| number = ML20141E506
| number = ML20141E506
| issue date = 06/24/1997
| issue date = 06/24/1997
| title = Rev 0 to CK-MP3-04-03A, Independent Corrective Action Verification Program (Icavp) Programmatic Review Checklist, Change Procedure Implementation Drawings
| title = Rev 0 to CK-MP3-04-03A, Independent Corrective Action Verification Program (ICAVP) Programmatic Review Checklist, Change Procedure Implementation Drawings
| author name = Caruso A, Ryan T
| author name = Caruso A, Ryan T
| author affiliation = NORTHEAST UTILITIES
| author affiliation = NORTHEAST UTILITIES

Latest revision as of 16:41, 24 August 2020

Rev 0 to CK-MP3-04-03A, Independent Corrective Action Verification Program (ICAVP) Programmatic Review Checklist, Change Procedure Implementation Drawings
ML20141E506
Person / Time
Site: Millstone Dominion icon.png
Issue date: 06/24/1997
From: Caruso A, Tom Ryan
NORTHEAST UTILITIES
To:
Shared Package
ML20141E505 List:
References
CK-MP3-04-03A, CK-MP3-4-3A, NUDOCS 9707010084
Download: ML20141E506 (3)


Text

_

.o . . . .. .. . . _ . . -

l. .

. -y ,

l l

Northeast Utilities Millstone - Unit 3

, Independent Corrective Action Verification Program (ICAVP) 1 Programmatic Review Checklist CK-MP3-04-03A Channe Procedure Imnlementation DRAWINGS Prepared by:

  • O 4 7 Name Signature 'Date Approved by: T &_b d!NI7 Name (/ Si ba{e ftf IMPLEMENTATION

~

Change Process: NUC DCM CHAPTER 7 DRAWINGS REVISION 5 Verified By: Date; i

l Concurrence By: Date:

l l

i (CK-MP344-43. Page 1) SHEET 1 of 3 C:\Mn5rONEEPIDCM7B, DOC 9707010084 970624

. Northeast Utilities CK-MP3-84-03A Millstone Unit 3 Change Process: Drawing Sheet 2 of 3 Change Process Review Checklist Programmatic Review Checklist CK-MP3-04-03A Channe Procedure Implementation Drawing:

i Change No.: Date ofRevision / Change:

1. Has the drawing been prepared in accordance with identified and controlled format -

requirements including drawing indicators and stamps?

! Yes No O N/A Comment

2. Has the drawing been reviewed and approved in accordance with documented procedures, and by personnel independent of the preparer?

Yes No N/A Comment

3. Has the drawing been subject to appropriate interdisciplinary review (both internal and external)?

Yes No N/A Comment l

4. Has the document control system been updated including appropriate design change notices?

Yes No N/A Comment

5. Have drawing changes been incorporated in accordance with established time requirements?

Yes No N/A Comment

6. Has the drawing material lists been prepared in accordance with the controlled format requirements?

Yes No N/A Comment (CK-MP34442. Rev.1. Page2)

C:\MnEroNECPIDCM7B, DOC

s Northeast Utilities CK-MP3-04-03A

  • Millstone Unit 3

, Change Process: Drawing Sheet 3 of 3 Change Process Review Checklist Change Procedure ImDiementation -DRAWINGS Comment Number comment l

I (CK-MP3-04-02. Rev.1. Page3)

CAMILSTONDCPIDCM7B, DOC