Submits Supplemental Response to IE Bulletin 80-23, Failures of Valves Mfg by Valcor Engineering Corp. Valcor Solenoid Valves Returned to Manufacturer for Defective Part Replacement.Coil Replacement Completion Scheduled by 811001
ML19350E600
Person / Time
Site: Byron, Braidwood  Constellation icon.png
Issue date: 06/17/1981
From: Swartz E
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
IEB-80-23, NUDOCS 8106230326
Download: ML19350E600 (1)


Text

Commonwealth Edison i One First National Plaza, Chicago, lilir.0:s s

9]'y g,.

Address Reply to: Post Office Box 767 Chicago, lilinois 60690 ,

June 17, 1981 p Mr. James.G. Keppler, Director -

D Directorate of Inspection and .: .

d I h:_' i

Enforcement - Region III el ,.;' ~ ~

--i '

l U.S. Nuclear Regulatory Commission f #'W,;poa j 799 Roosevelt Road k%, N Glen Ellyn, IL 60137

Subject:

Byron Station Units 1 and 2 i Braidwood Station Units I and 2 Supplemental Response to IE Bulletin 80-23

" Failures of Solenoid Valves Manufactured By Valcor Engineering Corporation" NRC Docket Nos. 50-454/455 and 50-456/457-References (a): T. J. Rausch letter to J. G. Keppler dated February 11, 1981 (b): T. J. Rausch letter to J. G. Keppler dated April 16, 1981

Dear Mr. Keppler:

Commonwealth Edison Company p,rovided in Reference (a) our response to IE Bulletin 80-23 for Byron Units 1 and 2 and Braidwood Units *1 and 2. In that response we indicated our intent to replace certain Valcor soleno'id valve coils at these stations and that our schedule was to have replacement completed by April 16, 1981.

Subsequently, Reference (b) advised you that our expected replacement completion date would be June, 1981.

This letter is to advise you that the Valcor solenoid valves have been returned to Valcor to have the defective coils replaced. Due to vendor sc'heduling problems, our expected schedule for coil replacement completion is now October 1, 1981.

Please address any questions you may have concerning this matter to this office.

Very truly yours, E. Douglas Swartz Nuclear Licensing Administrator cc: D i r e c t o r', Division of Reactor Operations Inspection 2177N g5d 63 0 81 os 23o 3Qf JUN 181981