Requests Extension of Response Period to 990115 to Respond to NRC 980908 RAI Re GL 97-01, Degradation of CRDM Nozzle & Other Vessel Closure Head Penetrations. Util Intends to Utilize Industry Generic RAI Response
ML20197H566
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 12/04/1998
From: Gabe Taylor
SOUTH CAROLINA ELECTRIC & GAS CO.
To: Padovan L
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-97-01, GL-97-1, RC-98-0216, RC-98-216, TAC-M98602, NUDOCS 9812140136
Download: ML20197H566 (3)


Text

&lc 1

7 December 4,1998 i ghgg RC-98 0216 A SCANA COMPANY

)

l l

Document Control Desk I

?-' '

U. S. Nuclear Regulatory Commission Washington, DC 20555 Attention: Mr. L. M. Pwdovan Gentlemen:

4,.W.hgg

Subject:

VIRGIL C. SUMMER NUCLEAR STATION

= na, president - DOCKET NO. 50/395 W!moverations OPERATING LICENSE NO. NPF 12 RESPONSE DUE DATE EXTENSION REQUEST FOR THE REQUEST FOR ADDITIONAL INFORMATION REGARDING RESPONSE FOR GENERIC LETTER 97-01 (TAC No. M98602)

" Degradation of Control Rod Drive Mechanism Nozzle and Other Vessel Closure Heac' *enetrations" m

Reference:

1. L. Mark Padovan letter to Gary J. Taylor, dated 15eMelica flecnk & Cas Co' September 8,1998 L %R Sume&ta Stati" - 2. Gary J. Taylor letter to Document Control Desk, 9 B"83 RC-97 0150, July 30,1997 kn nsville.suKalina
3. Gary J. Taylor letter to Document Control Desk, RC 97-0087, May 1,1997 ,

3013414344 L 8013415209 - . The NRC letter of September 8,1998 issued a request for additionalinformation (RAI) regarding the Virgil C. Summer Nuclear Station (VCSNS) Response to Generic Letter 97 01 submitted June 30,1997 and requested that the additional information be provided by December 7,1998. The RAI pertains to the Westinghouse Owner's Group (WOG) integrated program for assessing reactor vessel head penetration (RVHP) nozzles at WOG member plants and to the contents of Topical Report No. WCAP 14901 as it relates to the response lD

,  ; provided.

South Carolina Electric and Gas Company (SCE&G) has reviewed the RAI and has L. determined that the information requested is within the scope of the generic RAI c'

' response being developed by the EPRI Materials Reliability Project (MRP) Alloy 600 Issue Task Group (ITG) for voluntary use by licensees.

'\l

,'\D 9812140136 981204 PDR ADOCK 05000395

.. i. p NUCLEAR EXCELLENCE - A SUMMER TRADITIONI 1

lG L __-_______ _ . - . _ . - -.

\

Docum:nt Control Dcsk LTR 970001 i

RC-98-0216 Page 2 of 3

+

r The ITG was formed with the intent to tie together the efforts of the various owner's groups into one industry approach to the management and resolution of the CRDM reactor vessel i head penetration degradation issue. The Nuclear Energy Institute (NEI) is coordinating this effort and is the principalinterface with the NRC.

The generic ITG response will not be complete until early January,1999. This generic  !

response will not be completed in time for SCE&G's response which is currently due by December 7,1998. However, the NRC has stated that they prefer licensees to use generic responses when possible. NEl has communicated to licensees that the NRC has indicated a willingness to agree with an extension of the response period to January 15,1999, if {

required. NEl has advised these licensees to request extension of response due dates. '

As SCE&G is participating in the ITG effort and intends to utilize the industry generic RAI response, we request an extension of the response period to January 15,1999, for VCSNS.

I declare that these statements and matters set forth herein are true and correct to the best of my knowledge,information and belief.

Should you have questions, please call Mr. Jim Turkett at (803) 345 4047 or Mr. Chuck Barbier at (803) 345 4019.

Very truly yours, 0

\1ylo Ga JT/GJT/dr l Atachment c: J. L. Skolds C. C. Barbier W. F. Conway J. B. Knotts, Jr.

R. R. Mahan (w/o Attachment) Dave Modeen, NEl R. J. White NSRC L. A. Reyes RTS (LTR 970001)

L. M. Padovan File (815.14)

NRC Resident inspector DMS (RC 98 0216)

I i

l

~

Docum:nt Control Desk LTR 970001 RC 98 0216 Page 3 of 3 l

l 1

l STATE OF SOUTH CAROLINA -

l l

TO WU :

{

COUNTY OF FAIRFIELD  :

1 I hereby certify that on the I day of haA 19ff_, before me, the subscriber, a l Notary Public of the State of South Carolina personally appeared Gary J. Taylor, being duly sworn, and states that he is Vice President, Nuclear Operations of the South Carolina Electric

& Gas Company, a corporation of the State of South Carolina, that he provides the foregoing response for the pur:>oses therein set forth, that the statements made are true and correct to the best of his knowedge, information, and belief, and that he was authorized to provide the response on behalf of said Ccrporation.

WITNESS my Hand and Notarial Seal

/ N. / $%

Notaryp0blic My Commission Spires Date i