i l
0.
i Northeast Utilities I
Millstone-Unit 3 l
l Independent Corrective Action Verification Program (ICAVP)
I Programmatic Review Checklist I
CK-MP3-04-03B Change.P_ror,M_ ure Imniementation l
SPECIFICATIONS Prepared by:
[MSO k
I Name Signature' bate Approved by:
TJ ae 4 /' f Name f Sifure ba(e IMPLEMENTATION I
Change Process:
NUC DCM CHAPTER 6 SPECIFICATIONS REVISION 5 Verified By:
Date:
Concurrence By:
Date:
l (CK-MP34443. Psee O Sheet 1 of 4 j
CAMILE1DNDCPIDCM6B, DOC l.
9707010086 970627 PDR ADOCK 05000423 P
Northeast Utilities CK-MP344 43]
Millstone Unit 3 Change Process: f; '
Sheet 2 of 4 Change Process Retiew Checklist Programmatic Review Checklist CK-MP3-04-03B Change Procedure Implementation l
l l
Specification:
l Change No.:
Date ofRevision / Change:
- 1. Has the Specification been prepared in accordance with identified and controlled format requirements?
Yes No O N/A Comment
- 2. Has the Specification been reviewed and approved in accordance with documented procedures, and by personnel independent of the preparer?
Yes No N/A O comment
- 3. Has the Speci6 cation which includes QA items been reviewed by QA in accordance with documented procedures?
Yes O No O N/A O comment O
- 4. Has the Specification been suoject to appropriate interdisciplinary review (both internal and external)?
Yes O No O N/A Comment
- 5. Has the document control system been updated including appropriate design change notices?
Yes No N/A O comment O
- 6. If the Specification is a Design Specification in accordance with AShE Section III, has the specification been stamped by a professional engineer licensed in the appropriate state (s) ?
Yes O No O N/A O comment l
l l
(CK-MP3-04-02. Rev.1. Page 4)
CAMILSTONDCPIDCM6B. DOC
Northeast Utilities l
CK-MP3-04 435 l
Ministone U;it 3 Change Process: SpeelAcasisms Sheet 3 of 4 Change Process Review CheckHat
- 7. Was a Specification Chance controlled and approved in accudance with the DCN Process?
Yes O No N/A Comment 0 i
l
- 8. Was a Change Order issued to cover a Specification Chance for QA items?
Yes O No O N/A Comment
- 9. Was a Soecification Revision rewritten and issued in its entirety?
j Yes O No O N/A O Comment 0
~~~
~"
i l
- 10. Did a voided Specification receive the same review and approval as the original.
Specification?
' Yes No N/A O Comment l
I i
i l
l
?
\\
2 I
(CK-MP3-0442, Rev.1 Page 4)
C:\\MEETONECPIDCM6B. DOC
l.
Northeast Utilities i
CK-MP344438 i.
Millstone Unit 3 Change Pmcess: Specifications Change Process Review Checklist
\\
i.
Channe Procedure Implementation -SPECIFICATIONS Comment Number Comment i
1 1
)
i l
i
)
i l
l l
(CK-MP344-02, Rev.1. Page 4)