ML20141E528

From kanterella
Jump to navigation Jump to search
Rev 0 to CK-MP3-04-03C, Independent Corrective Action Verification Program (ICAVP) Programmatic Review Checklist, Change Procedure Implementation Calculations
ML20141E528
Person / Time
Site: Millstone Dominion icon.png
Issue date: 06/24/1997
From: Caruso A, Tom Ryan
NORTHEAST UTILITIES
To:
Shared Package
ML20141E505 List:
References
CK-MP3-04-03C, CK-MP3-4-3C, NUDOCS 9707010088
Download: ML20141E528 (4)


Text

. . _ _ _ _ _ _ _ _ _ - _ _ - _ .

i l

i Northeast Utilities Millstone - Unit 3 1

1 Independent Corrective Action Verification Program (ICAVP) l Programmatic Review Checklist CK-MP3-04-03C i

Channe Procedure Imniementation CALCULATIONS Prepared by: / b A803O I ff Name Signatur 'Date Approved by: %T 4/a/97 '

Name (/ S' ba(e l

l tuf IMPLEMENTATION Channe Process: NUC DCM CHAPTER 5 CALCULATIONS REVISION 5 Verified By: Date:

Concurrence By: Date:

(cK-MP34nt.Pase l Sheet 1 of 4 C:WILETONECPIDCMS, DOC

! 9707010088 970627 l PDR ADOCK 05000423 l P PM

. I

. Northeast Utilities CK-MP34443C Iwmas- Ucit 3 ChangePrwesse:r a,-smes Sheet 2 of 4 Change Process Review Checklist Programmatic Review Checklist CK-MP3-04-03C -

Channe Procedure Imolementation Calculation:

Change No.: , Date ofRevision / Change:

1. Has the NU calculation been prepared in accordance with identified and controlled l

format requirements including attachments to substantiate the calculation?

Yes No O N/A Comment

2. Has the revision to the NU calculation been prepared in accordance with identified and  ;

controlled format requirements?

l Yes O No O N/A Comment

3. Has the Vendor calculation been prepared in accordance with identi6ed and controlled format requirements?

Yes O No N/A Comment O  !

, 4. Has the calculation been reviewed and approved in accordance w:th documented procedures, and by personnel independent of the preparer?

Yes No N/A Comment l

5. Has the calculation been subject to appropriate interdisciplinary review (both internal and external)?

Yes No N/A O Comment j 6. If computer code or software has been used in the calculation, does calculation L

identify computer type, code name and version (if applicable)?

Yes No N/A Comment O

7. Has a superseded or voided calculation been prepared in accordance with identified

! and controlled format requirements?

i

! Yes O No O N/A Comment (CK-MP3-44-e2 Rev.1.Pase2)

CAMILEToNECPIDCMS, DOC

l l *

-- Noetheast Utilities CK-MP344430 l ,

Millstone Unit 3 Change Process: Cale=Ia*Ia==

l Sheet 3 ef 4 1 Change Pancess Review Checklist

8. Has the document control system been updated including appropriate design change notices (DCN)?

l Yes O No N/A Comment i

1 l

l I

(CK-MP3-04-02, Rev. I. Pase3)

C"M11STOhTCPIDCMS, DOC

l , Northean Utilities CK-MP3-04-43C Millstone Unit 3 Change Pacess: Calantadams Sheet 4 of 4 l Change Pacess Review Checklist  !

i l

l Channe Procedure Implementation -CALCULATIONS

' l 1

1 Comment i

Number comment l

l l

l I

l l

I l

l l I

l l

l l

l l

l l

l l

(CK-MP3-04-02, Rev. t. Page4)

C:\MILSTONECPIDCMS. DOC