Forwards Rev 0 to Topical Rept NFSR-0081, Comm Ed Topical Rept on Benchmark of PWR Nuclear Design Methods Using PHOENIX-P & Advanced Nodal Code (Anc) Computer Codes, in Support of Implementation of PHOENIX-P & Anc
ML20044A962
Person / Time
Site: Byron, Braidwood  Constellation icon.png
Issue date: 07/13/1990
From: Silady J
COMMONWEALTH EDISON CO.
To: Murley T
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
Shared Package
ML20044A963 List:
References
NUDOCS 9007170090
Download: ML20044A962 (3)


Text

__

7x x / Commonwealth Edison -

') 1490 Opus' Place * .

g* .(

~'

) Down:rs Crtve, Illinois 60515 Ad i

b

-h July 13, 1990 Dr. Thomas E.-Murley Office of Nuclear Reactor Regulation ,

U.S. Nuclear Regulatory Commission Washington, D.C. 20555 l ATTN: USNRC DOCUMENT CONTROL DESK l

Subject:

Braidwood Nuclear Power Station Unit 1 ,

Byron Nuclear Power Station Unit 2 Submittal of. Topical Report for Transition in Net'tronics Codes for PHR Reload Design NRC D"cket Nos. 50-456 and 50-455

References:

(a) " Transition in Neutronics Codes.for PHR Reload i Design", CECO letter from J.A. S11ady to L T.E. Murley, dated February 21, 1990.

(b) " Commonwealth Edison Company Topical Report on Benchmark of PHR Nuclear Design Methods Using  :

the PH0ENIX-P and ANC Computer Codes", Ceco '

report NFSR-0081, D.K. Lee et al., dated .l July, 1990. l l

(c) June 26, 1990 conference call between CECO  !

(J.A. Silady and-B.J. Adams) and NRR (D.B. Fieno). 1 l

Dr. Murley:

As described in Reference (a), Commonwealth Edison Company (CECO) is planning to implement the NRC-approved Westinghouse Codes PHOENIX-P and ANC to

~

replace the existing ARK and 2D codes which CECO uses to perform neutronic.

analyses for PHR reload designs. Enclosed is the CECO Topical Report, Reference (b)',.in support of the implementation of PH0ENIX-P and ANC.

As' stated in Reference (a), the new codes are expected to be first -

used for reload design applications in December, 1990.for the Braldwood Unit 1 i L Cycle 3 (BHIC3) design. In addition, as discussed in the Reference (c) l h conference call, CECO plans to use the new codes for the curvebook and nuclear q J design report calculations for Byron Unit 2 Cycle 3 (BY2C3), which is L scheduled to start up in November of 1990. The actual relot.d design for i BY2C3, however, has been determined using the standard ARK and 20 codes.

l f 9007170090 900713 y fDR ADOC'K 0500 5 lgg yg .gf n i, ' 1 .

'l

.-..'o ///:

Dr. Thomas-E. Murley July 13, 1990 Use of the new codes for the BY2C3 curvebook and nuclear design report portion of the analyses will take advantage of the three dimensional capabilities of PHOENIX-P/ANC. These enhanced calculations should benefit the station in reactivity management areas such as the prediction of the Estimated Critical Condition (ECC). BWIC3, however, is still-the first cycle for which CECO _ intends to use the new codes for all phases of a reload design. The_new codes would then be used for later cycles at Byron, Braidwood, and Zion.

l- The Attachment shows an updated version of the Proposed CECO

, PHOENIX-P/ANC Topical Submittal Schedule transmitted to you in Reference (a).

It is our understanding that' issuance of an SER concurring with CECO use of PHOENIX-P/ANC is necessary prior to the full scope BHIC3 application (12/90) but optional prior to the use of the limited BY2C3 application (11/90).

Please contact this office if this understanding is incorrect or j should further information be required.

i l

Wry truly yours, l

l L J.A. Silady q Nuclear Licensing Administrator l

l- l Attachment j i

Updated Proposed CECO PHOENIX-P/ANC Topical Submittal Schedule cc: A.B. Davis - Regional Administrator, RIII (w/att) l C.P. Patel - Zion Project Manager, NRR (w/att) i S.P. Sands - Braidwood Project Manager, NRR (w/att)

P.C. Sheinanski - Byron Project Manager, NRR (w/att) j R.C. Jones - Reactor Systems Branch Chief, NRR (w/att) i Senior Resident Inspector - Zion (w/o/att) j Senior Resident Inspector - Byron (w/o/att)  !

Senior Resident Inspector - Braidwood (w/o/att) ,

ZNLD/ID100/ tim l

2

1 f:

4 g 9

.; g .

ATTACHNIEi 1

UPDATED CECO PHOENIX-P/ANC TOPICAL SUBMITTAL SCHEDULE EVENT MIE Initial Discussion of CECO Plans with NRR 10/20/89*

CECO Discusses PHOENIX-P/ANC Topical Scope 01/10/90* j l

CECO Discusses Curvebook/ Nuclear Design Report 06/26/90* I Use of PHOENIX-P/ANC for Byron Unit 2 Cycle 3 j

-CECO Submits PHOENIX-P/ANC Topical to NRC 07/15/90* 1 1

Heeting(s) to Address Staff Questions To be scheduled I as needed CECO use of PH0ENIX-P/ANC for Curvebook/ 11/01/90 Nuclear Design Report Calculations

-(Byron Unit 2 Cycle 3)

First Ceco Use of PH0ENIX-P/ANC For a 12/15/90 Complete Reload Design (Braidwood Unit 1 Cycle 3)

- Action Completed i