RC-99-0192, Forwards Updated 1999 ECCS Evaluation Model Revs Rept for VC Summer Nuclear Station.Rept Is Being Submitted Pursuant to 10CFR50.46,which Requires Licensees to Notify NRC of Corrections to or Changes in ECCS Evaluation Models28 September 1999Forwards Updated 1999 ECCS Evaluation Model Revs Rept for VC Summer Nuclear Station.Rept Is Being Submitted Pursuant to 10CFR50.46,which Requires Licensees to Notify NRC of Corrections to or Changes in ECCS Evaluation Models
RC-99-0181, Forwards Anticipated Schedule for Operator Licensing Examinations.Sce&G Requests That NRC Prepare Examinations Stated on Attachment21 September 1999Forwards Anticipated Schedule for Operator Licensing Examinations.Sce&G Requests That NRC Prepare Examinations Stated on AttachmentGeneric Fundamentals Examination
ML20212C50915 September 1999Forwards Anticipated Schedule for Operator Licensing Exams for Sce&G.Util Requests That NRC Prepare Exams on EnclGeneric Fundamentals Examination
RC-99-0184, Submits Seven Requests for Using Alternatives to Requirements of ASME Code,Section XI Re Subsection IWE & Iwl Insps to Be Performed at Vsns.Proposed Alternatives Will Provide Acceptable Level of Quality & Safety15 September 1999Submits Seven Requests for Using Alternatives to Requirements of ASME Code,Section XI Re Subsection IWE & Iwl Insps to Be Performed at Vsns.Proposed Alternatives Will Provide Acceptable Level of Quality & SafetyCoatings
Nondestructive Examination
VT-2
Moisture barrier
RC-99-0177, Forwards Rev 2 to VC Summer Nuclear Station,Colr for Cycle 12, IAW Section 6.9.1.1131 August 1999Forwards Rev 2 to VC Summer Nuclear Station,Colr for Cycle 12, IAW Section 6.9.1.11
RC-99-0173, Requests That Info Listed in Rvid,Version 2,be Amended to Reflect Date for VC Summer Nuclear Station,As Marked in Encl to Ltr31 August 1999Requests That Info Listed in Rvid,Version 2,be Amended to Reflect Date for VC Summer Nuclear Station,As Marked in Encl to Ltr
ML20211H24825 August 1999Forwards Four Controlled Copies of Amend 43 to Physcial Security Plan. Summary of Plan Changes, Are Included as Part of Each Controlled Copy.Encls Withheld Per 10CFR73.21
05000395/LER-1999-004, Submits Suppl 1 to LER 99-004-00 Re Discovery of Several Fuel Assembly Top Nozzle Holdown Screws Which Had Failed. Root Cause Will Not Be Completed by 990829,as Committed.W Analysis Will Be Issued After Fall Outages Are Complet24 August 1999Submits Suppl 1 to LER 99-004-00 Re Discovery of Several Fuel Assembly Top Nozzle Holdown Screws Which Had Failed. Root Cause Will Not Be Completed by 990829,as Committed.W Analysis Will Be Issued After Fall Outages Are Completed
RC-99-0171, Notifies NRC of Intent Re Submittal of Application to Renew OL of Vcs.Preparatory Work Has Begun to Develop Application for License Renewal to Be Submitted After 020806 Contingent Upon Final Approval of Board of Directors23 August 1999Notifies NRC of Intent Re Submittal of Application to Renew OL of Vcs.Preparatory Work Has Begun to Develop Application for License Renewal to Be Submitted After 020806 Contingent Upon Final Approval of Board of Directors
RC-99-0152, Seeks Exemption Under 10CFR0.12a(2)ii from 10CFR50,App G Requirements to Establish pressure-temperature Limits Curves Using Methodology Presented in 1989 ASME Section Xi,App G19 August 1999Seeks Exemption Under 10CFR0.12a(2)ii from 10CFR50,App G Requirements to Establish pressure-temperature Limits Curves Using Methodology Presented in 1989 ASME Section Xi,App G
RC-99-0164, Forwards semi-annual Fitness for Duty Rept from 990101 to 990630 for VC Summer Nuclear Station,Iaw 10CFR26.71(d)17 August 1999Forwards semi-annual Fitness for Duty Rept from 990101 to 990630 for VC Summer Nuclear Station,Iaw 10CFR26.71(d)Fitness for Duty
RC-99-0156, Forwards Rev 1 to VC Summer Nuclear Station COLR for Cycle 12, IAW TS Section 6.9.1.11.Sections 2.1 & 3.0 Were Added to Include Beacon Tsm4 August 1999Forwards Rev 1 to VC Summer Nuclear Station COLR for Cycle 12, IAW TS Section 6.9.1.11.Sections 2.1 & 3.0 Were Added to Include Beacon Tsm
RC-99-0147, Submits Attached Request for Relief from Performing SG PORV Strike Time Testing to Acceptance Criteria of Asme/Ansi OMa-198826 July 1999Submits Attached Request for Relief from Performing SG PORV Strike Time Testing to Acceptance Criteria of Asme/Ansi OMa-1988Stroke time
Power-Operated Valves
RC-99-0129, Provides Response to non-cited Violations Noted in Insp Rept 50-395/99-03.C/As:concluded That Cask Loading Pit Inaccessible & Duration of Dose Rates on Operating Floor of Fhb So Short That High Radiation Area Did Not Exist7 July 1999Provides Response to non-cited Violations Noted in Insp Rept 50-395/99-03.C/As:concluded That Cask Loading Pit Inaccessible & Duration of Dose Rates on Operating Floor of Fhb So Short That High Radiation Area Did Not ExistHigh Radiation Area
RC-99-0131, Forwards Rev 9 to VC Summer Nuclear Station Safeguards Contingency Plan,Per 10CFR50.54(p).Encl Withheld7 July 1999Forwards Rev 9 to VC Summer Nuclear Station Safeguards Contingency Plan,Per 10CFR50.54(p).Encl Withheld
RC-99-0127, Estimates Submittal of Eleven Licensing Actions in Fy 2000. Based on Statistical Estimates of Past Licensing Actions, Number of Licensing Actions in Fy 2001 Should Be Approx Ten, in Response to AL 99-027 July 1999Estimates Submittal of Eleven Licensing Actions in Fy 2000. Based on Statistical Estimates of Past Licensing Actions, Number of Licensing Actions in Fy 2001 Should Be Approx Ten, in Response to AL 99-02
RC-99-0114, Submits Response to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps, Under Oath or Affirmation30 June 1999Submits Response to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps, Under Oath or Affirmation
05000395/LER-1999-006, Forwards LER 99-006-00,describing Identified Safety Hazard with GE 7.2kV Magne-Blast Circuit Breakers.Event Is Being Reported Per 10CFR21.21a(1)17 May 1999Forwards LER 99-006-00,describing Identified Safety Hazard with GE 7.2kV Magne-Blast Circuit Breakers.Event Is Being Reported Per 10CFR21.21a(1)
RC-99-0104, Forwards Amend 17 to Training & Qualification Plan, Under Provisions of 10CFR50.54(p).Summary of Plan Changes Is Included as Part of Controlled Copy13 May 1999Forwards Amend 17 to Training & Qualification Plan, Under Provisions of 10CFR50.54(p).Summary of Plan Changes Is Included as Part of Controlled Copy
RC-99-0105, Forwards Copy of Sce&G Co 1998 Annual Financial Rept & Sc Public Service Authority 1998 Annual Financial Rept, for VC Summer Nuclear Station13 May 1999Forwards Copy of Sce&G Co 1998 Annual Financial Rept & Sc Public Service Authority 1998 Annual Financial Rept, for VC Summer Nuclear Station
05000395/LER-1999-005, Forwards LER 99-005-00 for VC Summer Nuclear Station.Rept Describes Potential Condition for Exceeding Vsns Plant Design Basis Due to Submergence Qualification Issues for Certain ESF Components12 May 1999Forwards LER 99-005-00 for VC Summer Nuclear Station.Rept Describes Potential Condition for Exceeding Vsns Plant Design Basis Due to Submergence Qualification Issues for Certain ESF Components
RC-99-0097, Forwards Sce&G Cycle 12 COLR, IAW TS Section 6.9.1.116 May 1999Forwards Sce&G Cycle 12 COLR, IAW TS Section 6.9.1.11
RC-99-0080, Submits Supplemental Info Re 970128 Response to NRC GL 96-06 Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions. Addl Analysis & Manpower Expenditure Involved Not Cost Effective6 May 1999Submits Supplemental Info Re 970128 Response to NRC GL 96-06 Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions. Addl Analysis & Manpower Expenditure Involved Not Cost Effective
RC-99-0092, Informs That Util Has Reviewed Proposed Notice of Rulemaking & Fully Endorse Comments Prepared & Submitted on Behalf of Commercial Nuclear Power Industry by NEI3 May 1999Informs That Util Has Reviewed Proposed Notice of Rulemaking & Fully Endorse Comments Prepared & Submitted on Behalf of Commercial Nuclear Power Industry by NEI
RC-99-0090, Submits Special Rept (Spr 1999-003) Re Completion of ISI of SG Tubes,Indicating Number of Tubes Plugged or Repaired in Each Generator,Per TS 4.4.5.5.a & Section 4.4.5.5.b29 April 1999Submits Special Rept (Spr 1999-003) Re Completion of ISI of SG Tubes,Indicating Number of Tubes Plugged or Repaired in Each Generator,Per TS 4.4.5.5.a & Section 4.4.5.5.b
05000395/LER-1999-002, Forwards LER 99-002-00 Re Condition for Exceeding Vsns Design Basis During Surveillance Testing Utilizing Certain ECCS Valves.Simplified Flow Diagram Included to Identify Configurations Discussed by Rept Encl12 April 1999Forwards LER 99-002-00 Re Condition for Exceeding Vsns Design Basis During Surveillance Testing Utilizing Certain ECCS Valves.Simplified Flow Diagram Included to Identify Configurations Discussed by Rept Encl
RC-99-0078, Submits Summary of Present Levels of Property Insurance & Cash Flow Statement for VC Summer Nuclear Station,Per 10CFR50.54(w)(3) & 10CFR140.21(e)1 April 1999Submits Summary of Present Levels of Property Insurance & Cash Flow Statement for VC Summer Nuclear Station,Per 10CFR50.54(w)(3) & 10CFR140.21(e)
RC-99-0066, Submits Rept of Status of Decommissioning Funding (RR-1950), for Vsns Per 10CFR50.7531 March 1999Submits Rept of Status of Decommissioning Funding (RR-1950), for Vsns Per 10CFR50.75
ML20205B99829 March 1999Informs That Authority & Sce&G Has Ownership Interests of one-third & two-thirds,respectively in VC Summer Nuclear Station.Operating License Scheduled to Expire in 2022.Rept Addresses Decommissioning Cost Estimates & Financing
RC-99-0054, Forwards Rev 2 to VC Summer Nuclear Station Training Simulator Quadrennial Certification Rept,1996-99, Per 10CFR55.45(b)(5)(ii)22 March 1999Forwards Rev 2 to VC Summer Nuclear Station Training Simulator Quadrennial Certification Rept,1996-99, Per 10CFR55.45(b)(5)(ii)
RC-99-0053, Requests That Implementation Date of Proposed TS Change Request Re Best Estimate Analyzer for Core Operations - Nuclear (Beacon) Be Extended. Util Requests 120 Day Time Frame to Perform Initial Beacon Calibrs During Cycle 1222 March 1999Requests That Implementation Date of Proposed TS Change Request Re Best Estimate Analyzer for Core Operations - Nuclear (Beacon) Be Extended. Util Requests 120 Day Time Frame to Perform Initial Beacon Calibrs During Cycle 12
RC-99-0048, Informs That Util Has Implemented Policy That Requires All Personnel Granted Unescorted Access to Vsns Satisfactorily Complete Test on Site Specific Info10 March 1999Informs That Util Has Implemented Policy That Requires All Personnel Granted Unescorted Access to Vsns Satisfactorily Complete Test on Site Specific Info
ML20207J56616 February 1999Requests That Proprietary Rev 1 to WCAP-14932 Re Rv Closure Head Penetrations Integrity for VC Summer Nuclear Plant,Be Withheld from Public Disclosure,Per 10CFR2.790(b)(4)
RC-99-0026, Provides Response to NRC RAI Re TS Change Request Re Best Estimate Analyzer for Core Operations - Nuclear5 February 1999Provides Response to NRC RAI Re TS Change Request Re Best Estimate Analyzer for Core Operations - Nuclear
RC-99-0023, Informs That in Response to GL 97-06,SCE&G Informed NRC of Plan to Perform Secondary Side Examination Scheduled for Refueling Outage RF-11.SCE&G Has Decided to Defer Secondary Side Insp of Sg.Reasons for Change of Plan Listed1 February 1999Informs That in Response to GL 97-06,SCE&G Informed NRC of Plan to Perform Secondary Side Examination Scheduled for Refueling Outage RF-11.SCE&G Has Decided to Defer Secondary Side Insp of Sg.Reasons for Change of Plan Listed
05000395/LER-1998-009, Forwards LER 98-009-01 for VC Summer Nuclear Station.Rept Describes Unanalyzed Condition for non-safety Related Component for Which All Failure Mechanisms Had Not Been Evaluated28 January 1999Forwards LER 98-009-01 for VC Summer Nuclear Station.Rept Describes Unanalyzed Condition for non-safety Related Component for Which All Failure Mechanisms Had Not Been EvaluatedUnanalyzed Condition
RC-99-0015, Forwards Amend 16 to Training & Qualification Plan,Per 10CFR50.54(p).Summary of Changes,Encl22 January 1999Forwards Amend 16 to Training & Qualification Plan,Per 10CFR50.54(p).Summary of Changes,Encl
RC-99-0005, Responds to 980908 RAI Re GL 97-01, Degradation of Control Rod Drive Mechanism Nozzle & Other Vessel Closure Head Penetrations15 January 1999Responds to 980908 RAI Re GL 97-01, Degradation of Control Rod Drive Mechanism Nozzle & Other Vessel Closure Head Penetrations
RC-98-0225, Forwards Rev 41 to EP-100, Radiation Emergency Plan. List of Changes by Page Number Affected by Rev 41 Also Encl14 December 1998Forwards Rev 41 to EP-100, Radiation Emergency Plan. List of Changes by Page Number Affected by Rev 41 Also Encl
RC-98-0226, Forwards Amend 42 to Psp.Changes Do Not Degrade Safeguards Effectiveness in PSP or Safeguards Contingency Plan,As Described in 10CFR50.54(p).Without Encl14 December 1998Forwards Amend 42 to Psp.Changes Do Not Degrade Safeguards Effectiveness in PSP or Safeguards Contingency Plan,As Described in 10CFR50.54(p).Without Encl
RC-98-0216, Requests Extension of Response Period to 990115 to Respond to NRC 980908 RAI Re GL 97-01, Degradation of CRDM Nozzle & Other Vessel Closure Head Penetrations. Util Intends to Utilize Industry Generic RAI Response4 December 1998Requests Extension of Response Period to 990115 to Respond to NRC 980908 RAI Re GL 97-01, Degradation of CRDM Nozzle & Other Vessel Closure Head Penetrations. Util Intends to Utilize Industry Generic RAI Response
RC-98-0189, Provides Assessment Results of GL 98-02, Loss of Rc Inventory & Associated Potential for Loss of Emergency Mitigation Functions While in Shutdown Condition, Per 10CFR50.54f24 November 1998Provides Assessment Results of GL 98-02, Loss of Rc Inventory & Associated Potential for Loss of Emergency Mitigation Functions While in Shutdown Condition, Per 10CFR50.54f
RC-98-0207, Forwards 120-day Response to NRC GL 98-04, Potential for Degradation of ECCS & CSS After LOCA Because of Construction & Protective Coating Deficiencies & Foreign Matl in Containment11 November 1998Forwards 120-day Response to NRC GL 98-04, Potential for Degradation of ECCS & CSS After LOCA Because of Construction & Protective Coating Deficiencies & Foreign Matl in ContainmentFire Barrier
Commercial Grade Dedication
Coatings
Backfit
RC-98-0177, Informs That Sce&G Will Classify as Moderate Any Stratification Condition That Results in Total Cuf,Based on Design Basis Values Plus Any Contribution from Stratification,Of Between 0.1 & 0.79 November 1998Informs That Sce&G Will Classify as Moderate Any Stratification Condition That Results in Total Cuf,Based on Design Basis Values Plus Any Contribution from Stratification,Of Between 0.1 & 0.7
RC-98-0194, Provides Response to RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of SR Movs2 November 1998Provides Response to RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of SR Movs
RC-98-0202, Forwards Response to RAI Re Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions30 October 1998Forwards Response to RAI Re Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident ConditionsStroke time
Coast down
RC-98-0186, Expresses Appreciation for Opportunity to Present Topical Rept TR-104965, On-Line Monitoring of Instrument Channel Performance26 October 1998Expresses Appreciation for Opportunity to Present Topical Rept TR-104965, On-Line Monitoring of Instrument Channel Performance
RC-98-0185, Forwards non-proprietary Trs,Including Rev 0 to WCAP-15101, Analysis of Capsule W from Sce&G VC Summer Unit 1 Rv Radiation Surveillance Program & Rev 0 to WCAP-15103, Evaluation of PTS for VC Summer Unit 19 October 1998Forwards non-proprietary Trs,Including Rev 0 to WCAP-15101, Analysis of Capsule W from Sce&G VC Summer Unit 1 Rv Radiation Surveillance Program & Rev 0 to WCAP-15103, Evaluation of PTS for VC Summer Unit 1
RC-98-0182, Responds to 980402 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs8 October 1998Responds to 980402 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related MovsProbabilistic Risk Assessment
RC-98-0178, Provides Comments on SALP Insp Rept 50-395/98-99.Util Ack That Station Can Enhance Future Performance Further with More Focus & Attention on Change Mgt Practices Re Plant & Procedure Changes5 October 1998Provides Comments on SALP Insp Rept 50-395/98-99.Util Ack That Station Can Enhance Future Performance Further with More Focus & Attention on Change Mgt Practices Re Plant & Procedure Changes