Rev 0 to CK-MP3-04-03B, Independent Corrective Action Verification Program (ICAVP) Programmatic Review Checklist, Change Procedure Implementation Specs
ML20141E522
Person / Time
Site: Millstone Dominion icon.png
Issue date: 06/24/1997
From: Caruso A, Tom Ryan
NORTHEAST UTILITIES
To:
Shared Package
ML20141E505 List:
References
CK-MP3-04-03B, CK-MP3-4-3B, NUDOCS 9707010086
Download: ML20141E522 (4)


Text

.

i .- ,

l 0.

i

, Northeast Utilities ..

I Millstone- Unit 3 l

l Independent Corrective Action Verification Program (ICAVP)

I Programmatic Review Checklist I CK-MP3-04-03B Change.P_ror,M_ ure Imniementation l SPECIFICATIONS Prepared by: .

Name

. [MSO _

k I Signature' bate Approved by: TJ ae 4 /' f Name f Sifure ba(e IMPLEMENTATION I Change Process: NUC DCM CHAPTER 6 SPECIFICATIONS REVISION 5 Verified By: Date:

Concurrence By: Date:

l

!' (CK-MP34443. Psee O Sheet 1 of 4 j CAMILE1DNDCPIDCM6B, DOC

l. 9707010086 970627 PDR ADOCK 05000423 P PDR

. Northeast Utilities Millstone Unit 3 CK-MP344' 43]

Change Process: f; '

Sheet 2 of 4 Change Process Retiew Checklist Programmatic Review Checklist CK-MP3-04-03B Change Procedure Implementation l

l l

Specification:

l Change No.: Date ofRevision / Change:

1. Has the Specification been prepared in accordance with identified and controlled format requirements?

Yes No O N/A Comment

2. Has the Specification been reviewed and approved in accordance with documented l procedures, and by personnel independent of the preparer?

Yes No N/A O comment i

3. Has the Speci6 cation which includes QA items been reviewed by QA in accordance with documented procedures?

Yes O No O N/A O comment O

4. Has the Specification been suoject to appropriate interdisciplinary review (both internal and external)?

Yes O No O N/A Comment

5. Has the document control system been updated including appropriate design change notices?

Yes No N/A O comment O

6. If the Specification is a Design Specification in accordance with AShE Section III, has the specification been stamped by a professional engineer licensed in the appropriate state (s) ?

l Yes O No O N/A O comment l

l (CK-MP3-04-02. Rev.1. Page 4)

CAMILSTONDCPIDCM6B. DOC

l Northeast Utilities CK-MP3-04 435 l

l Ministone U;it 3 Change Process: SpeelAcasisms I Sheet 3 of 4

Change Process Review CheckHat 1
7. Was a Specification Chance controlled and approved in accudance with the DCN Process? '

Yes O No N/A Comment 0 i

1 l 8. Was a Change Order issued to cover a Specification Chance for QA items?

Yes O No O N/A Comment

9. Was a Soecification Revision rewritten and issued in its entirety?

. j

~"

Yes O No O N/A O Comment 0

~~~

l i

l

10. Did a voided Specification receive the same review and approval as the original .

Specification?

' Yes No N/A O Comment l

I I

I i

I i

l l

l

?

\

2 I

1 I

(CK-MP3-0442, Rev.1 Page 4)

C:\MEETONECPIDCM6B. DOC '

l.
  • Northeast Utilities i

i . CK-MP344438

- Millstone Unit 3 Change Pmcess: Specifications Change Process Review Checklist

\

i.

Channe Procedure Implementation -SPECIFICATIONS l

Comment Number Comment i

1 1

)

l I

l l

i l

I l

l l

i l

)

I 1

i l

l l

(CK-MP344-02, Rev.1. Page 4)

C.WILSTONECPIDCM6& DOC

_ -