NPDES Noncompliance Notification:On 890412,electrical Control Relay Did Not Energize Which Controls Operation of Wet Well Pumps Via Air Compressor & Pressure Bubbler Sys. Engineering Dept Designing Back Up Control Sys
ML20091L085
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 04/19/1989
From: Sears B
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20091K978 List:
References
NUDOCS 9201270258
Download: ML20091L085 (2)


Text

'

\

o .= l k3ALTIMORE 1 OAs AND ELECTRIC ]

I CHARLES CENTER e P.O. 80X 1475 . BALTIMORE. MARYLAND 21203 une cues uman coma num www,n April 19, 1989 anos o.nes uman coen eum Luter, enAnvuwe soon Regional Administrator -i

-Region I l

U.S. Nuclear Regulatory Commission '

C/5-Allendale Road K1ng of Prussia, Pennsylvania 19406 SUBJECT Electrical control Relay did not Energize the  !

Operation of Wet Well Pumps, April 12, 1989 1

Dear Sirs /Hadames:

Attached you will' find a copy of-the letter to the State of Maryland descr.aing.a non-compliance electrical control relay event-at Calvert Cliffs Nuclear Power Plant which-occurred on April ~12, 1989. ~

We are required-by our NPDES pennit for Calvert Cliffs to report to.the State any non-compliance event.

If you ha.ve-any questions regarding ' . 'ched, please call me at.(301) 260-4905.

Sincerely,

} -

B. Frank Sears Supervisor, Water Treatment Lcc: Document-~ Control Desk y -V. L.-Pritchett 1

e 2

9201270258 920116 '

PDR ADOCK 05000317 .

, ,6 - PDR ._

igg #- y y- _. +

I ,

CALTIMORE OASAND ELECTRIC CHARLES CENTER e P.O. BOX 1475 . BAlilMORE, MARYLAND 21203

. wwn currs .arasia eowin etawe evaeusut APYIl 19r 1989 c=wnicuerswetaaneoniaetAur W99f,6tANYtAwD 8etti Mr. John Beazley '

Maryland Department _of Environment 2500 Broening Highway Baltimore, Maryland 21224

Dear Mr. Beazley:

This-letter _is to inform you of a non-compliance at Calvert Cliffs Nuclear Power Plant.

On April 12, 1983 at approximately.6:00 p.m. an electrical control relay did not energize which controls the operation of_the wet-well pumps via'an air compressor _and pressure bubbler-system.

These_ pumps lift raw sewage from a wet well to the sewage treatment plant, outfall point 101. .The air bubbler system also act.vates the high level alarm on the-wet well,-so it also was inoperable.

Tho'wetLwell overflowed to a screen back wash channel where bay water returns to the bay at a rate of approximately 700 gpm. It is estimated'that--12,000 to.14,000 gallons of sewage by passed the sewage treatment plant. The problem was corrected ~at 8:00 a.m.,-

April 13, 1989.

No impact upon the receiving saters was observed or is expected.

Temporarily,'we have cross-connected to have other air compressors maintain. pressure for the bubbler control. system. Our engineering department is currently designing a back.up control system to prevent recurrence of'this'non-compliance.

Mr.- Frank Ciurca was at the plant on April 13, 1989 for a-routine inspection. Enclosed-is a copy of his report.

If you have any-questions r4garding this information, please H feel _ free to call. me ak (301) .260-4905.

Sincerely,

=rd

[

B. Frank ars Supervisor, Water Treatmenc BFS:dag D Enclosure s