ML18037A140: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 12/05/1978
| issue date = 12/05/1978
| title = Monthly Oper Rept for Nov 1978
| title = Monthly Oper Rept for Nov 1978
| author name = PERKINS T J
| author name = Perkins T
| author affiliation = NIAGARA MOHAWK POWER CORP.
| author affiliation = NIAGARA MOHAWK POWER CORP.
| addressee name =  
| addressee name =  
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:~Q BEGULATO INFORMATION DISTRIBUTION
{{#Wiki_filter:~     Q BEGULATO       INFORMATION DISTRIBUTION .           TEht (BI DS)
.TEht (BI DS)ACCESSION NBB.-7812120103 DOC.DATE~78/11/30 NOTARIZED~NO FACIL~50-220 NINE MILE, POINT¹I, NIAGARA MOHAWK, POWER CORP.AUTH.NAME AUTHOR AFFILIATION
ACCESSION NBB.-7812120103             DOC.DATE ~ 78/11/30           NOTARIZED ~ NO           DOCKET  ¹0
~PERKINS T.J~NIAGARA MOHAWK.PWR BECI P.NAME BEG I P I ENT'FF I L I ATION DOCKET¹0 05000220 SUBJECT!Monthly Op er Rept for Nov 1,978.~DISTRIBUTION CODE: A008S COPIES RECEIVED-LTR ENCL SIZE-3'ITLE-ANNUAL SEMI-ANNUAL
                                              ¹ FACIL~50-220 NINE MILE,POINT I, NIAGARA MOHAWK,POWER CORP.                                   05000220 AUTH. NAME             AUTHOR AFFILIATION
&MONTHLY,OPERATI NG REPORTS (OL STAGNOTES-~RECIPIENT 0 ID CODE/NAME ACTION: 05 BCINTERNAL: OJ REG FILE 11 I&E 14 MIPC17AD SYS 8 PBOJ 19 REAC SAFT BR 21 EEB 0 23 EFFL TR SYS EXTERNAL-03 LPDR 24 NATL LAB 26 ACRS COPI ES LTTR ENCL 6 6 I I 02 02 02 02 0.1 01 0.1'1 0.1 01 01 01 02 02 0.1 O,l 15 15 REC I P I ENT ID CODF/NAME 02 NRC PDR 13 HANAUEB 16 DIR DOB 18 ENGR BB 20 PLANT S YS BR 22 CORE PEBF BR 04 NSIC 25 BROOKHAVEN COP I ES LTTR ENCL 01 01 01 01 01 , 01 01 01 O.l 01 01,.0.1 01 01 01 01 TOTAL NUMBER OF COPI ES BEQUI BED!LTTB 4,1 ENCL 41 n h l)'E ,t~l,'
~   PERKINS T.J ~         NIAGARA MOHAWK .PWR BECI P . NAME                                 I BEG I P I ENT'FF I L ATION SUBJECT!     Monthly   Op er   Rept   for   Nov 1,978.
OPERATING STATUS OPERATING DATA REPORT 8 DOCKET NO.50-220 DATE~~i, 1978 COMPLBTBD BY L8r~~k'nS TELEPHONE 32'~~10 ext.1312 I.Unit Name: 2.Reporting Period: 11 Ol 8 11 30 8 3.Licensed Thermal Power (MlVt): 4.Nameplate Rating (Gross MlVe): 640 5.Design Electrical Rating (Net MNe): 6~6 7.srfaximum Dependable Capacity (Net MIVe): Notes 8.If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasons: 9.Power Level To which Restricted, If Any (Net M)Ve): 10.Reasons For Restrictions, If Any: V R'b d W This Month Yr.-to.Date4
~   DISTRIBUTION CODE: A008S COPIES RECEIVED-LTR                         ENCL 3'ITLE - ANNUAL SEMI-ANNUAL & MONTHLY,OPERATING REPORTS SIZE-(OL STAG NOTES- ~
',o16 0 0~86~66 387~357 4 210 845 374,330 4,070, 77 83.2 1.6 11.Hours In Reporting Period 12.iNumber Of Hours Reactor)Vas Critical 13.Reactor Reserve Shutdown Hours 0 14.Hours Generator On-Line 15.Unit Reserve Shutdown Hours 16.Gross Thermal Energy Generated (MPH)17.Gross Electrical Energy Generated (iWIVH)18.Net Electrical Energy Generated (MNH)19.Unit Service Factor 20.Unit Availability Factor 100 21.Un!t Capacity Factor (Using hfDC Net)85.2 22.Unit Capacity Factor (Using DER Net)23.Unit Forced Outage Rate 0 24.Shutdorvns Scheduled Over Next 6 irifonths (Type.Date.arid Duratio;r of Each): Cumulative 79,6o8 1 204.8 20.2~6 29 922 557 29,0 7, 00 70.7 70s 7 59.8 25.If Shut Down At End Of Report Period, Estimated Date of Startup: 26.Units ln Test Status (Prior to Comruercial Operation):
RECIPIENT             COPI ES              REC I P I ENT          COP  I ES 0 ACTION:        ID CODE/NAME 05 BC LTTR ENCL 6      6 ID CODF/NAME            LTTR ENCL INTERNAL:   OJ REG   FILE               I      I    02 NRC PDR                01      01 11 I &E                 02      02      13 HANAUEB                01      01 14 MIPC                  02      02      16 DIR DOB                01  ,  01 17AD SYS 8 PBOJ                   01      18 ENGR BB                01      01 19 REAC SAFT BR 0.1 0.1   '1       20 PLANT S YS BR          O.l    01 21 EEB                    0.1     01      22 CORE PEBF BR           01,. 0.1 0              23 EFFL TR SYS            01     01 EXTERNAL- 03 LPDR                      02      02      04 NSIC                    01     01 24 NATL LAB                0.1     O,l    25 BROOKHAVEN              01     01 26 ACRS                    15    15 TOTAL NUMBER OF COPI ES BEQUI BED! LTTB               4,1   ENCL       41
Forecast Acllrcved INITIA L CRITICALITY IN ITIA L ELECTRICITY CO81f Af ERCIA L OPERATION 781%.8 Q(Q (rl/77) l~s Wl DOCKET NO.5 COMPLETED DY TELEPIIONE 315-3 3-2110 ex'.1312 UniM1 9 8 MONTH DAY AVERAGE DAlLY PO'O'ER LEVEL (M)s'e-Net
)DAY AVERAGE DAILY POh'ER LEVEL (MWe-Net)554 17 4 51 5~.4 19 20 553 552 10 12 13 14 15 16 4O 23 25 26 30 31 548 383 391 422 497 551 555 554 INSTRUCTIONS On this format, list the average daily unit power level in MNe-Net I'or each day in thc rcport to ntontlt.Contputc tti the nearest whole megaivat t.(')!77 l


UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH.BM20-UNIT NAME DATE COMPLETED BY ext.1312 nit 1 8 l)ate Lice nscc Event Rcport-Cp CP EA cn'O~o l~o Cause Er.('orrcctivc Acth>n t>>Prevent Rect>ffcncc 11/05/78 ll/10/78 ll/12/78 11/24/78 3.6 4.5 6.7 96 H H Condensate Demin Change¹12 Condensate Demit Change¹13 Condensate Demin Change All Control Rods Full Out-Preconditioning F: F.>reed S: Scheduled ('>/77)Reason: A-Equipment Failure (Explain)B-hiaintenance or Test C-Refueling D.Reiudatory Restriction I':Operator Trainint, k, License Fxatnination I-Adn>inist rat ivc (I.Operal>onal I:rf>>f (I:xplaln)
n h
I I Other (Explair>)
l
~hlcthod: I hlanual 2-h(anual Scram.3-Automatic Sera>n.4.Other (Explain)Exhibit G-Instructions for Prcparath>n of Data Entry Shc'ts I'or Licensee I:.v nt R p>rt (I.l!I()File(NURI!G-OI6I)Exhibit I-Sa>nc Source
      'E
    )
t~
l,'


(J l*''NIAGARA MOHAWK POWER CORPORATION NINE MILE POINT NUCLEAR STATION UNIT Pl NARRATIVE OF OPERATING EXPERIENCE November 1978 The station operated at 85.2/electrical capacity factor with an availability of 100'5.The unit is derated to 92.0A thermal power as a result of scram reactivity restrictions.
OPERATING DATA REPORT
November 1-4 The unit operated at 92$power maintained with recirculation flow.November 5 November 6-9 Reduced load to 500 MWe for condensate demineralizer change at 0005.At 0335 load was increased back to 558 MWe after demineralizer change.The unit maintained 92%power with recirculation flow.November 10 November 11 November 12 Reduced load to 500 MWe at 0130 for condensate demineralizer change.At 0558 load was returned to 560 MWe after demineralizer change.Unit was operated at 92/power.Reduced load to 500 MWe for condensate demineralizer change at 0132.At 0648 load was'eturned after demineralizer change.November 13-21 Maintained load at 92/thermal power with recir-culation flow.On the 21st, 100/recirc flow was reached.November 21-24 Load slowly coasted down until 0600 on the 24th when power was reduced to 350 MWe for control rod pattern change to an all rods out configuration.
                                                                                                        ~~i, 8
At 0840 all control rods were at position 48.At 1345 pre-conditioning started at a rate of approximately 3 MWe/hr.November 24-27 November 28 November 29-30 Increasing load as PCIOMR limits allow.Reached 92/power (all rods out).The unit maintained 92%%d power with recirculation flow.  
DOCKET NO. 50-220 DATE                      1978 COMPLBTBD BY    L8r~~k'nS TELEPHONE 32    '~~10 ext. 1312 OPERATING STATUS Notes I. Unit Name:
'Jk f}}
: 2. Reporting Period: 11 Ol 8            11 30    8
: 3. Licensed Thermal Power (MlVt):
: 4. Nameplate Rating (Gross MlVe):        640
: 5. Design Electrical Rating (Net MNe):  6
                                                    ~6
: 7. srfaximum Dependable Capacity (Net MIVe):
: 8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
: 9. Power Level To which Restricted,    If Any (Net M)Ve):
: 10. Reasons For Restrictions,    If Any:                              V        R 'b  d  W This Month            Yr.-to.Date4        Cumulative
: 11. Hours In Reporting Period
                                                                                      ',o16                  79,6o8
: 12. iNumber Of Hours Reactor )Vas Critical
: 13. Reactor Reserve Shutdown Hours                                      0                      0              1 204
: 14. Hours Generator On-Line 15.
16.
17.
18.
Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MPH)
Gross Electrical Energy Generated (iWIVH)
Net Electrical Energy Generated (MNH)
                                                      ~86      387~357 374,330
                                                                              ~66  4  210 845 4,070, 77 0
                                                                                                    ~6  29 922 557 29,0 7, 00
: 20. 2
                                                                                                                          .8
: 19. Unit Service Factor                                                                                            70.7
: 20. Unit Availability Factor                                        100                                            70s 7
: 21. Un! t Capacity Factor (Using hfDC Net)                            85.2                  83.2                  59.8
: 22. Unit Capacity Factor (Using DER Net)
: 23. Unit Forced Outage Rate                                            0                      1.6
: 24. Shutdorvns Scheduled Over Next 6 irifonths (Type. Date. arid Duratio;r of Each):
: 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
: 26. Units ln Test Status (Prior to Comruercial Operation):                        Forecast            Acllrcved INITIAL CRITICALITY IN ITIAL ELECTRICITY CO81f Af ERCIA L  OPERATION 781%.8 Q(Q                                                                                                  (rl/77 )
 
l
  ~s Wl
 
DOCKET NO.        5 UniM1 9 8 COMPLETED DY TELEPIIONE        315-3 3-2110 ex'. 1312 MONTH DAY        AVERAGE DAlLYPO'O'ER LEVEL                          DAY        AVERAGE DAILYPOh'ER LEVEL (M)s'e-Net )                                                  (MWe-Net) 17              554 19 4            51                                              20              553 5      ~.4                                                                    552 23              548 383 25              391 10              4O                                              26              422 497 12 551 13                                                                                555 14                                                              30                554 15                                                              31 16 INSTRUCTIONS On this format, list the average daily unit power level in MNe-Net I'or each day in thc rcport to ntontlt. Contputc  tti the nearest whole megaivat t.
(')!77 l
 
UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME
                                                                                                                                . BM20- nit          1 DATE                        8 REPORT MONTH                                  COMPLETED BY ext. 1312 Lice nscc            O~                    Cause      ('orrcctivc Cp  CP    o  l~                        Er.
l)ate                                            Event    EA Acth>n t>>
Rcport-  cn' o                    Prevent Rect>ffcncc 11/05/78            3.6                                                            Condensate  Demin Change ll/10/78            4.5                                                            ¹12 Condensate Demit Change ll/12/78            6.7        H                                                  ¹13 Condensate Demin Change 11/24/78            96          H                                                  All Control  Rods      Full Out-Preconditioning F: F.>reed        Reason:                                              hlcthod:                          Exhibit G - Instructions S: Scheduled      A-Equipment Failure (Explain)                        I  hlanual                        for Prcparath>n of Data B-hiaintenance or Test                              2-h(anual Scram.                  Entry Shc'ts I'or Licensee C-Refueling                                          3-Automatic Sera>n.                I:.v nt R p >rt (I.l!I() File(NURI!G-D.Reiudatory Restriction                            4.Other (Explain)                  OI6I)
I':Operator Trainint, k, License Fxatnination I -Adn>inist rat ivc (I.Operal>onal I:rf>>f (I:xplaln)                                                      Exhibit    I - Sa>nc Source
('>/77)                I I Other (Explair>)        ~
 
(J l
NIAGARA MOHAWK POWER CORPORATION NINE MILE POINT NUCLEAR STATION UNIT Pl NARRATIVE OF OPERATING EXPERIENCE November 1978 The station operated at 85.2/ electrical capacity factor with an availability of 100'5. The unit is derated to 92.0A thermal power as a result of scram reactivity restrictions.
November 1-4         The unit operated at   92$ power maintained with recirculation flow.
November 5           Reduced   load to 500 MWe for condensate demineralizer change   at 0005. At 0335 load was increased back to 558   MWe after demineralizer change.
November 6-9          The unit maintained 92%   power with recirculation flow.
November 10           Reduced load to 500 MWe at 0130 for condensate demineralizer change. At 0558 load was returned to 560 MWe after demineralizer change.
November 11          Unit was operated at 92/ power.
November 12          Reduced load to 500 MWe for condensate demineralizer change at 0132. At 0648 load was'eturned after demineralizer change.
November 13-21       Maintained load at 92/ thermal power with recir-culation flow. On the 21st, 100/ recirc flow was reached.
November 21-24       Load slowly coasted down until 0600 on the 24th when power was reduced to 350 MWe for control rod pattern change to an all rods out configuration. At 0840 all control rods were at position 48. At 1345 pre-conditioning started at     a rate of approximately 3 MWe/hr.
November 24-27       Increasing load as   PCIOMR   limits allow.
November 28          Reached   92/ power (all rods out).
November 29-30        The unit maintained 92%%d power with recirculation flow.
 
Jk f}}

Latest revision as of 16:27, 3 February 2020

Monthly Oper Rept for Nov 1978
ML18037A140
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 12/05/1978
From: Perkins T
NIAGARA MOHAWK POWER CORP.
To:
Shared Package
ML18037A139 List:
References
NUDOCS 7812120103
Download: ML18037A140 (10)


Text

~ Q BEGULATO INFORMATION DISTRIBUTION . TEht (BI DS)

ACCESSION NBB.-7812120103 DOC.DATE ~ 78/11/30 NOTARIZED ~ NO DOCKET ¹0

¹ FACIL~50-220 NINE MILE,POINT I, NIAGARA MOHAWK,POWER CORP. 05000220 AUTH. NAME AUTHOR AFFILIATION

~ PERKINS T.J ~ NIAGARA MOHAWK .PWR BECI P . NAME I BEG I P I ENT'FF I L ATION SUBJECT! Monthly Op er Rept for Nov 1,978.

~ DISTRIBUTION CODE: A008S COPIES RECEIVED-LTR ENCL 3'ITLE - ANNUAL SEMI-ANNUAL & MONTHLY,OPERATING REPORTS SIZE-(OL STAG NOTES- ~

RECIPIENT COPI ES REC I P I ENT COP I ES 0 ACTION: ID CODE/NAME 05 BC LTTR ENCL 6 6 ID CODF/NAME LTTR ENCL INTERNAL: OJ REG FILE I I 02 NRC PDR 01 01 11 I &E 02 02 13 HANAUEB 01 01 14 MIPC 02 02 16 DIR DOB 01 , 01 17AD SYS 8 PBOJ 01 18 ENGR BB 01 01 19 REAC SAFT BR 0.1 0.1 '1 20 PLANT S YS BR O.l 01 21 EEB 0.1 01 22 CORE PEBF BR 01,. 0.1 0 23 EFFL TR SYS 01 01 EXTERNAL- 03 LPDR 02 02 04 NSIC 01 01 24 NATL LAB 0.1 O,l 25 BROOKHAVEN 01 01 26 ACRS 15 15 TOTAL NUMBER OF COPI ES BEQUI BED! LTTB 4,1 ENCL 41

n h

l

'E

)

t~

l,'

OPERATING DATA REPORT

~~i, 8

DOCKET NO. 50-220 DATE 1978 COMPLBTBD BY L8r~~k'nS TELEPHONE 32 '~~10 ext. 1312 OPERATING STATUS Notes I. Unit Name:

2. Reporting Period: 11 Ol 8 11 30 8
3. Licensed Thermal Power (MlVt):
4. Nameplate Rating (Gross MlVe): 640
5. Design Electrical Rating (Net MNe): 6

~6

7. srfaximum Dependable Capacity (Net MIVe):
8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To which Restricted, If Any (Net M)Ve):
10. Reasons For Restrictions, If Any: V R 'b d W This Month Yr.-to.Date4 Cumulative
11. Hours In Reporting Period

',o16 79,6o8

12. iNumber Of Hours Reactor )Vas Critical
13. Reactor Reserve Shutdown Hours 0 0 1 204
14. Hours Generator On-Line 15.

16.

17.

18.

Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MPH)

Gross Electrical Energy Generated (iWIVH)

Net Electrical Energy Generated (MNH)

~86 387~357 374,330

~66 4 210 845 4,070, 77 0

~6 29 922 557 29,0 7, 00

20. 2

.8

19. Unit Service Factor 70.7
20. Unit Availability Factor 100 70s 7
21. Un! t Capacity Factor (Using hfDC Net) 85.2 83.2 59.8
22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate 0 1.6
24. Shutdorvns Scheduled Over Next 6 irifonths (Type. Date. arid Duratio;r of Each):
25. If Shut Down At End Of Report Period, Estimated Date of Startup:
26. Units ln Test Status (Prior to Comruercial Operation): Forecast Acllrcved INITIAL CRITICALITY IN ITIAL ELECTRICITY CO81f Af ERCIA L OPERATION 781%.8 Q(Q (rl/77 )

l

~s Wl

DOCKET NO. 5 UniM1 9 8 COMPLETED DY TELEPIIONE 315-3 3-2110 ex'. 1312 MONTH DAY AVERAGE DAlLYPO'O'ER LEVEL DAY AVERAGE DAILYPOh'ER LEVEL (M)s'e-Net ) (MWe-Net) 17 554 19 4 51 20 553 5 ~.4 552 23 548 383 25 391 10 4O 26 422 497 12 551 13 555 14 30 554 15 31 16 INSTRUCTIONS On this format, list the average daily unit power level in MNe-Net I'or each day in thc rcport to ntontlt. Contputc tti the nearest whole megaivat t.

(')!77 l

UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME

. BM20- nit 1 DATE 8 REPORT MONTH COMPLETED BY ext. 1312 Lice nscc O~ Cause ('orrcctivc Cp CP o l~ Er.

l)ate Event EA Acth>n t>>

Rcport- cn' o Prevent Rect>ffcncc 11/05/78 3.6 Condensate Demin Change ll/10/78 4.5 ¹12 Condensate Demit Change ll/12/78 6.7 H ¹13 Condensate Demin Change 11/24/78 96 H All Control Rods Full Out-Preconditioning F: F.>reed Reason: hlcthod: Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) I hlanual for Prcparath>n of Data B-hiaintenance or Test 2-h(anual Scram. Entry Shc'ts I'or Licensee C-Refueling 3-Automatic Sera>n. I:.v nt R p >rt (I.l!I() File(NURI!G-D.Reiudatory Restriction 4.Other (Explain) OI6I)

I':Operator Trainint, k, License Fxatnination I -Adn>inist rat ivc (I.Operal>onal I:rf>>f (I:xplaln) Exhibit I - Sa>nc Source

('>/77) I I Other (Explair>) ~

(J l

NIAGARA MOHAWK POWER CORPORATION NINE MILE POINT NUCLEAR STATION UNIT Pl NARRATIVE OF OPERATING EXPERIENCE November 1978 The station operated at 85.2/ electrical capacity factor with an availability of 100'5. The unit is derated to 92.0A thermal power as a result of scram reactivity restrictions.

November 1-4 The unit operated at 92$ power maintained with recirculation flow.

November 5 Reduced load to 500 MWe for condensate demineralizer change at 0005. At 0335 load was increased back to 558 MWe after demineralizer change.

November 6-9 The unit maintained 92% power with recirculation flow.

November 10 Reduced load to 500 MWe at 0130 for condensate demineralizer change. At 0558 load was returned to 560 MWe after demineralizer change.

November 11 Unit was operated at 92/ power.

November 12 Reduced load to 500 MWe for condensate demineralizer change at 0132. At 0648 load was'eturned after demineralizer change.

November 13-21 Maintained load at 92/ thermal power with recir-culation flow. On the 21st, 100/ recirc flow was reached.

November 21-24 Load slowly coasted down until 0600 on the 24th when power was reduced to 350 MWe for control rod pattern change to an all rods out configuration. At 0840 all control rods were at position 48. At 1345 pre-conditioning started at a rate of approximately 3 MWe/hr.

November 24-27 Increasing load as PCIOMR limits allow.

November 28 Reached 92/ power (all rods out).

November 29-30 The unit maintained 92%%d power with recirculation flow.

Jk f