ML20091L211

From kanterella
Jump to navigation Jump to search
NPDES Noncompliance Notification:On 820106,backup Sample Confirmed Ph of 9.1.Caused by High Ammonia Concentration in Yard Oil Interceptor.No Direct Cause Could Be Found. Investigation Continuing
ML20091L211
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 02/25/1982
From: Russell L
BALTIMORE GAS & ELECTRIC CO.
To: Parise R
MARYLAND, STATE OF
Shared Package
ML20091K978 List:
References
NUDOCS 9201270316
Download: ML20091L211 (2)


Text

- na sw y:

m_-

3:m y-

- ~ + --- -m

.; f
  • x -a

~ ff<:

B ALTIMORE G ASTAND ELECTRIC COMPANY-P.Ol BO X 14 7 5

'N" B A LTIM OR E. M A RYL. A N D 21203 c-4 4

NUC1.E AR PCWER DEPARTMENT :

j CALvtRT CLIFO NUCLEAR POWER PLANT M

1LUS$Y,WARYLAND 2HS7 : '

y f Febraary 25? 1982 m

Division of-Severage.

1Inspectionnand Compliance Program Office of'EnviEonmental: Programs,; Room 2Ah.

4

'201 West Preston Street

. Baltimore, Maryland :21201l Attention: _ Mr. Ronald Parise Re

' Letter.of-January 11, 1982-._

nr regarding Maryland State. Dis--_

charge Permit Fo. Th-DP-0187A -

and NPDES Permit No. ' MD 0002399,

Dear Mr. Parise:

C-

" Positive results have come from our continuing investigation of the_ n(n-compliance-of..Jr.iuar/'.6,.1982.; Your records should show a phone: report

-1

_.of_ the January "'. 'd event and confirmsticn: this event ' fellLinto -the -

' ? category 'of contin %as investigation from' the January 26,1982 noncompliance.

. p

' The attached Calvert Cliffs'!! vent-Report: explcins the noncompliance. cause :

N fand Trorrective: action tt. ken.

Our' records indhate no further recurrencei.

. therefore,4-this item can,bt closedLout.:

m.

- Veryl truly yours...

MNuwg

?L.;Bs Russell:

1 Plant Superintendent i LER/RES/feb.

Kl.ttachmeat '

l

\\

iz:

r t

t

..y;

~ -9201270316-920116 PDRr ADOCK 05000317

_g.

PDR

+

}k_:_,

+

e,

f mti

%[2

[

6 1

3 g...

B ALTIMORE G AS AND ELECTRIC COMP ANY P.0, BO X 1475 B A LTIM O R E, M A R Y L A P4 D 21203 HUCLEAR POWER DEPARTMENT COLVERf cLirF; NUCLEAR POWE R PL ANT LWlDY. W ARYL AND 20657 J anuary 11, 1982 Division of Severar*

Inspection and Complaunce Program Office of Environmental' Programa, Room 2AL 201 West Preston Street Baltimore, Maryland 21201 Attention:

Mr. Ronald Parise Ee: Maryland State Diccharge Fermit ho. Th-DP-0187A aM NPDES Permit No. MD 0002399 Dear Mr. Parine.

At 1600 hours0.0185 days <br />0.444 hours <br />0.00265 weeks <br />6.088e-4 months <br /> on January 6,1982, a backup sample was drawn from outfall.

002 of the Calvert Cliffs Nuclear Fover Plant, h confirmed a pH of 91, above the con:pliance limit of 9 0.

This. condition existed until 0800 hours0.00926 days <br />0.222 hours <br />0.00132 weeks <br />3.044e-4 months <br />

. on Januan 7,1982 when the pH vas found to be 8.2.

A report of this

. incident was verbally transmitted to your office on January 7, 3982 and this is the required written report.

The noncompliance was found to be a result-of a high ar=onia concentration in the yard oil interceptor, a major contributor to the flow frotn outfall 002.

Though ammonia is used extensively for pH control of the nteam system at.Calvert Cliffe, no direct cause of high smmonia in the yard oil inter-ceptor could be found.

An investigation for possible causes is continuing thcugh, with the noncompliance no longer occurring, little success is expect ed.

Very tr21y yours,

LLWY L. B. Russell Plant Superintendent LBR/GEB/feb h

i

.