ML20091L142
| ML20091L142 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 04/24/1984 |
| From: | Russell L BALTIMORE GAS & ELECTRIC CO. |
| To: | Schmidt B MARYLAND, STATE OF |
| Shared Package | |
| ML20091K978 | List:
|
| References | |
| NUDOCS 9201270281 | |
| Download: ML20091L142 (1) | |
Text
"I B ALTIMORE G AS AND ELECTRIC COMPANY P.o. sox i 4 7 s B ALTIMOR c. M A R YL AN D 212o3 NUCLE AR PowtR DEPARTutNT cQLvERT CLiral NUCLE AR PQnER PL ANT LUS$Y, M ARYL A ND 20887 April 24, 1984 OfficeofEnviro)mentalPrograms
' Waste Management Administration 201 West Preston Street Baltimore, Maryland 21201 1
Attention:
Mr. Barry Schmidt Ret Maryland State Discharge Permit No. 79-DP-0187 and NPDES Permit No. HD.
0002399
Dear Hr. Schmidt:
1 On January 30 and 31 the effluent pH analysis from outfall 101 (Sewage Treatment Plant)-showed values below the NPDES specification of 6.0 for total period of 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />.
Values are as follows:
Date Sample Location g
1/29/84 Aeration Tank 6.3 Plant Effluent 6.4 1/30/84 Aeration Tank 4.6 4
Plant Effluent 5.2 1/31/84 Aeration Tank 4.5 Plant Effluent 5.1
-2/1/84 Aeration Tank 5.8 Plant Effluent 6.4 t
Except for realizing an acidic solution was introduced to the plant, the actual cause of the pH vas not determined. Lima additions were made to increase pH in a manner as to not reshock the plant.
Emphasis has been placed on the proper deposal of liquid waste 9 at-the plant.
This noncompliance was reported via telephone to your office on April 23, 1984.
Should you have questions regarding this information, please feel free to call.
Very truly yours.-
41.4Y L. B. Russell Plant Superintendent LBR/ bad 9201270281 920116 PDR ADOCK 05000317 6
PDR l
I L'
__ -.