ML20054G729
| ML20054G729 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 03/31/1982 |
| From: | Long F NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Kelly R GEORGIA POWER CO. |
| Shared Package | |
| ML20054G719 | List: |
| References | |
| NUDOCS 8206220246 | |
| Download: ML20054G729 (2) | |
See also: IR 05000424/1982005
Text
'.
4
.
.
MAR 311982
Georgia Power Company
ATTN:
Mr. R. J. Kelly
Executive Vice President
P. O. Box 4545
Atlanta, GA 30302
Gentlemen:
Subject:
Report Nos
42 82-05 a d 50-425/82-05
This refers to the routine safety inspection conducted by Mr. W. P. Kleinsorge of
this office on March 9-12, 1982, of activities authorized by NRC Construction
Permit Nos. CPPR-108 and CPPR-109 for the Vogtle facility.
Our preliminary
findings were discussed with Mr. H. H. Gregory, III, Construction Project
Manager, at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
During the inspection, it was found that certain activities under your license
appear to violate NRC requirements.
This item and references to pertinent
requirements are listed in the Notice of Violation enclosed herewith as
Appendix A.
Elements to be included in your response are delineated in
Appendix A.
We have examined actions you have taken with regard to previously identified
enforcement matters and unresolved items. The status of these items is discussed
in the enclosed report.
Four new unresolved items are identified in the enclosed inspection report.
These items will be examined during subsequent inspections.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures will
be placed in the NRC's Public Document Room unless you notify this office, by
telephone, within ten days of the date of this letter and submit written appli-
cation to withhold information contained therein within thirty days of the date
of this letter.
Such application must be consistent with the requirements of
2.790(b)(1).
The responses directed by this letter and the enclosures are not subject to the
clearance procedures of the Office of Management and Budget as required by the
Paperwork Reduction Act of 1980, PL 96-511.
8206220246 820610
PDR ADOCK 05000424
G
l
.
Georgia Power Company
2
MAR 311982
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
F. J. Long, Acting Chief
Reactor Projects Branch 2
,
Division of Project and
Resident Programs
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-424/82-05
and 50-425/82-05
cc w/enci:
H. H. Gregory, III, Construction
Project Manager
E. D. Groover, QA Site Supervisor
D. O. Foster, Project General Manager
bcc w/ enc 1:
NRC Resident Inspector
Document Management Branch
State of Georgia
l'
V
jj_
Nieinso
ht
ARHerdt
FRogge
FJLgng
4
33 /82
3/c;/82
3 84/82
AWS2
-
z
-
---