MILLGTONE UNIT 3 INDEPENDENT CORRECTIVE ACTION VERIFICATION PROGRAM STATUS REPORT FEBRUARY 11,1998 e

jtjo p-Project Milestone Schedule l

Tier 1 System Review Complete RSS Modifications Docs + 2 weeks Tier 1 Corrective Action Review Docs + 2 weeks Tier 1 O&M Review Complete Tier 2 Review Complete Tier 3 Review Complete Final Report issue DR Resol + 3 weeks A

)Eh,0 P

D K O O O 23 P

PDR;

(-

l Tier 1 - RSS/SWP/MOV Review Status l

MOV Calcs - Complete SWP Calcs - Complete RSS Mods - Complete with exception of

- 2 PRA checklists (RF1-838) l

- 2 Electrical checklists l-

- 2 Lar9e bore stress cales (RFI-848)

- Closeout of misc. placeholders (RFI 836 and -837)

Note: NRC request for S&L to review 4 new RSS mods:

M3-97045 Rev.

M3-97106 M3-97102 M3-98008 0

A Jlh 7~

Tier 1 - Programmatic Review Status j

Corrective Action Review

- Of the 1534 CA documents, all available documents have been reviewed UIRs 1014, 976,991 - Completion scheduled prior to Mode 2; not expected to be submitted to s&L prior to March Recommend last three UlRs be included in NRC Corrective Action inspection l

M l

1 l

l.-

1b Tier 1 - Programmatic Review Status Corrective Action implementation Review j

- 1534 CA documents were screened to determine which ones would be reviewed for implementation

- 250 were selected

- NU has provided 218 closure packages

- NU is also identifying those packages not scheduled for closure until Mode 2

- S&L review is approximately 35% complete DDR review complete A$

l Discrepancy Report Summary 918 Valid Preliminary DRs issued to NRC/NU/NEAC 619 Resolutions submitted by NU 359 NU Resolutions entered into database 199 NU Resolutions reviewed by S&L

- 153 Accepted and Closed

- 43 Not accepted - Retumed w/ Comments 3 Pending review of implementation of NU corrective action l

m..

1

)

)

l l

Discrepancy Report Summary 4

l

. Of the 153 Acceptable and Closed resolutions 67 Confirmed Discrepancies 39 Previously identified by NU 47 Non-discrepant conditions

. Of the 67 Confirmed Discrepancies 5 Level 3 62 Level 4 I

. Of the 3 Pending Discrepancies 3 Level 3 A~

Ah k

Discrepancy Report Summary Number NU Resp.

S&L Eval.

NU Resp.

l Issued in Dbase Complete Not Accepted i

Level 2 1

1 0

0 i

1 l

Level 3 302 102 25 24 I'

Level 4 615 256 131 19 i

t 4it?

A Y

- -., _.., - _ ~. ~

~ ~ _ ~.. _ _., _., _

.~g--..--~

H i

l Discrepancy Report Summary l

Issued NU Reso.

Closed Tier 1 771 268 99 i

Tier 2 48 38 26 Tier 3 99 53 gg TOTALS 918 359 153 4l[h

$~

DR Type & Level Summary (Confirmed DRs)

Discrepancy Type Level 3 Level 4 Calculations 4

15 Component Data 1

2 Corrective Actionr.,

2 5

Design Change Process 1

0 Drawings 0

12 Installation Implemenmtation 0

12 Installation Regiurements 0

3 Licensing Documents 0

8 O&M and Testing implementation 0

1 i

O&M and Testing Procedures 0

3 Procedure implementation 0

0 Testing Implementation 0

1 eging Requirements 0

0 4

)$

lu _ _. _ _

5 _ __ 3 1