MONTHYEARML20206K7801998-12-31031 December 1998 Radiological Environ Monitoring Program Annual Rept for Ccnpp,Units 1 & 2 & ISFSI,Jan-Dec 1998. with ML20207A9751998-12-31031 December 1998 Radioactive Effluent Release Rept for Calvert Cliffs Isfsi ML20195J7671998-12-31031 December 1998 Semi-Annual Surface Water Withdrawal Rept ML20206C7391998-12-31031 December 1998 Occupational Radiation Exposure Repts for 1998, as Required by Units 1 & 2 Tech Specs 5.6.1 & 6.1 of ISFSI ML20212H2721997-12-31031 December 1997 ISFSI Occupational Radiation Exposure Repts for 1997 ML20247H6211997-12-31031 December 1997 Radiological Environ Monitoring Program Annual Rept for 970101-1231 ML20237A6421997-12-31031 December 1997 Radioactive Effluent Release Rept ML20210Q0971996-12-31031 December 1996 Radioactive Effluent Release Rept,Effluent & Waste Disposal Suppl Info,Second Half of 1996 ML20141A5451996-12-31031 December 1996 Radiological Environ Monitoring Program Annual Rept for 1996, for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20135F0661996-12-31031 December 1996 ISFSI Occupational Radiation Exposure Repts ML20064C9941993-12-31031 December 1993 1993 Bg&E Calvert Cliffs Nuclear Power Plant Rept on Number of Personnel & Man-Rem by Work & Job Functions ML20064F1871993-12-31031 December 1993 Effluent & Waste Disposal Semiannual Rept for Second Half 1993, Suppl Info ML20056F5691993-06-30030 June 1993 Effluent & Waste Disposal Semiannual Rept for First Half of 1993 ML20012G4191992-12-31031 December 1992 Rept on Number of Personnel & Man-Rem by Work & Job Function for 1992. ML20118A3751992-06-30030 June 1992 Effluent & Waste Disposal Semiannual Rept for First Half 1992 ML20095J2811992-04-24024 April 1992 Suppl to Calvert Cliffs Units 1 & 2 Semiannual Effluent Release Rept for Jul-Dec 1991, Updating Strontium Analytical Results for Fourth Quarter 1991 ML20104A2461991-12-31031 December 1991 Amended Table 1A,(page 9) from Calvert Cliffs Nuclear Power Plant Effluent & Waste Disposal Semiannual Rept,Jul-Dec 1991, Re Gaseous Effluents - Summation of All Releases ML20141M1241991-12-31031 December 1991 Radiological Environ Monitoring Program Annual Rept for Calvert Cliffs Nuclear Plant Units 1 & 2,1991 ML20092G1151991-12-31031 December 1991 Annual Personnel Exposure Rept for 1991, Consisting of Listing of Number of Personnel & man-rem by Work & Job Function ML20092E9851991-12-31031 December 1991 Personnel Monitoring Rept for 1991. W/ ML20090A7941991-12-31031 December 1991 Effluent & Waste Disposal Semiannual Rept,Jul-Dec 1991 ML20082M4641991-06-30030 June 1991 Effluent & Waste Disposal Semiannual Rept for Second Quarter 1991 ML20113G2191991-06-30030 June 1991 Supplement to Semiannual Radioactive Effluent Release Rept, Calvert Cliffs Nuclear Power Plant,First Half 1991 ML20077G9901990-12-31031 December 1990 Updated Tables 1A,1C,2A & 2B Re Gaseous & Liquid Effluents to Semiannual Effluent Release Rept for Second Half 1990 ML20070D3021990-12-31031 December 1990 Number of Personnel & Man-Rem by Work & Job Function & Personnel Whole Body Exposure for CY90 ML20029A7661990-12-31031 December 1990 Semiannual Effluent Release Rept for Second Half 1990. ML20059D2511990-06-30030 June 1990 Semi-Annual Effluent Release Rept for Calvert Cliffs Nuclear Power Plant First Half 1990 ML20058B9071990-06-30030 June 1990 Updated Tables 1C,2A,2B & Page 4 to Semiannual Effluent Release Rept for First Half 1990 ML20042F0121989-12-31031 December 1989 Updated Tables 1C,2A,2B,3A & Page 7 of Semiannual Effluent Release Release Rept for Second Half of 1989 ML20012A2451989-12-31031 December 1989 Rept of Number of Personnel & Man-Rem by Work & Job Function 1989. W/900228 Ltr ML20012A3261989-12-31031 December 1989 Personnel Whole Body Exposures for CY89. W/900228 Ltr ML20058B9121989-12-31031 December 1989 Revised Page 4 to Semiannual Effluent Release Rept for Second Half 1989 ML20012E2131989-12-31031 December 1989 Radiological Environ Monitoring Program Annual Rept for Calvert Cliffs Nuclear Power Plant Units 1 & 2 Jan-Dec 1989. W/900330 Ltr ML20246K5831989-06-30030 June 1989 Semiannual Effluent Release Rept for Calvert Cliffs Nuclear Power Plant First Half 1989 ML20042F0211989-06-30030 June 1989 Updated Table 3A, Solid Waste & Irradiated Fuel Shipments to Effluent & Waste Disposal Semiannual Rept for First Half of 1989 ML20247J7171988-12-31031 December 1988 Radiological Environ Monitoring Program Annual Rept for Calvert Cliffs Nuclear Power Plant Units 1 & 2,1988 ML20235L6821988-12-31031 December 1988 Semiannual Effluent Release Rept for Calvert Cliffs Nuclear Power Plant Second Half 1988 ML20042F0171988-12-31031 December 1988 Updated Table 3A for Effluent & Waste Disposal Semiannual Rept for Second Half of 1988 Re Solid Waste & Irradiated Fuel Shipments ML20235Z1761988-12-31031 December 1988 Personnel Whole Body Exposures for CY88 ML20245D3271988-12-31031 December 1988 Updated, Effluent & Waste Disposal Semiannual Rept,Second Half 1988 ML20235N0691988-12-31031 December 1988 Number of Personnel & Man-Rem by Work & Job Function, Calvert Cliffs Nuclear Plant - 1988 ML20205R5981988-06-30030 June 1988 Updated Semiannual Effluent Release Rept for First Half 1988, Covering Gaseous & Liquid Effluents ML20245D3241988-06-30030 June 1988 Updated, Effluent & Waste Disposal Semiannual Rept,First Half 1988 ML20153D4621988-06-30030 June 1988 Semiannual Effluent Release Rept,Calvert Cliffs Nuclear Power Plant,First Half 1988 ML20154A6641988-06-30030 June 1988 Table 1A,Reg Guide 1.21, 'Effluent & Waste Disposal Semiannual Rept,Second Half 1987' ML20196G1491987-12-31031 December 1987 Semiannual Effluent Release Rept,Calvert Cliffs Nuclear Power Plant,Second Half 1987 ML20150E7121987-12-31031 December 1987 Radiological Environ Monitoring Program Annual Rept for Calvert Cliffs Nuclear Power Plant Units 1 & 2, Jan-Dec 1987 ML20148L2661987-12-31031 December 1987 Revised Tables 1C,2A & 2B of Semiannual Effluent Release Rept for Second Half 1987 ML20237J4091987-06-30030 June 1987 Semiannual Effluent Release Rept for First Half 1987 ML20235J1581987-06-30030 June 1987 Updated Tables 1A,1C,2A & 2B of Calvert Cliffs Nuclear Power Plant Effluent & Waste Disposal Semiannual Rept:First Half 1987 1998-12-31
[Table view] Category:TEXT-ENVIRONMENTAL REPORTS
MONTHYEARML20217P1761999-10-31031 October 1999 Generic Environmental Impact Statement for License Renewal of Nuclear Plants.Supplement 1 Regarding the Calvert Cliffs Nuclear Power Plant.Final Report ML20205E0041999-02-28028 February 1999 Generic Environmental Impact Statement for License Renewal of Nuclear Plants.Calvert Cliffs Nuclear Power Plant.Draft Report for Comment ML20195J7671998-12-31031 December 1998 Semi-Annual Surface Water Withdrawal Rept ML20207A9751998-12-31031 December 1998 Radioactive Effluent Release Rept for Calvert Cliffs Isfsi ML20206K7801998-12-31031 December 1998 Radiological Environ Monitoring Program Annual Rept for Ccnpp,Units 1 & 2 & ISFSI,Jan-Dec 1998. with ML20206C7391998-12-31031 December 1998 Occupational Radiation Exposure Repts for 1998, as Required by Units 1 & 2 Tech Specs 5.6.1 & 6.1 of ISFSI ML20155B2621998-10-26026 October 1998 Environ Impact Statement Scoping Process Summary Rept for Calvert Cliffs Nuclear Power Plant,Lusby,Md ML20236F3451998-06-29029 June 1998 NPDES Noncompliance Notification:On 980615,sample Was Taken & Result Reported That Fecal Coliform Result Was 900 MPN/100 Ml.Result Exceeded Daily Max Limitations.Effluent Was Sampled Again on 980622 & Results Are Expected on 980701 ML20247H6211997-12-31031 December 1997 Radiological Environ Monitoring Program Annual Rept for 970101-1231 ML20237A6421997-12-31031 December 1997 Radioactive Effluent Release Rept ML20212H2721997-12-31031 December 1997 ISFSI Occupational Radiation Exposure Repts for 1997 ML20210Q0971996-12-31031 December 1996 Radioactive Effluent Release Rept,Effluent & Waste Disposal Suppl Info,Second Half of 1996 ML20141A5451996-12-31031 December 1996 Radiological Environ Monitoring Program Annual Rept for 1996, for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20135F0661996-12-31031 December 1996 ISFSI Occupational Radiation Exposure Repts ML20134C9511996-10-0404 October 1996 Environ Assessment & Finding of No Significant Impact Re Transfer of Control of Operating Licenses Re Plant & ISFSI ML20112K0161996-06-18018 June 1996 NPDES Noncompliance Notification:On 960520,BOD5 Results of Sample Taken from Sewage Treatment Plant Effluent Exceeded Daily Max Limitation.Cause of Event Investigated & Unknown. Plant Operations During Period Not Changed ML20078F5481995-01-30030 January 1995 NPDES Noncompliance Rept Notification:On 950111,approx 2,500 Gallons of Suspected Low Concentration Propylene Glycol Solution Discharged to Site Outfall 002 ML20072S3751994-07-25025 July 1994 NPDES Noncompliance Notification:On 940720,plant Intake Embayment Instrumentation Probe Found to Be Not Working. Caused by Saltwater Leakage & Subsequent Damage to Measuring Probe Internals.Equipment Replaced on 940722 ML20072S3441994-07-12012 July 1994 NPDES Noncompliance Notification:On 940706,salinity Meter Found Out of Svc During Surveillance of Effluent Monitoring for Intake Embayment.Caused by Water Leak.Current Monitoring Equipment Being Replaced ML20195J6601994-06-16016 June 1994 NPDES Permit MD0002399,issued to Bg&E ML20072S3601994-06-0707 June 1994 NPDES Noncompliance Notification:On 940601,plant Intake Embayment Instrumentation Oxygen Probe & Data Recorder Found Not to Be Working.Caused by Corroded Internal Connectors & Replacement Tape Cassette Failure,Respectively ML20064G4311994-03-0303 March 1994 NPDES Noncompliance Notification:On 940225,grease & Oil Analysis at 08:00 Was 39.1 Mg/L.Caused by Pavement Runoff Due to Intense Rainfall.Resampling Results Were 0.3 Mg/L ML20063B8231994-01-0707 January 1994 NPDES Noncompliance Notification:On 940104,plant Intake Embayment Dissolved Oxygen Instrumentation Found Damaged. Caused by Failed Oxygen Probe.Probe Repaired ML20064C9941993-12-31031 December 1993 1993 Bg&E Calvert Cliffs Nuclear Power Plant Rept on Number of Personnel & Man-Rem by Work & Job Functions ML20064F1871993-12-31031 December 1993 Effluent & Waste Disposal Semiannual Rept for Second Half 1993, Suppl Info ML20058F2411993-12-0202 December 1993 NPDES Noncompliance Notification:On 931021,trailer That Houses Continuous Monitoring Equipment Removed,Resulting in Failure to Perform Continuous Monitoring of Intake Water. Continuous Monitoring Equipment Returned to Svc on 931117 ML20059B3471993-10-22022 October 1993 Suppl to Environ Rept Calvert Cliffs Nuclear Power Plant ML20056F5691993-06-30030 June 1993 Effluent & Waste Disposal Semiannual Rept for First Half of 1993 ML20012G4191992-12-31031 December 1992 Rept on Number of Personnel & Man-Rem by Work & Job Function for 1992. ML20101S9301992-07-14014 July 1992 NPDES Noncompliance Notification:On 920608,sample Analysis for Fecal Coliform Indicated Concentration of 900 MPN/100 Mi Greater than Max NPDES Limit of 400 MPN/100 Mi.Cause Not Determined.Concentration of Chlorine Increased ML20118A3751992-06-30030 June 1992 Effluent & Waste Disposal Semiannual Rept for First Half 1992 ML20095J2811992-04-24024 April 1992 Suppl to Calvert Cliffs Units 1 & 2 Semiannual Effluent Release Rept for Jul-Dec 1991, Updating Strontium Analytical Results for Fourth Quarter 1991 ML20092G1151991-12-31031 December 1991 Annual Personnel Exposure Rept for 1991, Consisting of Listing of Number of Personnel & man-rem by Work & Job Function ML20092E9851991-12-31031 December 1991 Personnel Monitoring Rept for 1991. W/ ML20090A7941991-12-31031 December 1991 Effluent & Waste Disposal Semiannual Rept,Jul-Dec 1991 ML20104A2461991-12-31031 December 1991 Amended Table 1A,(page 9) from Calvert Cliffs Nuclear Power Plant Effluent & Waste Disposal Semiannual Rept,Jul-Dec 1991, Re Gaseous Effluents - Summation of All Releases ML20141M1241991-12-31031 December 1991 Radiological Environ Monitoring Program Annual Rept for Calvert Cliffs Nuclear Plant Units 1 & 2,1991 ML20091L0301991-12-23023 December 1991 NPDES Noncompliance Notification:On 911216,sample Analysis of Fecal Coliform Indicated Concentration Greater than 1600 mpn/100 Ml Sample,Exceeding Limit.Caused by Sodium Hypochlorite Pump Problems.Chlorine Concentration Increased ML20091L0341991-12-13013 December 1991 NPDES Noncompliance Notification:On 911209,fecal Coliform Analysis Indicated Concentration Greater than 1600 mpn/100 Ml,Exceeding Limit.Caused by Improper Residual Chlorine Analysis.Test Kit Comparator Replaced ML20091L0511991-10-30030 October 1991 NPDES Noncompliance Notification:On 911022,during Electrical Outage No Residual Chlorine Could Be Identified in Routine Weekly Sample.Fecal Coliform Analysis Yielded Concentration Greater That Daily Max Limit.Faulty Breaker Opened Manually ML20082M4641991-06-30030 June 1991 Effluent & Waste Disposal Semiannual Rept for Second Quarter 1991 ML20113G2191991-06-30030 June 1991 Supplement to Semiannual Radioactive Effluent Release Rept, Calvert Cliffs Nuclear Power Plant,First Half 1991 ML20077G9901990-12-31031 December 1990 Updated Tables 1A,1C,2A & 2B Re Gaseous & Liquid Effluents to Semiannual Effluent Release Rept for Second Half 1990 ML20029A7661990-12-31031 December 1990 Semiannual Effluent Release Rept for Second Half 1990. ML20070D3021990-12-31031 December 1990 Number of Personnel & Man-Rem by Work & Job Function & Personnel Whole Body Exposure for CY90 ML20059D2511990-06-30030 June 1990 Semi-Annual Effluent Release Rept for Calvert Cliffs Nuclear Power Plant First Half 1990 ML20058B9071990-06-30030 June 1990 Updated Tables 1C,2A,2B & Page 4 to Semiannual Effluent Release Rept for First Half 1990 ML20091L0611990-01-10010 January 1990 NPDES Noncompliance Notification:On 891218,auxiliary Boiler Blew Down Releasing Approx 6,000 Gallons Auxiliary Boiler Water Into Chesapeake Bay.Monthly Average of 30 Mg/Liter Was Exceeded ML20011F4161989-12-31031 December 1989 Rev 2,to Evaluation Time Estimates within Plume Exposure Pathway EPZ for Calvert Cliffs Nuclear Power Plant. ML20058B9121989-12-31031 December 1989 Revised Page 4 to Semiannual Effluent Release Rept for Second Half 1989 1999-02-28
[Table view] |
Text
-
s
- 4-BALTIMORE i GAS AND 1 ELECTRIC ;
CHARLES CENTER e P.O. BOX 1475
- BALTIMORE, MARYLAND 21203-1475 R E.DENToN GENERAL MANAGER April 24,1992 U. S. Nuclear Regulatory Comm.ssion Washingtor.,DC 20555 A'ITENTION: Document Control Desk
SUBJECT:
Calvert Cliffs Nuclear Power Plant Unit Nos.1 & 2; Docket Nos. 50-317 & 50-318 Supplemental Semi-Annual Efnuent Release Report Gentlemen:
Enclosed please find the Supplemental Semi-Annual Effluent Release Report in accordance with Calvert Cliffs Units 1 and 2 Technical Specification 6.9.1.8. This update incluc's 'he strontium analytical results for the fourth quartu of 1991. This update also includes change La Attachments (2A), (3A), and Appendix B. Attachment (2A) was modified to include a continuous d3 charge containing only tritium that was not included in our original report. A typographic error was also corrected for the third quarter dilution water value. The change to Attachment (3A) was made to correct the original report because a selfidentified calculation error was discovered on several resin solid waste shipments. Appendix B was modified to remove the ODCM change 91-211 that was
- never approved in 1991,- Please replace the original pages with the enclosed pages.
Should you have any further questions regarding this matter, we will be_ pleased to discuss them with you.
% eryV truly yours, r w RED /JAS/CDS/bjd Enclosure cc: D. A. Brune, Esquire J. E. Silberg, Esquire -
R. A. Capra, NRC ~ i D. G. Mcdonald, Jr., NRC T. T. Martin, NRC l
[
P. R. Wilson, NRC
- P. I. McLean,- DNR !
J. H. Walter, PSC - #
1 i
(; . O n t r, 9205010221 920424 ADOCK 05000317 f
PDR R- PDR 3 l
9
~
. D. ODCM and Process Contml Plan (PCP) Changes One change was made to the ODCM during the second half of 1991. The change was j reviewed by POSRC and approved by the Plant General Manager, Calvert Cliffs Nucicar Power Plant, prior to implementation. The scope and basis for this char r is discussed in Appendix B. In keeping with thc requirement of the Technical Specification 6.17, a copy of the change to the CCNPP ODCM is enclosed in Attach.nent 1. Vertical lines in the right margin of the text denote the abm referenced change with accompanying change number.
No changes were made in the PCP in t ee second half of 1991.
E. Radioactive Gaseous Efluent Monitoring Instrumentation The Unit 2 Main Vent IIcader Noble Gas effluent reonitor (2-RI.5415) was out of service for greater than 30 days during the second half of 1991. This notice is required by Technical Specification 3.3.3.9. This monitor was declared inoperable on Aegust 9, 1991 because of frequent RMS pump failures. The source of the failures was a
, blocked discharge line fitting but the source of the problem was not immediately l
identified despite extensive troubleshooting efforts. The RMS effluent monitor was restored to service on September 12,1991.
IV. AVERAGE ENERGY Not Applicable.
V. MEASilREMENTS AND APPROXIMATIONS AND TOTAL HADIOACTI\TlY A. Fission and Activation Gases
- 1. Batch Releases Prior to each batch release of gas from a pressurized gas decay tank, a sample L is collected and analyzed by pmma spectroscopy using a Ge detector for the i
principal gamma emitting noble gas radionuc! ides. The total activity released is based on the pressure / volume relationship (gas laws) of the tank.
Prior to and after each containment purge, a gas sample is collected and analyzed by gamma spectroscopy using a Ge detector for the principal gamma emitting noble gas radionuclides. The total actipty released is based on containment volume and purge rate. Activity buildup while purging is also considered.
- 2. Continuous Releases t . -
l A gas sample is collected at least weekly from the main vents and analyzed by gamma spectroscopy using a Ge detector for the principal gamma emitting noble gas radionuchdes. The total activity released for the week is based on
- the total sample activity decay cor ected to the midpoint of the sample period multiplied by the main vent flow for the week.
L 4
3- ,
, TAllLE IC - REG GUIDE 1,21 (Cont.)
C ALVERT CLIFFS NUCLEAR POWER PLANT
' EFFLUENT AND WASTE DISPOSAL SE511-ANNUAL REPORT SECOND IIALF- 1991 GASEOUS EFFLUENTS GROUND LEVEL REl EASES CONTINUOUS MJDE IIATCil h10DE 3RD 4TII 3RD 4Til
- 3. PARTICULATES UNITS QUARTER QUARTER QUARTER QUARTER Manganese -54 Ci (2) (2) (1) (1)
Iron -59 Ci (2) (2) (1) (1)
Cobalt -58 Ci (2) (2) (1) (1)
Cobalt -60 Ci (2) (2) (1) (1)
Zinc -65 Ci (2) (2) (1) (1)
Strontium -89 - Ci (2) (2) (1) (1) l Strontium -90 Ci (2) (2) (1) (1) l Molybdenum -99 Ci (2) (2) (1) (1)
Cesium -134 Ci (2) (;2) (1) (1)
Cesium -137 Ci (2) (2) (1) (1)
Cerium . -141 Ci (2) (2) (1) (1)
Cerium 144 Ci (2) (2) (1) (1)
- Total For Period Ci -- -
(1) (1)
NOTES TO TAllLE IC (1) Iodines and particulates in batch releases are accounted for with the main vent continuous samplers when the release is made through the piant main vent.
(2) Lcss than minimum detectable activity which meets the LLD requirements of Technical Specification Surveillance Requirement 4.11.2.1.2.
12
l
,. 'l'ABLE 2A - REG GUIDE 1.21 CALVERT CLIFFS NUCLEAR POWER PLANT EFFLUENT AND WASTE DISPOSAL SEMI-ANNUAL HEPORT SECONDllALF 1991 LIOUID EFFLUENTS SUMMATION OF ALL RELEASES 3RD 4Til EST. TOTAL A. FISSION AND ACTIVATION PRODUCTS UNITS QUARTER QUARTER ERHOR, %
- 1. Total Release (not including tritium, gases, alpha) Ci 5.87E-01 1.62E-01 3.30E+00
- 2. Average diluted concentration during period uCi/mi 1.18E-08 7.71E-10 l
- 3. Percent of Tech. Spee, limit (1) % 8.45E-02 1.75E-04
- 4. Percent of Tech Spec. limit (2) % 4.25E-02 8.75E-02
- 5. Percenuf Tech. Spec. limit (3) % 5.59E-01 2.50E-02
- 6. Percent of Tech. Spec. limit (4) % 2.79E-01 L25E-02 IL TRITIUM
- 1. Total Rele ase Ci 4.33E+02 4.52E+ 02 19.80E+00
~
- 2. Average diluted concentration durini, period . uCi/ml 8.66E-06 2.15E-06 l
- 3. Percent of applicablelimit(5) % 2.89E-01 7.17E-02 l C. DISSOLVED AND ENTRAINED GASES
- 1. Total Release Ci 2.95E-02 1.76E-01 14.60E+00
- 2. ' Average diluted concentration dtiring period uCi/ml 5.95E-10 8.38E-10 l t 13
TABLE 2A - REG GUlDE 1.21 (Cont.)
CALVERT CLIFFS NUCLEAR POWER PLANT EFFLUENT AND WASTE DISPOSAL SEMI. ANNUAL REPORT SECOND llALF- 1991 LIOUID EFFLUENTS - SUMMATION OF ALL RELEASES 3RD 4TIl EST. TOTAL D. GROSS ALPIIA RADIOACTBTlY UNITS QUARTER QUARTER ERROR, %
- 1. Total Release Ci 2.23E-05 8.35 E-05 i5.36E+01 E. VOLUME OF WASTE RELEASES (prior to dilution) liters 9.73E +06 3.15E+07 1.30E +00 l F. VOLUME OF DILUTION WATER USED DURING PERIOD liters 5.00E+ 10 2.10E + 11 11.64E+01 l ,
l l
NOTES TO TABLE 2A (1) Percent ofI.C.3 Quarterly Organ Dose Limit (10 mrem)
(2) Percent ofI.C.3 Yearly Organ Dose Limit (20 mrem)
(3)- Percent ofI.C.3 Quarterly Whole Body Dose Limit (3 mrem)
(4) Pe cent ofI.C.3 Yeacly Whole Body Dose Limit (6 m .:m)
'(5) Limit used is 3 x 10-3 uCi/ml (6) Less than minimum detectable activity which meets the LLD requirements of
, Technical Specification Surveillance Requirement 4.11.1.1.1.
t t
14
T.
. TAllLE 211. REG GUIDE 1.21 CALVERT CLIFFS NUCLEAR POWER PLANT EFFLUENT AND WASTE DISPOSAL SEMI ANNUAL REPORT SECOND llALF.1991 LIOUID EFFLUENTS CONTINUOUS MODE CATCH MODE 3RD 4TII 3RD 4TII NUCLIDES RELEASEI) UNITS QUARTER QUARTER QUARTER QUARTER i
Sodium - -24 Ci (1) (1) 8.74E-05 (1)
Chromium -51 Ci (1) (1) (1) ' 1.24 E-N Manganese -54 Ci (1) (1) 1.02E-03 1.92E-04 Cobalt -57 Ci (1) (1) (1) (1)
Cotialt -58 Ci (1) (1) 1.50E-02 7.35E-02 Iron -59 Ci (1) (1) (1) (1)
' Cobalt -60 Ci (1) (1) 8.47E-03 4.82E-03
..-- . j Zinc -65 Ci (1) (1) (1) (1)
Strontium . 89 Ci (1) (1) 3.28E-03 1.16E-03 l Strontium -90 Ci (1) (1) 2.93E-04 2.12E-04 l Strontium -92 Ci (1) (1) (1) (1)
Niobium -95 Ci (1) (1) 2.85E-04 1.78E-03 Niobium -97 Ci (1) (1) 1.41E-04 1.105-03 Zirconium -95 Ci (1) (1) (1) 8.95E-M Molybdenum -99 Ci (1) (1,_ (1) (1)
Technetium -99m Ci '(1) (1) 5.72E-04 3.05E-04 Ruthenium -106 Ci (1) (1) - (1) (1)
Silver -110m Ci (1) (1) 5.82E-03 1.92E-03 Tin -113 Ci (1) (1, (1) (1)
Antimony -122 Ci (1) (1) 3.71 E-05 6.04E-06 Antimony -125 Ci (1) (1) 1.39E-02 1.63E-05 Technetium -132 Ci .(1) (1) (1) (1) 15
. . _ .__ _ . _ _-. . .-. ..- _ _- -. ~ , _ _ . . . . . _ . . .
TAllLE 211 - REG GUIDE 1.21 (Cont.)
CAINERT CLIFFS NUCLEAR POWER PLANT EFFLUENTAND WASTE DISPOSAL SEMI ANNUAL REPORT SECOND IIALF- 1991 LIOUID EFFIcUENTS CONTINUOUS A10DE IIATCII hlODE 3RD 4TII 3RD 4Til NUCLIDES RELEASED UNITS QUARTER QUARTER QUARTER QUARTER 3
- Iodine -
131 Ci (1) (1) 1.85E 1.71E-02 Iodine - 132 Ci (1) (1) (1) 8.29E-06 Iodine - 133 Ci (1) 1.82E-02
, (1) 1.93E-03 Iodine. -135 Ci 1.86E-04 (1)- (1) (1)
- Cesium -
134 ' CI 9.42E (1) (1) 1.89E-02
-Cesiun. -
136- - Ci (1) (1) (1) 1.12E-05 Cesium - - 137 Ci 4.06E-01 (1) (1) 3.82E-02
--Barium -140 Ci 1.33E-03 (1) (1) (1)
{ Lanthanum - -140 Ci (1) (1) 1.67E-03 - 5.25E-04 Cerium - -144 Ci 1.87E-04 (1) - (1) (1)_
Tungsten --187 Ci (1) 2.21 E (1)
(1)
Total For Period - Ci (1) 5.50E-01 (1)' 1.44E-01 l.
. Xenon- -
131m Ci (1) __- (1) (1) (1)
-Xenon- -133- Ci (1) 2.85E-02
!' -(1) 1.18E '
Xenon -
133m .Ci (1)- (1) _(1) 1.50E-03 '
-Xenon -135- Ci (1) 9.46E (1) 7.37E ___
. Xenon- - - 135m - Ci (1) (1) (1) (1)-
Total For Period Ci- (1) . 2.95E-02 (1) 1.76E-01 1
<~
16
_. . _ _ . - ~ -_ - . _ _ _ . , , . .-__ 4 w ,
TAllLE 2H - REG.fdIIDE 1.21 (Cont.)
CALVERT CLIFFS NUCLEAR Pt 'WER FLANT EFFLUENT AND WASTE DISPOSAL SEMI ANNUAL REPORT SECOND IIALF- 1991
^
LIOUID EFFLUENTS NOTES TO TAllLE 211 (1) Less than minimum detectable activity which meets tLe LLD requirements of Technical Specification Surveillance Requirement 4.11.1.1.1.
a w d
i 17 -
_ - .. - . - _ ~ . . - - -.
, TAllLE 3A CALVERT CLIFFS NUCLEAR POWER PLANT EFFLUENT AND WASTE DISPOSAL SEMI ANNUAL REPORT SECOND1IALF 1991 SOLID WASTE AND IRRADIATED FUEL SIIIPMENTS A. - SOLID WASTE SIIIPPED_ OFFSITE FOR IlURIAL OR DISPOSAL (NOT IRRADIATED FUEL) 6 MONT11 EST. TOTAL
- 1. Type of Waste UNITS PERIOD ERROR %
- a. Dewatered spent resin m3 6.81 E +00 Ci 5.00E+01 i2.00E+01 l
- b. Dry Compressible Waste (Burial) 3 m 7.01E+01 Contaminated Equipruent, etc. 1.32E+01 Cj 5.00E+01 (Prior to Compaction) m 5.40E +02
- c. Irradiated Components, m3 6.20E-01 Control Rods, etc. Ci 4.32E+03 5.00E+01
- d. Other (CVCS Filters) m3 .
Ci -
i2.00E+01 2.
Estimate of Major Nuclide2 (By Type of Waste - Only nuclides > l % are reported)
- a. Iron -55 4.55E+00 %
- Cobalt -58 1.55E+00 % -
Cobalt -60 2.95E+00 %
Nickel -63 1.06E+01 %
Antimony -125 1.10E+00 %
Cesium -134 L96E+01 %
Cesium -137 5.56E+01 %
- b. Carbon -14 2.05E+00 %
Chromium -51 9.62E+00 %
Iron -55 3 #5E+01 %
Cobalt -53 1.52E+00 %
Cobalt -60 1.01E+01 ~5 Nickel -63 1.31E+01 %
Ruthenium -106 2.52E+00 %
Silver -110 1.41 E +00 %
Antimony -125 4.75E+00 %
Cesium -134 2.70E+00 %
Cesium -137 1.07E+01 %
- c. Manganese -54 1.20E+00 %
Iron -55 5.66E+01 %
Cobalt 3.80E+01 %
Nickel -63 4.00E+00 %
18
- z. - _. __ _ _ _ _ _ - .
., APPENDIX 11
SUMMARY
OF CIIANGES TO TIIE CCNPP ODCM SECOND IIALF 1991 u
CIIANGES TO TIIE CCNPP ODCM IN SECOND IIALF 1991
SUMMARY
AND IIASIS The Calvert Cliffs Offsite Dase Cale lation Manual (ODCM) is contained in the Chemistry Procedure CP.607. Chnages to this document are controlled through 6e normal procedure change review and . approval process. This process meets -the requirements of CCNPP Technical Specification 6.17.
One change was made to the ODCM during the second ha'f of the year 1991. The change was l reviewed by the Plant Operations and Safety Review Committee (POSRC) and approved by the
- Plant General Manager, Calvert Cliffs Nuclear Power Plant, prior to implementation. Change bars are provided in the right margin of the ODCM text to identify the changes made.
l
' The change was reviewed and approved on September 16,1991, and designated as change 91-155 l This change was made to describe an erwironmental sampling location in better detail.
i l
l
[~
i E
B-1 1_
- .