Submits Status Rept of Deficiency 7 Re Loose Control Element Drive Mechanism Guide Cones.Work Inside Reactor Containment Bldg Rescheduled for Last Quarter of 1979.Guide Cones Will Be Corrected at That Time & Final Rept Issued
ML19250A626
Person / Time
Site: Waterford Entergy icon.png
Issue date: 08/31/1979
From: Aswell D
LOUISIANA POWER & LIGHT CO.
To: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
LPL-11905, NUDOCS 7910240088
Download: ML19250A626 (1)


Text

. 72c 2

LOUISIANA f 24a OumoNoe smrcr POW E R & L1G H T/ P O DOX 6009

  • NEW ORLEANS. LOUISIANA 70174 * (504) 366 2345 Ut?0?!51sN!rU August 31, 1979 o t a3wett

'J ce bvsident Power P udoct.on LPL 11905 Q-3-A35.07.07 3-A1.01.04 Mr. K. V. Seyfrit, Director, Region IV U. S. Nuc1 car Regulatory Commission Office of Inspection and Enforcement 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76012

SUBJECT:

Waterford SES Unit 3 Docket No. 50-382 Status Report of Significant Construction Defic *nney No. 7

" Loose Control Elemeat Drive Mechanism Guide Cones"

REFERENCE:

LP&L Letter LPL 9582 dated September 12, 1978 Dear Mr. Seyfrit-In accordance with the requirements of 10CFR50.55(e), the referenced letter sub-mitted an Interim Report of Significant Construction Deficiency No. 7, " Loose Control Element Prive Mechanism Guide Cones." The referenced letter also indi-cated a planned completion date of Septem'wr 1, 1979, for corrective action.

Since the issuance of the referenced letter, the work schedule within the Reactor Containment Building has been resequenced. Work is now scheduled to begin on the reactor vessel closure lead during the last quarter of 1979.

The Control Element Drive Mechanism guide cones will be corrected as specified in the interim report during this period. The final report will be forwarded by December 31, 1979.

Yours very truly, D. L. Aswell DLA:TFG: sad i202 285 791024 o c]E;is

Mr. K. V. Seyf rit 2 August 31, 1979 cc: 1) Director Of fice of Inspect ion & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555

2) Director Office of Management Information & Program Control U. S. Nuclear Regulatory Commission Washington, D. C. 20555 1202 286

_