Rev 0 to CK-MP3-04-06, Independent Corrective Action Verification Program (ICAVP) Programmatic Review Checklist, Commercial Grade Dedication Packages
ML20141E570
Person / Time
Site: Millstone 
Issue date: 06/13/1997
From: Jerrica Johnson, Tom Ryan
NORTHEAST UTILITIES
To:
Shared Package
ML20141E505 List:
References
CK-MP3-04-06, CK-MP3-4-6, NUDOCS 9707010106
Download: ML20141E570 (5)


Text

_ _ _.

4 Northeast Utahties Mdistone-Unit 3

{

f% Corrective Actum Verification Program (ICAVP)

Pic i..--tic Review Nklin s

i CK-MP3-04-06, Rev. O i

C=-seist Grade Dedication Packages 4 M

- f. _m 6/j3/,7

/

Prepared by:

JAY W. JoW Name

@y Date '

g;,]3 7 Approved by:

m>

c-y N

Si D(te /

IMPLEMENTATION System CGD Package I&utification Verified by:

Date:

Concurrence bT Date:

1 9707010106 970627 PDR ADOCK 05000423 P

PDR

l Nfrtheast Utilities CK-MP3-04-06 Millstone Unit 3 CCD Package No.

Sheet of Commerrial Grade Dedication Package Checklist Instructions

'Ihis checklist is used to document the review of Commercial Grade Dedication (CGD) packages. The chkliet may be used to document the review of more than one CGD package, and shall be completed in accordance with the followmg instructions:

1. 'Ihe Veri 6er shall review the CGD package agamet each attribute listed on Pages 3 and 4 of the checklist. Multiples of Pages 3 and 4 may be used when more than one package is being considered.

j

2. 'Ibe Verifier shall indicate, for each attribute, whether the attribute is satisfactory (Y), unsatisfactory (N), or not applicable (NA).
3. 'Ibe Verifier shall assign a sequential comment number to isyc,sace indicated on Pages 3 and 4 which require clarification orjustification and shall use the Page 5 comment sheet to provide the comments. Multiple Page 5's may be used. 'Ihe justification shall reference the section of the CGD package reviewed for which the comment is applicable.

4.

Discrepancies shall be processed in accordance with PI-MP3-11.

5. The Verifier shall enter the CGD package number on each sheet, number the sheets sequentially, and sign and date the cover sheet. The sheet numbers shall be sequentially numbered (i.e.,1,2,3, etc.). It is acceptable to add insert pages (i.e., I A, IB. IC, etc.), if needed l
6. 'Ihe Verifier shall obtain the PRO Lead's concurrence on the cover sheet that the Ch. age Review has been adequately l

completed.

7. 'Ihe cover sheet and all applicable checklists and comnwnt forms shall be included in the final project file copy.

i l

l l

i k

4 I

(CK-MP3-04-06, Rev. O, Page 2) l

=

NM Utilities l '

o CK-MP34446 Mmaname Unit 3 CGD Package No.

Sheet of Comumential Grade Dedication Package ClwirHat l

A. GeneralRequutments

1. Does the package ident@ the applicaties in which use of the item is pennitted?

Yes O No O N/A O cma=* No.

(

2. Have the safety functmas of the item relative to its intended application been idenrirmt?

i Yes O No O N/A O C-a=* No.

3. Where the item is used in multiple, ddiertet applicatene, are the most sEL,.a functional goLwo-.i. addre l

Yes O No O N/A O C===* No.

4. Have the hov==i design, material and performance characteristics that have a dueet effect on the ite er perform its intended safety function been hirwi?

Yes O No O N/A O Comment No.

5. Will the critical characteristics selected for verification provide reasonable assurance that the item will pe intended safety function?

Yes O No O N/A O Comment No.

6. If the item is subject to the requirements of 10CFR50.49 regardag environn=*al quahficatim of electncal equipment in a harsh environment, has verificatim ofthe materials of constructim been included?

Yes O No O N/A O Comment No.

7. Does the package adequately address impact on the scismic qualification of the item? For complex items (assemblies of parts) verification of the manufacturers design controls, modifications to internal part charact and assembly procedures should be considered.

Yes O No O N/A O C-ment No.

8.

Is the aey re method chosen %+a to provide reasmable assurance that the dedicated item will perform its intended safety fum? ('ne acca*=aca methods typically used in ao.owdal grade dedication are (1) specia tests and inspections, (2) supplier program surveys, (3) source verification and (4) acceptable supplier / item performance records).

Yes O No O N/A O Comment No.

Completion of the following sections (B-E) depends on the acceptance method (s) chosen for verification of the selected critical characteristics. Indicate not applicable (N/A) if an acceptance method is not used in the CGD package.

(CK-MP3-04-06, Rev. O, Page 3)

/

4

  • Northeast Utilities CK-MP3-04-06 Mmmeane Unit 3 CGD Package No.

Sheet of Comansertial Grade Dedication Package Checklist B. Aw;. ace Method I, Special Tats and i==;-vF-:-v

1. Do the tests and iaW= specified for==3 :-- v W="ly venfy the eeM~t entical characteristics?

Yes O No O N/A O C===* No.

2. Does the sampling plan have adequate technical besis, considering lot tractability and homogeneity, complexity of the item, and adequacy of supplier controls?

Yes O No O N/A O C-==* No.

C. Aw,4== Method 2, Vendor Surveys

1. Are the supplier's c=-.

M quahty controls unposed in the procurement A 2 -?

Yes O No O N/A O C-==* No.

2. Are the critical characteristics of the item controlled under the scope of the suppliers commercial quahty program, as <Mi=~*~i in a c=--,.2 survey report?

Yes O No O N/A O C-==* No.

D. A ;*== Method 3, Source Verification

1. Does the source verificabon involve witnessing the supplier f fviming quality activities on the actualitems bdas procured?

Yes O No O N/A O C==a* No.

2. Does the source verification adequately verify the item's critical characteristics?

Yes O No O N/A O Comment No.

3. Were appropriate hold points i==~i to allow verificatior. af critical characteristics that cannot be verified after the item has been completely manufactured?

Yes O No O N/A O Comment No.

E. Acyi.oce Method 4, Acceptable Supplier / Item Performance Record

1. Is the historical record based on industry-wide performance data that is directly applicable to the item's critical characteristics and safety-related application?

Yes O No O N/A O C-ment No.

(CK-MP3-04-06, Rev. O, Page 4)

)

.J Northeast Utilities

' MAllsteme Unit 3

  1. N CGD Package No.

Comunettial Grah Dedication Package Checklist i

Comment No.

Comment i

)

i 2

i Prepared by Signature Date (CK-MP3-04-06, Rev. O, Page 5)

~

/