NPDES Noncompliance Notification:On 890412,electrical Control Relay Did Not Energize Which Controls Operation of Wet Well Pumps Via Air Compressor & Pressure Bubbler Sys. Engineering Dept Designing Back Up Control Sys
ML20091L085
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 04/19/1989
From: Sears B
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20091K978 List:
References
NUDOCS 9201270258
Download: ML20091L085 (2)


Text

',

\\

l o.=

k3ALTIMORE 1

OAs AND ELECTRIC

]

CHARLES CENTER e P.O. 80X 1475. BALTIMORE. MARYLAND 21203 April 19, 1989 une cues uman coma num www,n anos o.nes uman coen eum Luter, enAnvuwe soon Regional Administrator

- i

-Region I l

U.S. Nuclear Regulatory Commission C/5-Allendale Road K1ng of Prussia, Pennsylvania 19406 SUBJECT Electrical control Relay did not Energize the Operation of Wet Well Pumps, April 12, 1989 1

Dear Sirs /Hadames:

Attached you will' find a copy of-the letter to the State of Maryland descr.aing.a non-compliance electrical control relay event-at Calvert Cliffs Nuclear Power Plant which-occurred on April ~12, 1989.

We are required-by our NPDES pennit for Calvert Cliffs to report to.the State any

~

non-compliance event.

If you ha.ve-any questions regarding '

'ched, please call me at.(301) 260-4905.

Sincerely,

}

B.

Frank Sears Supervisor, Water Treatment Lcc:

Document-~ Control Desk

-V.

L.-Pritchett y

1 e

2 9201270258 920116 PDR ADOCK 05000317

,6

- PDR s-wm e

s-e----

r e

War 1.-

igg #-

y y-

_. +

I CALTIMORE OASAND ELECTRIC CHARLES CENTER e P.O. BOX 1475. BAlilMORE, MARYLAND 21203 APYIl 19r 1989

. wwn currs.arasia eowin etawe evaeusut c=wnicuerswetaaneoniaetAur W99f,6tANYtAwD 8etti Mr. John Beazley Maryland Department _of Environment 2500 Broening Highway Baltimore, Maryland 21224

Dear Mr. Beazley:

This-letter _is to inform you of a non-compliance at Calvert Cliffs Nuclear Power Plant.

On April 12, 1983 at approximately.6:00 p.m. an electrical control relay did not energize which controls the operation of_the wet-well pumps via'an air compressor _and pressure bubbler-system.

These_ pumps lift raw sewage from a wet well to the sewage treatment plant, outfall point 101.

.The air bubbler system also act.vates the high level alarm on the-wet well,-so it also was inoperable.

Tho'wetLwell overflowed to a screen back wash channel where bay water returns to the bay at a rate of approximately 700 gpm.

It is estimated'that--12,000 to.14,000 gallons of sewage by passed the sewage treatment plant.

The problem was corrected ~at 8:00 a.m.,-

April 13, 1989.

No impact upon the receiving saters was observed or is expected.

Temporarily,'we have cross-connected to have other air compressors maintain. pressure for the bubbler control. system.

Our engineering department is currently designing a back.up control system to prevent recurrence of'this'non-compliance.

Mr.- Frank Ciurca was at the plant on April 13, 1989 for a-routine inspection.

Enclosed-is a copy of his report.

If you have any-questions r4garding this information, please H

feel _ free to call. me ak (301).260-4905.

Sincerely,

=rd

[

B. Frank ars Supervisor, Water Treatmenc BFS:dag D

Enclosure s

I'

+---fr m.

_