Responds to NRC 830725 Ltr Re Violations Noted in IE Insp Rept 50-382/83-21.Corrective Actions:Change to Procedure MM-8-014 Implemented to Address New Stud Installation/ Removal Tool.Maint Supervisors Instructed
ML20085J649
Person / Time
Site: Waterford Entergy icon.png
Issue date: 08/24/1983
From: Drummond F
LOUISIANA POWER & LIGHT CO.
To: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20085J642 List:
References
W3I83-0287, W3I83-287, NUDOCS 8310130266
Download: ML20085J649 (2)


Text

e J

LOUISIANA f 242 ouAnoNoe stater POWE R & LIG H T/ P O 00X 6008

  • NEW ORLEANS. LOUISIANA 70174 * [504) 366-234S

$uSYsEvNU August 24, 1983 W3I83-0287 Q-3-A35.02.01 Q-3-A20.27 Mr. G. L. Madsen, Chief Reactor Projects Branch 1, Region IV U.S. Nuclear Regulatory Commission g=3 ]

611 Ryan Plaza Drive, Suite 1000 7)?

'g I i Arlington, Texas 76012 AM 4 E 3 0 883 f

Dear Mr. Madsen:

g\_ !

D\ 1

SUBJECT:

Waterford 3 SES USNRC Inspection Report 50-382/83-21 In accordance with the provisions of Section 2.201 of the NRC's " Rules of Practice", Part 2, Title 10, Code of Federal Regulations, the following information regarding the Notice of Violation identified in Inspection Report 50-382/83-21 dated July 25, 1983 is hereby submitted:

VIOLATION

" Failure to Follow Procedure for Reactor Vessel Stud Removal Criterion V of 10 CFR 50, Appendix B, requires that activities affecting quality shall be prescribed by documented instructions, procedures, or drawings and shall be accomplished in accordance with these instructions, procedures, or drawings.

Louisiana Power & Light Company Plant Operating Manual Procedure MM-8-014, Revision 0, " Reactor Vessel Head Stud Removal," paragraph 8.5, directs the specific use of a stud wrench and other tools supplied by Combustion Engineering, Inc., for stud removal.

Contrary to the above, on June 7, 1983, the NRC inspector observed stud removal performed with Diamond Power Specialty Corp. air-powered stud handling tools rather than the Combustion Engineering tools that are specifically designated in Procedure MM-8-014, Revision 0. There was no temporary procedural change made to accommodate deviation from the established procedure.

This is a Severity Level V Violation. (Supplement II.E) (382/8321-01)"

8310130266 G31006 PDR ADOCK 05000382 G PDR J

I 4

4 e y .-

Mr. G. L. Madsen W3I83-0287 Page 2

RESPONSE

The following response is provided for Violation 50-382/83-21-01.

Corrective Action Taken and Results Achieved:

A procedure change to MM-8-014 was implemented to address the new stud installation / removal tool.

Corrective Steps Which Will Be Taken To Avoid Further Violations:  ;

1 Maintenance supervisors have been indoctrinated that activities affecting f quality shall be prescribed by documented instructions, procedures, or I drawings of a type appropriate to the circumstances and shall be ,

accomplished in accordance with these instructions, procedures, or drawings.  !

l Date When Corrective Action Will Be Completed:

Full compliance was achieved August 22, 1983.

If further information is required for this matter, please do not hesitate to contact ms. j Yours ve truly, W

F. J. Drummond l Project Support Manager-Nuclear FJD:CNH:SSTG cc: E. L. Blake, W. M. Stevenson, J. Wilson (NRC)

,