05000395/LER-1983-010, Forwards LER 83-010/03L-0.Detailed Event Analysis Encl

From kanterella
Jump to navigation Jump to search
Forwards LER 83-010/03L-0.Detailed Event Analysis Encl
ML20071E737
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 03/04/1983
From: Dixon O
SOUTH CAROLINA ELECTRIC & GAS CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20071E740 List:
References
NUDOCS 8303150341
Download: ML20071E737 (2)


LER-2083-010, Forwards LER 83-010/03L-0.Detailed Event Analysis Encl
Event date:
Report date:
3952083010R00 - NRC Website

text

..

SOUTH CAROLINA ELECTRIC & GAS COgNg,.

,OST OFFICE 764 , , , , , . . .

CotuustA. south CAROLINA 29218 O. W. DixoN. Jn.

Wce P.aseotNT March 4, 1983 k I'gM 0

' *' ' l0 nuca . o....nO~.

Mr. J. P. O'Reilly, Director U. S. Nuclear Regulatory Commission Region II, Suite 3100 101 Marietta Street, N.W.

Atlanta, GA 30303

Subject:

Virgil C. Summer Nuclear Station Docket No. 50/395 Operating License No. NPF-12 Thirty Day Written Report LER 83-010

Dear Mr. O'Reilly:

Please find attached Licensee Event Report #83-010 for Virgil C.

Summer Nuclear Station. This Thirty Day Report is required by Technical Specification 6.9.1.13.(c) as a result of not satisfy-ing the surveillance requirements of Technical Specification 4.4.8, " Reactor Coolant System, Specific Activity," on February 6, 1983.

Should there be any questions, please call us at your convenience.

Very truly yours, fJ l' i O. W. D' on, J,r' HCF:OWD/dwf/fjc

Attachment:

cc: V. C. Summer A. R. Koon T. C. Nichols, Jr. G. D. Moffatt E. C. Roberts Site QA O. W. Dixon, Jr. C. L. Ligon (NSRC0 H. N. Cyrus G. J. Braddick H. T. Babb J. L. Skolds D. A. Nauman J. B. Knotts, Jr.

M. B. Whitaker, Jr. I&E (Washington)

W. A. Williams, Jr. Document Management Branch O. S. Bradham INPO Records Center R. B. Clary NPCF C. A. Price File J. C. Miller F303150341 830304 PDR ADOCK 05000395

,gppuSfd,00?I.4 '

PDR ",-

S g -- Aad

Mr. J. P. O'Reilly LER No.83-010 March 4, 1983 Page #2 DETAILED DESCRIPTION OF EVENT On February 6, 1983, while in Mode 1, the Plant underwent a power transient from 50% to 30% thermal power between the hours of 0330 and 0440. Between the hours of 0730 and 0835 on the same day, the Plant went from 30% to approximately 5%

thermal power. Per Technical Specification 4.4.8, Table 4.4-4(4b), and Isotopic Iodine Analysis is required to be performed between two (2) and six (6) hours following a thermal power change exeeding 15% of the the rated thermal power. This surveillance was not performed as required within the Technical Specification time limit.

PROBABLE CONSEQUENCES An Isotopic Iodine Analysis was performed at 1111 hours0.0129 days <br />0.309 hours <br />0.00184 weeks <br />4.227355e-4 months <br /> on February 6, 1983. The results were acceptable. Therefore, no adverse consequences resulted from the event.

CAUSE(S) OF THE OCCURRENCE Personnel involved interpreted both of the power changes as one (1) event. Therefore, an analysis was only performed at the conclusion of power reduction.

IMMEDIATE CORRECTIVE ACTIONS TAKEN An Isotopic Iodine Analysis was performed at 1111 hours0.0129 days <br />0.309 hours <br />0.00184 weeks <br />4.227355e-4 months <br /> with satisfactory results.

ACTION TAKEN TO PREVENT RECURRENCE The event was discussed with Chemistry supervisors and technicians. A Chemistry Lab policy has been issued on this subject to preclude further occurrence of this nature.