ML20206P577

From kanterella
Jump to navigation Jump to search
Informs That During 980519 Telcon Between T Matlosz & G Hopper,Arrangements Were Made for Administration of Licensing Exam at Virgil C Summer Nuclear Station During Wk of 990927
ML20206P577
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 05/07/1999
From: Christensen H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Gabe Taylor
SOUTH CAROLINA ELECTRIC & GAS CO.
References
NUDOCS 9905180260
Download: ML20206P577 (4)


Text

-

i May 7, 1999 I

South Carolina Electric & Gas Company ATTN: Mr. Gary J. Taylor Vice President, Nuclear Operations Virgil C. Summer Nuclear Station P. O. Box 88 Jenkinsville, SC 29065

SUBJECT:

REACTOR OPERATOR INITIAL EXAMINATION AT VIRGIL C. SUMMER NUCLEAR STATION

Dear Mr. Taylor:

In a telephone conversation on May 3,1999 between Mr. Terry Matlosz, Training Manager and l Mr. George Hopper, Senior License Examiner, arrangements were made for the administration of licensing examinations at Virgil C. Summer Nuclear Station during the week of September 27,1999.

The NRC will prepare the examinations based on the guidelines in Revision 8 of NUREG-1021,

" Operator Licensing Examination Standards for Power Reactors". Your staff will be given the opportunity to review the examinations during the week of September 13,1999.

To meet the above schedule, it will be necessary for your staff to furnish the reference materials identified in Attachment 2 of ES-201 by June 13,1999. Any delay in receiving the required reference materials, or the submittal of inadequate or incomplete materials, may cause the examination to be rescheduled.

In order to conduct the requested written' examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and

. to make the simulation facility available during the weeks of September 13,1999 and September 27,1999, in accordance with ES-302, your staff should retain the original simulato performance data (e.g., system pressures, temperatures, and levels) generated during the to

. dynamic operating tests until the examination results are final.

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in i effect while the written examinations and operating tests are being administered.  !

To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests

' (if any)(OMB approval number 3150-0090) at least 30 days before the first examination date. If j the applications are not received at least 30 days before the examination date, a postponement  !

may be necessary. Signed applications certifying that all training has been completed should I be submitted at least 14 days before the first examination date

.L 80OdC 9905180260 990507 r 2 PDR ADOCK 05000395 x Y PDR g i ]

SCE&G 2 This letter contains information collections that are subject to the Paperwork Reduction Act of ,

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of  !

Management and Budget, approval number 3150-0101, which expires on September 30,2000.

The public reporting burden for this collection of information is estimated to average ((50)) hours per response, including the time for reviewing instructions, gathering and maintaining the data  ;

needed, and completing and reviewing the collection of information. Send comments on any  ;

aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at BJS1 @NRC. GOV; and to the l Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of Management and Budget, Washington, DC 20503.

l The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

Thank you for your cooperation in this matter. Mr. Terry Matlosz has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. George Hopper at 404 562-4645, or myself at 404 562-4638.

Sincerely, (Original signed by H. O. Christensen)

Harold O. Christensen, Chief Operator Licensing and Human Performance Branch Division of Reactor Safety Docket No. 50-395 License No. NPF-12 cc: R. J. White Nuclear Coordinator Mail Code 802 S.C. Public Service Authority Virgil C. Summer Nuclear Station P. O. Box 88 Jenkinsville, SC 29065

_ J. B. Knotts, Jr., Esq.

Winston and Strawn 1400 L Street, NW Washington, D. C. 20005-3502 cc cont'd: (See page 3)

I L

i. .

L )

SCE&G 3 i

cc cont'd: j Chairman l

l- Fairfield County Council

{

P. O. Box 60 Winnsboro, SC 29180 l

Virgil R. Autry, Director l Radioactive Waste Management l Bureau of Solid and Hazardous l Waste Management i S. C. Department of Health and Environmental Control 2600 Bull Street Colurr.bia, SC 29201 R. M. Fowlkes, Manager Operations (Mail Code 303)

. South Carolina Electric & Gas Company Virgil C. Summer Nuclear Station P. O. Box 88 Jenkinsville, SC 29065 April Rice, Manager Nuclear Licensing & Operating Experience (Mail Code 830)

Virgil C. Summer Nuclear Station i P. O. Box 88  ;

Jenkinsville, SC 29065 1 Terry Matlosz Training Manager Virgil C. Summer Nuclear Station P. O. Box 88 (Mail Code P-40)

Jenkinsville, SC 29065 Distribution: (See page 3) 4

SCE&G 4 Distribution:

L. Plisco, Ril M. Padovan, NRR R. Haag, Ril l R. Aiello, Ril D. Jones,Ril PUBLIC  ;

1 NRC Resident inspector U.S. Nuclear Regulatory Commission Route 1, Box 64 Jenk!nsville, SC 29065 l

l i

l i

l l

i l

l I

1 OFFICE Ril:DRS Ril.DRS All:DRP  !

a SIGNATURE K69[/ gg NAME M'Sykes 7 dWodim BHaag M DATE A /99 5/d /99 5/5 % 5/ /99 5/ /99 5/ /99 5/ /99 COPY? ['fES l NO DES) NO YES tf40) YES NO YES NO YES NO YES NO OMUIN. RECORD COPY DOCUMENT NAM: G:\LA\ SUM \120 DAY.WPD