven Licensing Actions in Fy 2000. Based on Statistical Estimates of Past Licensing Actions, Number of Licensing Actions in Fy 2001 Should Be Approx Ten, in Response to AL 99-02 RC-99-0129, Provides Response to non-cited Violations Noted in Insp Rept 50-395/99-03.C/As:concluded That Cask Loading Pit Inaccessible & Duration of Dose Rates on Operating Floor of Fhb So Short That High Radiation Area Did Not Exist1999-07-0707 July 1999 Provides Response to non-cited Violations Noted in Insp Rept 50-395/99-03.C/As:concluded That Cask Loading Pit Inaccessible & Duration of Dose Rates on Operating Floor of Fhb So Short That High Radiation Area Did Not Exist RC-99-0131, Forwards Rev 9 to VC Summer Nuclear Station Safeguards Contingency Plan,Per 10CFR50.54(p).Encl Withheld1999-07-0707 July 1999 Forwards Rev 9 to VC Summer Nuclear Station Safeguards Contingency Plan,Per 10CFR50.54(p).Encl Withheld ML20210B7111999-07-0606 July 1999 Provides Summary of 990701 Meeting with Sce&G in Atlanta, Georgia Re Recent Virgil C Summer Refueling Outage & Other Items of Interest.List of Meeting Attendees & Licensee Presentation Handouts Encl RC-99-0114, Submits Response to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps, Under Oath or Affirmation1999-06-30030 June 1999 Submits Response to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps, Under Oath or Affirmation ML20195H5861999-06-0707 June 1999 Confirms 990604 Telcon Between J Proper & R Haag Re Meeting Scheduled for 990701 in Atlanta,Ga,To Discuss Plant Refueling Outage & Items of Interest ML20207H5241999-06-0707 June 1999 Forwards Insp Rept 50-395/99-03 on 990328-0508.Six Violations of NRC Requirements Occurred & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy ML20207D1881999-05-28028 May 1999 Informs That Effective 990524,K Cotton Assigned as Project Manager,Project Directorate II-1,for Virgil C Summer Nuclear Station 05000395/LER-1999-006, Forwards LER 99-006-00,describing Identified Safety Hazard with GE 7.2kV Magne-Blast Circuit Breakers.Event Is Being Reported Per 10CFR21.21a(1)1999-05-17017 May 1999 Forwards LER 99-006-00,describing Identified Safety Hazard with GE 7.2kV Magne-Blast Circuit Breakers.Event Is Being Reported Per 10CFR21.21a(1) RC-99-0104, Forwards Amend 17 to Training & Qualification Plan, Under Provisions of 10CFR50.54(p).Summary of Plan Changes Is Included as Part of Controlled Copy1999-05-13013 May 1999 Forwards Amend 17 to Training & Qualification Plan, Under Provisions of 10CFR50.54(p).Summary of Plan Changes Is Included as Part of Controlled Copy RC-99-0105, Forwards Copy of Sce&G Co 1998 Annual Financial Rept & Sc Public Service Authority 1998 Annual Financial Rept, for VC Summer Nuclear Station1999-05-13013 May 1999 Forwards Copy of Sce&G Co 1998 Annual Financial Rept & Sc Public Service Authority 1998 Annual Financial Rept, for VC Summer Nuclear Station 05000395/LER-1999-005, Forwards LER 99-005-00 for VC Summer Nuclear Station.Rept Describes Potential Condition for Exceeding Vsns Plant Design Basis Due to Submergence Qualification Issues for Certain ESF Components1999-05-12012 May 1999 Forwards LER 99-005-00 for VC Summer Nuclear Station.Rept Describes Potential Condition for Exceeding Vsns Plant Design Basis Due to Submergence Qualification Issues for Certain ESF Components ML20206L5121999-05-11011 May 1999 Informs That NRC Reorganized,Effective 990328.Reorganization Chart Encl ML20206P5771999-05-0707 May 1999 Informs That During 980519 Telcon Between T Matlosz & G Hopper,Arrangements Were Made for Administration of Licensing Exam at Virgil C Summer Nuclear Station During Wk of 990927 RC-99-0080, Submits Supplemental Info Re 970128 Response to NRC GL 96-06 Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions. Addl Analysis & Manpower Expenditure Involved Not Cost Effective1999-05-0606 May 1999 Submits Supplemental Info Re 970128 Response to NRC GL 96-06 Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions. Addl Analysis & Manpower Expenditure Involved Not Cost Effective RC-99-0097, Forwards Sce&G Cycle 12 COLR, IAW TS Section 6.9.1.111999-05-0606 May 1999 Forwards Sce&G Cycle 12 COLR, IAW TS Section 6.9.1.11 RC-99-0092, Informs That Util Has Reviewed Proposed Notice of Rulemaking & Fully Endorse Comments Prepared & Submitted on Behalf of Commercial Nuclear Power Industry by NEI1999-05-0303 May 1999 Informs That Util Has Reviewed Proposed Notice of Rulemaking & Fully Endorse Comments Prepared & Submitted on Behalf of Commercial Nuclear Power Industry by NEI RC-99-0090, Submits Special Rept (Spr 1999-003) Re Completion of ISI of SG Tubes,Indicating Number of Tubes Plugged or Repaired in Each Generator,Per TS 4.4.5.5.a & Section 4.4.5.5.b1999-04-29029 April 1999 Submits Special Rept (Spr 1999-003) Re Completion of ISI of SG Tubes,Indicating Number of Tubes Plugged or Repaired in Each Generator,Per TS 4.4.5.5.a & Section 4.4.5.5.b ML20206E1681999-04-29029 April 1999 Informs That FERC & NRC Will Conduct Category I Svc Water Pond (Swp) Dam Insp at Facility on 990610 ML20206P5021999-04-26026 April 1999 Forwards Insp Rept 50-395/99-02 on 990214-0327.One Violation of NRC Requirements Occurred & Being Treated as non-cited Violation,Consistent with App C of Enforcement Policy ML20205M0431999-04-13013 April 1999 Eighth Partial Response to FOIA Request for Records.App Q & R Records Encl & Being Made Available in PDR 05000395/LER-1999-002, Forwards LER 99-002-00 Re Condition for Exceeding Vsns Design Basis During Surveillance Testing Utilizing Certain ECCS Valves.Simplified Flow Diagram Included to Identify Configurations Discussed by Rept Encl1999-04-12012 April 1999 Forwards LER 99-002-00 Re Condition for Exceeding Vsns Design Basis During Surveillance Testing Utilizing Certain ECCS Valves.Simplified Flow Diagram Included to Identify Configurations Discussed by Rept Encl ML20205T2311999-04-0909 April 1999 Informs That on 990318,A Koon & Ho Christensen Confirmed Initial Operator Licensing Exam Scheduled for Y2K.Initial Exam Date Schedules for Wk of 000807 for Approx Eight Candidates ML20205G4181999-04-0101 April 1999 Advises That 970725 Application & Affidavit Which Submitted, WCAP-14932, Probabilistic & Economic Evaluation of Reactor Vessel Closure Head Penetration Integrity for Plant, Will Be Withheld from Public Disclosure,Per 10CFR2.790(a)(4) RC-99-0078, Submits Summary of Present Levels of Property Insurance & Cash Flow Statement for VC Summer Nuclear Station,Per 10CFR50.54(w)(3) & 10CFR140.21(e)1999-04-0101 April 1999 Submits Summary of Present Levels of Property Insurance & Cash Flow Statement for VC Summer Nuclear Station,Per 10CFR50.54(w)(3) & 10CFR140.21(e) 1999-09-09
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217J3141999-10-15015 October 1999 Requests Emergency Publication of Document Entitled South Carolina Electric & Gas Co;Vc Summer Nuclear Station,Environ Assessment Transmitted on 991015 to Ofc of Fr for Publication ML20217J3281999-10-15015 October 1999 Forwards Copy of Environ Assessment & Finding of No Significant Impact Re Application for Exemption from Requiremets of 10CFR50,Section 50.60(a) for VC Summer Nuclear Station ML20217F8851999-10-0808 October 1999 Forwards Insp Rept 50-395/99-06 on 990801-0911.One Violation Occurred Being Treated as NCV ML20212A6951999-09-0909 September 1999 Requests That Licensees Affected by Kaowool Fire Barriers Take Issue on Voluntary Initiative & Propose Approach for Resolving Subj Issues.Staff Plans to Meet with Licensees to Discuss Listed Topics ML20212A8341999-09-0909 September 1999 Requests That Licensees Affected by Kaowool Fire Barriers Take Issue on Voluntary Initiative & Propose Approach for Resolving Subj Issues.Staff Plans to Meet with Licensees to Discuss Listed Topics ML20211N4301999-09-0808 September 1999 Discusses Proposed Meeting to Discuss Kaowool Fire Barriers. Staff Requesting That Affected Licensees Take Issue on Voluntary Initative & Propose Approach for Resolving Issues ML20211Q8911999-09-0101 September 1999 Sumbits Summary of Training Managers Conference on Recent Changes to Operator Licensing Program.Meeting Covered Changes to Regulations,Exam Stds,New Insp Program & Other Training Issues.List of Attendees Encl ML20211L5181999-08-30030 August 1999 Forwards Insp Rept 50-395/99-05 on 990620-0731.One Violation Identified & Being Treated as non-cited Violation Consistent with App C of Enforcement Policy ML20210R5501999-08-0505 August 1999 Ack Receipt of 990707 Response to NCVs Identified on 990607 Re Activities Conducted at VC Summer.Informs That After Consideration of Basis for Denial of NCV 50-395/99-03, Concluded,For Reasons Stated,That NCV Occurred ML20210Q4851999-08-0505 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006 at VC Summer.Requests Info Re Individuals Who Will Take Exam,Personnel Who Will Have Access to Exam.Sample Registration Ltr Encl ML20210B7451999-07-22022 July 1999 Informs That as Result of Staff Review of Licensee Responses to GL 92-01,rev 1 & Rev 1,suppl 1,staff Revised Info in Reactor Vessel Integrity Database & Releasing Database as Rvid Version 2 ML20210E3771999-07-16016 July 1999 Forwards Insp Rept 50-395/99-04 on 990509-0619.One Violation Being Treated as Noncited Violation ML20210B7111999-07-0606 July 1999 Provides Summary of 990701 Meeting with Sce&G in Atlanta, Georgia Re Recent Virgil C Summer Refueling Outage & Other Items of Interest.List of Meeting Attendees & Licensee Presentation Handouts Encl ML20195H5861999-06-0707 June 1999 Confirms 990604 Telcon Between J Proper & R Haag Re Meeting Scheduled for 990701 in Atlanta,Ga,To Discuss Plant Refueling Outage & Items of Interest ML20207H5241999-06-0707 June 1999 Forwards Insp Rept 50-395/99-03 on 990328-0508.Six Violations of NRC Requirements Occurred & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy ML20207D1881999-05-28028 May 1999 Informs That Effective 990524,K Cotton Assigned as Project Manager,Project Directorate II-1,for Virgil C Summer Nuclear Station ML20206L5121999-05-11011 May 1999 Informs That NRC Reorganized,Effective 990328.Reorganization Chart Encl ML20206P5771999-05-0707 May 1999 Informs That During 980519 Telcon Between T Matlosz & G Hopper,Arrangements Were Made for Administration of Licensing Exam at Virgil C Summer Nuclear Station During Wk of 990927 ML20206E1681999-04-29029 April 1999 Informs That FERC & NRC Will Conduct Category I Svc Water Pond (Swp) Dam Insp at Facility on 990610 ML20206P5021999-04-26026 April 1999 Forwards Insp Rept 50-395/99-02 on 990214-0327.One Violation of NRC Requirements Occurred & Being Treated as non-cited Violation,Consistent with App C of Enforcement Policy ML20205M0431999-04-13013 April 1999 Eighth Partial Response to FOIA Request for Records.App Q & R Records Encl & Being Made Available in PDR ML20205T2311999-04-0909 April 1999 Informs That on 990318,A Koon & Ho Christensen Confirmed Initial Operator Licensing Exam Scheduled for Y2K.Initial Exam Date Schedules for Wk of 000807 for Approx Eight Candidates ML20205G4181999-04-0101 April 1999 Advises That 970725 Application & Affidavit Which Submitted, WCAP-14932, Probabilistic & Economic Evaluation of Reactor Vessel Closure Head Penetration Integrity for Plant, Will Be Withheld from Public Disclosure,Per 10CFR2.790(a)(4) ML20196K9771999-03-25025 March 1999 Refers to Open Meeting Conducted at Licensee Request at NRC Region II Offices in Atlanta,Ga on 990315 Re Upcoming April 1999 Refueling Outage,Back Leakage Into Residual Heat Removal Sys & Licensee Position on Hazard Barriers ML20205D7981999-03-23023 March 1999 Advises of NRC Planned Insp Effort Resulting from Summer Plant Performance Review for Period July 1998 Through Jan 1999.Historical Listing of Plant Issues & Details of NRC Insp Plan for Next Eight Months Encl ML20204J7201999-03-15015 March 1999 Forwards Insp Rept 50-395/99-01 on 990103-0213.No Violations Noted.Sce&G Conduct of Activities During Insp Period Generally Characterized by Safety Conscious Operations & Conservative Decision Making ML20207J0661999-03-0303 March 1999 Confirms 990226 Telephone Conversation Between a Rice & M Widman Re Meeting Scheduled for 990315.Purpose of Meeting Will Be to Discuss VC Summer Upcoming Refueling Outage & Items of Interest ML20203F4351999-02-12012 February 1999 Forwards SER Finding Licensee Adequately Addressed GL 96-05 Requested Actions & Have Acceptable Program to Periodically Verify safety-related MOV design-basis Capability at Virgil C Summer Nuclear Station ML20203G5751999-02-0505 February 1999 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licensing Exam on 990407. Representative of Facility Must Submit Ltr Indicating No Candidates or Ltr Listing Names of Candidates for Exam ML20203G4091999-02-0101 February 1999 Forwards Insp Rept 50-395/98-10 on 981122-990102.No Violations Noted.Licensee Conduct of Activities at VC Summer Facility Was Generally Characterized by Safety Conscious Operations & Conservative Decision Making ML20199J0571999-01-21021 January 1999 Forwards RAI Re 980918 Request for Amend to Plant Ts.Amend Would Incorporate New Best Estimate Analyze for Core Operations Core Power Distribution Monitoring & Support Sys Into Ts.Response Requested within 15 Days of Receipt of Ltr ML20199K0281999-01-13013 January 1999 Discusses NRC Organization Charts to Be Implemented by Region 2 on 990117.Forwards Organization Charts for Info ML20198Q7471999-01-0505 January 1999 Informs That 981204 Request to Extend RAI Response Period Re GL 97-01 to 990115 Has Been Accepted ML20199E5971998-12-23023 December 1998 Provides Summary of Training Manager Conference Conducted on 981105.Forwards Agenda,List of Attendees,Handouts & Preliminary Schedule for FY99 & FY00.Goal of Providing Open Forum of Operator Licensing Issues Met ML20198N8341998-12-21021 December 1998 Forwards Insp Rept 50-395/98-09 on 981011-1121 & NOV Re Failure to Follow Procedures During Snubber Testing ML20198F4181998-12-18018 December 1998 Forwards SER Granting Licensee 980513 Request for Approval to Temporarily Repair ASME Code Class 3 Piping at VC Summer Nuclear Station Pursuant to 10CFR50.55a(g)(6)(i) ML20198B7611998-12-0303 December 1998 Informs That on 981007,generic Fundamentals Exam Was Administered to 148 Candidates at 21 Facilities.Summary of Statistical Results of Exam Listed.Contents of Exam Along with Associated Input Data Needed for Updating Catalog Encl ML20196G0981998-12-0303 December 1998 Requests Proposed Alternatives to Confirm That Listed Structures Free from Gross Erosion or Other Effects That Could Impair Structures Stability,Per NRC Category I SW Pond Dam Insp ML20198A7711998-12-0202 December 1998 Advises of Planned Insp Effort Resulting from 981102 Insp Planning Meeting.Details of Insp Plan for Next 4 Months & Historical Listing of Plant Issues,Called Plant Issues Matrix Encl ML20196D5831998-11-12012 November 1998 Informs That on 981007,NRC Administered Gfes of Written Operator Licensing Examination.Copies of Both Forms of Exam Including Answer Keys,Grading Results for Facility & Copies of Indivividual Answer Sheets Encl.Without Encl ML20195E9761998-11-0909 November 1998 Forwards Insp Rept 50-395/98-08 on 980906-1010.No Violations Noted.Conduct of Activities at VC Summer Facility Was Generally Characterized by Safety Conscious Operations & Conservative Decision Making ML20155G4451998-11-0404 November 1998 Forwards Safety Evaluation Re Relief Request to ASME Code Case N-416-1,for Class 1,2 & 3 Piping & Components.Proposed Alternative with Addl Exams Proposed,In Lieu of Performing Sys Hydrostatic Test Provides Acceptable Level of Safety ML20154Q9451998-10-21021 October 1998 Forwards SE Re Approval to Use ASME Code Case N-498-1 for Periodic Hydrostatic Testing of ASME Class 3 Piping at Plant ML20155B8071998-10-0909 October 1998 Extends Invitation to Attend Training Managers Conference on 981105 in Atlanta,Georgia.Conference Designed to Inform Regional Training & Operations Mgt of Issues & Policies That Affect Licensing of Reactor Plant Operators ML20155B1561998-10-0505 October 1998 Forwards Insp Repts 50-395/98-07 on 980726-0905.No Violations Noted ML20239A3671998-09-24024 September 1998 Forwards Insp Rept 50-395/98-06 on 980628-0725.No Violations Noted.During Insp Period,Nrc Received Response to NOV 50-395/98002-01.Response Meets Requirements of 10CFR2.201 ML20151V1911998-09-0808 September 1998 Forwards Request for Addl Info Re GL 97-01, Degradation of Control Rod Drive Mechanism Nozzle & Other Vessel Closure Head Penetrations. Response Requested within 90 Days of Date of Ltr ML20153F0261998-09-0202 September 1998 Refers to Insp Rept 50-395/98-06 Issued on 980824.Ltr Transmitting Insp Rept Referred to Wrong Violation Number in Paragraph Three.Corrected Page with Violation Number 50-395/98004-01 Encl ML20151T9241998-08-27027 August 1998 Informs of Change Being Implemented by Region II Re Administrative Processing of Licensee Responses to Novs. Licensee NOV Responses Which Accept Violations & Require No Addl Communication to Be Ack in Cover Ltr of Next Insp Rept ML20239A4521998-08-26026 August 1998 Forwards SALP Insp Rept 50-395/98-99 for Period of 961027- 980725 1999-09-09
[Table view] |
Text
July 6,1999 i
South Carolina Electric & Gas Company ATTN: Mr. Gary J. Taylor Vice President, Nuclear Operations Virgil C. Summer Nuclear Station P. O. Box 88 Jenkinsville, SC 29065
SUBJECT:
VIRGIL C. SUMMER NUCLEAR STATION REFUELING OUTAGE REVIEW MEETING
Dear Mr. Taylor:
This refers to the meeting conducted at your request at this office in Atlanta, Georgia on July 1,1999. The purpose of the meeting was to discuss the recent Virgil C. Summer refueling l outage and other items of interest. A list of attendees and presentation handouts are enclosed.
l At the meeting, South Carolina Electric & Gas (SCE&G) personnel presented an informational overview of activities conducted during Refueling Outage 11. SCE&G also discussed the evaluation and corrective actions for issues associated with Magne-Blast breakers and fuel assembly top nozzle failures.
l l In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title 10 Code of ,
! Federal Regulations, a copy of this letter and its enclosures will be placed in the NRC Public l l Document Room. j l
l Should you have any questions concerning this meeting, please contact me at (404) 562-4500.
]
Sincerely, !
Orig signed by Robert C. Haag Robert C. Haag, Chief j Reactor Projects Branch 5 !
Division of Reactor Projects
]
Docket No. 50-395 License No. NPF-12 l
Enclosures:
- 1. List of Meeting Attendees l
- 2. Licensee Presentation Handouts
\
cc w/encts: Continued see page 2 l 9907230207 990706 0FFICIAL C0PY DR ADOCK 0 g5
. 9 +s
SCE&G 2
' cc w/encls:
R. J. White Nuclear Coordinator Mail Code 802 S.C. Public Service Authority Virgil C. Summer Nuclear Station P. O. Box 88 -
Jenkinsville, SC 20065 1
J. B. Knotts, Jr., Esq.
Winston and Strawn 1400 L Street, NW Washington, D. C. 20005-3502 Chairman l Fairfield County Council P. O. Box 60 Winnsboro, SC 29180 Virgil R. Autry, Director Radioactive Waste Management Bureau of Solid and Hazardous Waste Management I S. C. Department of Health :
and Environmental Control 2600 Bull Street Columbia, SC 29201 1
R. M. Fowlkes, Manager Operations (Mail Code 303)
South Carolina Electric & Gas Company Virgil C. Summer Nuclear Station P. O. Box 88 Jenkinsville, SC 20065 April Rice, Manager
' Nuclear Licensing & Operating Experience (Mail Code 830) -
Virgil C. Summer Nuclear Station P. O. Box 88 -
Jenkinsville, SC 20065
=
I~ SCE&G 3 .
l Distribution w/ encl:
L. Plisco, Ril K. Cotton, NRR R. Alello, Ril .
P. Fillion, Ril -
l R. Gibbs, Ril L. Hayes, Rll G. Kuzo, Ril PUBLIC NRC Resident inspector U.S. Nuclear Regulatory Commission Route 1, Box 64 Jenkinsville,'SC 29065 OFFICE p.,Ii '. O g p slGNATURE g ,
NAME 'KCoyne /
DATE 7/ Z. /99 7/ /99 7/ /99 7/ /99 7/ /99 7/ /99 7/ /99 COPY? N S) NO YES NO YES w3 YES NO YES NO YES NO YES NO OFFICIAL RECORD COPY DOCUMENT NAME: G:\ summer mtg_0799.wpd 1
l i
LIST OF MEETING ATTENDEES Topic VIRGIL C. SUMMER NUCLEAR STATION REFUELING OUTAGE REVIEW Location: US Nuclear Regulatory Commission, Region 11 Office, Atlanta, Georgia Qgitt July 1,1999 NBC Luis Reyes Regional Administrator Loren Plisco Director, Division of Reactor Projects Bruce Mallett Director, Division of Reactor Safety Robert Haag Chief, Reactor Projects Branch 5 Kerry Landis Chief, Reactor Safety Engineering Branch Kevin Coyne Project Engineer Mark King Resident inspector Paul Fillion Reactor inspector South Carolina Electric 8, Gas Steve Byrne Plant Manager Alan Torres Outage Manager Jim Proper Supervisor, Nuclear Licensing and Operating Experience Sam Skidmore Engineer, Plant Support Engineering Richard Slone Engineer, Plant Support Engineering Enclosure 1
e Y
' dG
% n(Ila
_ ina IIn trh tfas Participants
\ Rs R, xmn 11 l'irsc%' + Steve Ilyrne Plant Manager
.: p ,
j + Alan Torres OutageManager
+ Richard Slone PSE Engineer
. . [. ,
'G l '. F + Sam Skidmore PSE Engineer M -
v- + Jim Proper Supervisor, NL&OE lulu I.
j' . _ ' *
"=au m aa Agenda
+ Introduction and Overview
+ RecuelingOutage1, Refueling Outage 11
+ Magne-Illast llreakers
+ Fuel Assembly Top Nozzle issue Alan Torres
+ ClosingComments Outage Manager v .. a ..
Outline Outage Summary No Safety Significant Goal Met
+ RF-11 Goals Events No Lost Time 1LTA
+ 0utage Compan. son gec;a,ni,
+ Outage Success Outage Dose less than Actual Dose 115 Mr a Run zwi .un piume-y
+ Outage Challenges Planned Duration less Actual Duration 38
+ Major Activities Completed than 30 days days,10.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />
'~'~ ~"""'" " *"'
+ Summa 7 Budget Met Budget Goal Lowed in plant heetary Enclosure 2
m .- n ..
V. C. Summer Outage History scn ona, .
--~~
- 12. . ,,. 6 .
,,, - 97 D 80 5 I73 l,l,iIS ,,
~~
4.i .. , , , ,
19841985198719881990 lbd119931994199619971999
'il . l.i.k..h.
Odues S AG T.seu Outage Summary Outage Summary
+ 0utage Successes + 0utage Successes
- Use of Administrative Group for Safety, - Response to Challenges Fire Watche~ Confine Space, and FME - Control of Dose and Use of ALARA Plan Watches . RIIR single Train Cool Down
- Use of Training Staffs in Shop and + Use of Iq uipment I otators,151, snubbers Specific Project Tasks + Res Drain Down Plan
- Use of Other Graups Such as Licensing, - Outage Work Scope Control Chemistry, llR, E P, CDSV to Supplement Craft and ilP Activities
- cs . - cr a REFllEL OUTAGE TOTAL ACTIVITIES IDENTIFIED wg"m" ca"" -- Outage Summary MS + 0utage Successes
- Cor 4 ml of RCS Crud Burst sono ' /j e Chemistry Controls Change RCS pH 4000 < -
e**e--*~~
Hold Hydrogen Concentration Higher Longer for Increased $olubility se Followed FPRI Guidelinee 3000 Pump oper.:ssn Following Hydrogen Peroside Add 0, , , , , , , , , , , , , , , , ,
asuntiemuswnacuinas etant l- - RF.7 -+- RF-8 --.- RF RF -- RF 11 l
m ua D.
, -. _ . _ . Outage Summary
+ Major Issues and Emergent Work
=-- - -
- TuelTransfer System Modifications-60 hrs
... . . . _ delay
- Fuel Top Nonle issues - 68 hrs delays
. . - 7,2 kV Breaker Issue - 18 hrs delay
)
_________ a A
l l
l m .. m .. :
Outage Summary Outage Summary
+MajorWork Activities + Modifications Completed
- 40". Eddy Current of 2 S/C'S - IIP Rotor Replacement
- 'A' RC1' Seal Replacement and Motor Swap - 10th Stage Extraction Check Valve
- Replacement of both 1E Batteries Replacement
. Inspection and Testing of 116 Snubbers - Removal of S/C Snubbers
- 49 LLRTs and 29 Movats Tests '
- A' D/G lleat Exchanger Replacement
- 154 ISI Examinations and 39 Erosion - FuelTransfer System
/ Corrosion Inspections m i. m_
Outage Summary Outage Summary
+ Modifications Completed + Challenges for the Future
- Amertap Upgrade
- Control Cost Through Increased Use of
- Cate Valve Pressure Locking Plant Staff and CDSV
- MSR Digital Controls Contractor Resources
- Main Transformer SupplementalCooling - Continue to Improve Schedule Review System Process
- Continue Improvements Such as llP ALARA Plan, Drain Down Plan
t m &a m .a Outage Summary Magne-Blast
+ Our Measuring Stick of Success Brggkgrs
. Safety Conscience Primary Focus
- No Nuclear Safety Fvents
. Conservative Decision Making Richard Slone
. l uel Top Nonte luue PSE Engineer
.7.2 kV Hreaker laue
- ALARA Awareness M aa G ka Overview VCS Medium Voltage
+ Ureakers recently overhauled by GE BregkgrS
+" Tripped free" on close attempt
+ Ceneral Electric Magne-Blast
+ Cotter pin not properly bent
+ Air Circuit Breakers
+ Latch check switch bracket hit by pin
+ Bracket interfered with switch paddle
+ ertical Wt on trip shaft +7.2kV
+ 500 MVA mha M ka Q ChargingPump Breaker m#
3
~ ~ "
2 j
+ Overhauled in May/ June '98
+ Site Tested and Installed June '98
+ Failed to close February'99
+ Various factory attempts to fix failed
+ Back to Atlanta Service Shop 0
~
n .
c.. g ,,,
1 a .. m ..
Second BreakerFailure Second BreakerFailure
+ Post overhaul testing April 99 + Root cause of interference not clear
+ Same failure to close symptom + liigh speed photography
+ Latch Check Switch paddle + Cotter pin observed striking back of interference found latch check switch plate Re-inspection of1st Root Cause Breaker
+ Cotter pin on trip shaft not bent fully
+ Gap was also changing
+ Tab strikes back of switch, .
+ Cotter p.in also not properly bent moving it forward I
+ Ding marks where pin tabs hit
+ Closes required gap between bracket switch plate and trip shaft paddle j l
v m ..
Root Cause (cont.) Root Cause (cont.)
1
+ Result of no gap: + Breakers operated properly every
- Switch bracket bounces against paddle time with:
when attempting to close
- Paddle removed
- Paddle movement rotates trip shaf t
- Switch bracket removed
- Trip latch bounces off trip latch roller when breaker attempts to close
- Breaker" trips free" l
i
. a .
l
= .. v ..
CorrectiveActions CorrectiveActions j
+ Latch Check Switches, brackets,
+ Electrical Maintenance procedures and paddles removed from VCS revised to re-verify switch breakers removal
- In-service as well as spare breakers i
. Nss no voit substauen fe,ans remain + Procurement documents / databases !
- LCS function not required for VCs will be revised to address LCS I desig" I
+ Part 21 notification sent to NRC
. Removes an unneccesary component from by VCS on 5-5-99 closing circuit - increased reliability
- 2. c a.
Summary
+ All NSR breakers reworked to a safer, more reliable condition Fuel Assembly Top
+ In-depth root cause NozzleIssue
+ Conservative decision making Sam Skidmore
- protected both trains PSE Engineer
+ Shared industry experience v .a m ..
Outline Problem Discovery
+ Problem Discovery + Simultaneously,on Offload Steps !
. 23 A and 24 (4-13-99/2309):
+ Actions (Core Offload) - Difficulty Latching in Fuel Handling
+ Actions (Core Load) stag.
+ Safety Assessment - ["j"" I" "'"i " I" "' '
+ Vendor Root Cause - Visual Inspection in RB
+ Summay . One or More Gripper f ingers Disengaged
. Non-essential Personnel I cave RB e Recovery Ifforts Begin
. Suspend Attempts to Latth f uelin lilB l
I i
l l
l l
Gu Ga Problem Discovery Problem Discovery
+ Springs field Dowa With inc-600
+ Fuel Recovery: Screws
- Consult Manipulator Vendor Rep + Clamp (cover) Atta:hed by Separate
- Consult Additional Refueling Contractor Screw and Single 7 ack Weld resources
- Develop" Troubleshooting" Plan 5
- Plant Safety Review Comrnittee Approval .h
- Implement Plan. Fuel Safe (4-14-99/0810) l i
% ka %u Problem Discovery Actions: Core Offload 1
< j C:I / + Notifications:
m_ h:.
- NRC Resident (On site during discovery) 4*t .' - Other Affected Utilities
"*"""C*""*"
,,,: - Fuel Vendor 7)'i g - Refueling Services Vendor
- Manipulator Crane Vendor
- INPO Network ann ==w conman
- LER
- a. m ..
Actions: Core Offload Actions: Core Offload
+ Spent Fuelllandling Tool
+ Manipulator Crane
- Remove Reference and Dummy Pins
- Verify Proper engagement function
- Visually Verify Latching (UW Camera)
. Adjunt regage t.imit switih eettins
. Wrify Cam Travel Vendor Video lnspection
. Test with Dummy Assembly 4 Crew Briefing
- Visually Verify Engagement (UW camera)
+ Resume Offload 4-16-99/0351 Tau M .a Actions: Core Offload Actions: Core Load
+ Step 65 Partial Engagement + Replace Top Nozzle on 28
+ VisualInspection Results Assemblies
- Problem Limited to Region M (" Mikes") - Standard Vendor Tooling, N cts and
+ 35" Mikes" out. 29 Remaining Procedurn
+ Lower Slack Cable Setting + Verify No Loose Parts
+ Brief Crew + Verify No Damage to 'S' Ifoles
+ Offload Complete 4-18-99/0722
- m. w Actions: Core Load SafetyAssessment
+ All Parts Remain on Top Nozzle
+ Replace Manipulator Crane Gripper Assembly + Assembly Remains Engaged in ,
Alignment Pins
+ Restore SFliT Pins
+ RCCA Movement Unaffected
+ Core Load Uneventful
+ Accident Conditions Acceptable i
L
r l
c .
l m .. s.
VendorRoot Cause Summary
+ Ongoing: + Deliberateand Conservative
- Data conection Decision Making for Safe Offload
- Material.Investigati "
+ Thorough Assessment and
- ManufacturingInvestigation Reconstitution Effort to Ensure Safety of Cycle 12 Core
+ Notifications to Industry m.
I ClosingComments Steve Byrne ;