NPDES Noncompliance Notification:On 821015,component Yeilded Oil & Grease & Suspended Solids Higher than Permit Restrictions.Incident Possibly Caused by Auxiliary Bldg Drain Problem.Temporary Analysis Program Implemented
ML20091L170
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 11/22/1982
From: Russell L
BALTIMORE GAS & ELECTRIC CO.
To: Parise R
MARYLAND, STATE OF
Shared Package
ML20091K978 List:
References
NUDOCS 9201270295
Download: ML20091L170 (2)


Text

. _. _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ - - _ _ _ _ _ _ _

, ,e+

e

  • B ALTIMORE G AS AND ELECTRIC COMPANY -

e.o. s o x 14 7 s ,

D ALTIMOR c. M A R YL AND 212o3 )

I nucle AR Po*ER DEPARTutNT C ALs 4 RT CLIF r$ huCL E AR Pourn PL AN1 LU$ 9Y. M A 8LY L AN D 20487 l

November 22, 1982 Office of Environmental Programs Waste Management Administration 201 West Preston Street Baltimore, Maryland 21201 Att ention : Mr. Ronald Parise Re: Maryland State Discharge Permit No. 74-DP-0187 and NPDES Permit No. MD 0002399

Dear Mr. ?arise:

Monitoring point 105 of outfall 001 of the reference permit is described as miscellaneous vaste streams. Since the plant actually has two components to this monitoring point, we have typically monitored both substreams independently. The report data is computed on a weighted average basis when both substreams are discharged in the same 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period, or reported separately when discharges occur on separate days.

On October 15, 1982 the weighted average of the two components to monitoring point 105 y.'.elded results within permit specifications. However, one of the components yielded oil and grease and suspended solids higher than permit restrictions and an investigation was instituted. Subsequent investigative analyses of this sourwo has indicated above specification oil and grease and suspended solids. During the investigation, the daily maximum specifications were exceeded for the following 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> periods:

105 B Suspended _ Solids Oil 6 Grease 10/15/82 204.0 195.3 10/21/82 - 85.0 10/28/82 158.5 228.7 11/1/82 58 45 11/3/82 Sc 9 28.5 We believe the unusually h',h oil and suspended solids resulted from an Auxilitry Building drain roblem. We r.lso believe this to be an isolated occurrence and except f- an increased monitoring frequency, we have made no corrective action. ae have implemented a temporary program to perfor,.

9201270295 92r 16

{DR ADOCK 03 0o337 u- PDR

. , n.

4 4

)

l Mr. Ronald Parise November 22, 1982 i

i the oil and grear,e and suspended solids analysis prior to release of the  ;

constituents at monitoring point 105. This should prevent further relems. '

above specification. Once we are satis fied that conditions have returned l to noma 1, we will return to the routine monitoring schedule, i

Very truly yours, LY L. B. Russell a Plant Superintendent-LBR/RES/feb  :

?