ML20054G722

From kanterella
Revision as of 11:46, 14 November 2023 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Suppls Util Responding to NRC Re Violation Noted in IE Insp Repts 50-424/82-05 & 50-425/82-05.Violation Contested,Based on Findings of Addl Insp Effort
ML20054G722
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 05/21/1982
From: Foster D
GEORGIA POWER CO.
To: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20054G719 List:
References
GN-173, NUDOCS 8206220240
Download: ML20054G722 (2)


Text

  • o

~

e Georgia Power Company t;3NRC REG'3N Post Offee Box 4545 * ~ ! MII2* . C EC *DI A At:anta, Georgia 30302 Telephone 404 522-6060 82 MAY 25 AS: 0 Vogtle Proj.ect Southern Company Services, Inc.

Post Offee Box 2625 Birmingham, Alabama 35202 Telephone 205 870-6011 May 21, 1982 United States Nuclear Regulatory Commission Office of Inspection and Enforcement Region II - Suite 3100 101 Marietta Street File: X78G10 Atlanta, Georgia 30303 Log: GN-173

Reference:

ID: II:

50-424/82-05 50-425/82-05 Attention: F. J. Long The Georgia Power Company wishes to submit the following additional infomation to our April 26, 1982 response to your inspection report 50-424/82-05 and 50-425/82-05.

During Mr. Kleinsorges's inspection, Georgia Power Company's initial response was that the affected weld was not acceptable. After Mr. Kleinsorge's inspection and further investigation of specification requirements, a thorough inspection of the cited weld was conducted by a team of qualified visual welding inspectors. As a result of this additional inspection effort, we do not concur with the finding identified concerning " Failure to Follow Inspection Procedures".

This response contains no proprietary infomation and may be placed in the NRC Public Docuemtn Room upon receipt.

Yours truly,

. Y D. O. Foster Project General Manager DOF/CWH/tlp 1

8206220240 820610 PDR ADOCK 05000424 O PDR 3

.- a.

Mr. F. J. Long 50-424/82-05; 50-425/82-05 flay 21, 1982 Page 2 xc: U. S. fluclear Regulatory Commission Attn: Victor J. Stello, Jr. , Director Office of Inspection and Enforcement Washington, D. C. 20555 R. J. Kelly R. E. Conway G. F. Head J. T. Beckham, Jr.

J. H. Boykin D. E. Dutton R. H. Pinson -

D. L. McCrary R. A. Thomas J. A. Bailey

0. Batum
11. H. Gregory, III E. D. Groover L. T. Gucwa M. fialcom C. R. Miles , Jr.

ft, flanry R. W. Staffa J. L. Vota W. F. Sanders - Resident Inspector l

l l

I l

J