ML18037A140

From kanterella
Jump to navigation Jump to search
Monthly Oper Rept for Nov 1978
ML18037A140
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 12/05/1978
From: Perkins T
NIAGARA MOHAWK POWER CORP.
To:
Shared Package
ML18037A139 List:
References
NUDOCS 7812120103
Download: ML18037A140 (10)


Text

~

Q BEGULATO INFORMATION DISTRIBUTION.

TEht (BIDS)

ACCESSION NBB.-7812120103 DOC.DATE ~ 78/11/30 NOTARIZED ~

NO FACIL~50-220 NINE MILE,POINT ¹ I, NIAGARA MOHAWK,POWER CORP.

AUTH.NAME AUTHOR AFFILIATION

~

PERKINS T.J

~

NIAGARA MOHAWK.PWR BECI P. NAME BEG I P IENT'FF ILI ATION DOCKET ¹0 05000220 SUBJECT! Monthly Op er Rept for Nov 1,978.

~

DISTRIBUTION CODE: A008S COPIES RECEIVED-LTR ENCL SIZE-3'ITLE -

ANNUAL SEMI-ANNUAL & MONTHLY,OPERATING REPORTS (OL STAG NOTES- ~

RECIPIENT 0

ID CODE/NAME ACTION:

05 BC INTERNAL: OJ REG FILE 11 I &E 14 MIPC 17AD SYS 8

PBOJ 19 REAC SAFT BR 21 EEB 0

23 EFFL TR SYS EXTERNAL- 03 LPDR 24 NATL LAB 26 ACRS COPI ES LTTR ENCL 6

6 I

I 02 02 02 02 0.1 01 0.1

'1 0.1 01 01 01 02 02 0.1 O,l 15 15 REC I P I ENT ID CODF/NAME 02 NRC PDR 13 HANAUEB 16 DIR DOB 18 ENGR BB 20 PLANT S YS BR 22 CORE PEBF BR 04 NSIC 25 BROOKHAVEN COP I ES LTTR ENCL 01 01 01 01 01 01 01 01 O.l 01 01,.

0.1 01 01 01 01 TOTAL NUMBER OF COPI ES BEQUI BED! LTTB 4,1 ENCL 41

n h

l

)

'E t~

l,'

OPERATING STATUS OPERATING DATAREPORT 8

DOCKET NO. 50-220 DATE~~i, 1978 COMPLBTBD BY L8r~~k'nS TELEPHONE 32 '~~10 ext.

1312 I. Unit Name:

2. Reporting Period:

11 Ol 8

11 30 8

3. Licensed Thermal Power (MlVt):
4. Nameplate Rating (Gross MlVe):

640

5. Design Electrical Rating (Net MNe): 6

~6

7. srfaximum Dependable Capacity (Net MIVe):

Notes

8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To which Restricted, IfAny (Net M)Ve):
10. Reasons For Restrictions, IfAny:

V R

'b d W

This Month Yr.-to.Date4

',o16 0

0

~86 ~66 387~357 4 210 845 374,330 4,070, 77 83.2 1.6

11. Hours In Reporting Period
12. iNumber Of Hours Reactor )Vas Critical
13. Reactor Reserve Shutdown Hours 0
14. Hours Generator On-Line
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (MPH)
17. Gross Electrical Energy Generated (iWIVH)
18. Net Electrical Energy Generated (MNH)
19. Unit Service Factor
20. Unit AvailabilityFactor 100
21. Un!t Capacity Factor (Using hfDC Net) 85.2
22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate 0
24. Shutdorvns Scheduled Over Next 6 irifonths (Type. Date. arid Duratio;r of Each):

Cumulative 79,6o8 1 204

.8

20. 2

~6 29 922 557 29,0 7, 00 70.7 70s 7 59.8

25. IfShut Down At End Of Report Period, Estimated Date of Startup:
26. Units ln Test Status (Prior to Comruercial Operation):

Forecast Acllrcved INITIAL CRITICALITY IN ITIAL ELECTRICITY CO81f AfERCIAL OPERATION 781%.8 Q(Q (rl/77 )

l

~ s Wl

DOCKET NO.

5 COMPLETED DY TELEPIIONE 315-3 3-2110 ex'.

1312 UniM1 9

8 MONTH DAY AVERAGE DAlLYPO'O'ER LEVEL (M)s'e-Net )

DAY AVERAGE DAILYPOh'ER LEVEL (MWe-Net) 554 17 4

51 5

~.4 19 20 553 552 10 12 13 14 15 16 4O 23 25 26 30 31 548 383 391 422 497 551 555 554 INSTRUCTIONS On this format, list the average daily unit power level in MNe-Net I'or each day in thc rcport to ntontlt. Contputc tti the nearest whole megaivat t.

(')!77 l

UNITSHUTDOWNS AND POWER REDUCTIONS REPORT MONTH

. BM20-UNITNAME DATE COMPLETED BY ext.

1312 nit 1 8

l)ate Licenscc Event Rcport-Cp CP EA cn' O~

o l~

o Cause Er. ('orrcctivc Acth>n t>>

Prevent Rect>ffcncc 11/05/78 ll/10/78 ll/12/78 11/24/78 3.6 4.5 6.7 96 H

H Condensate Demin Change

¹12 Condensate Demit Change

¹13 Condensate Demin Change All Control Rods Full Out-Preconditioning F: F.>reed S: Scheduled

('>/77)

Reason:

A-Equipment Failure (Explain)

B-hiaintenance or Test C-Refueling D.Reiudatory Restriction I':Operator Trainint, k, License Fxatnination I -Adn>inistrat ivc (I.Operal>onal I:rf>>f(I:xplaln)

I I Other (Explair>)

~

hlcthod:

I hlanual 2-h(anual Scram.

3-Automatic Sera>n.

4.Other (Explain)

Exhibit G - Instructions for Prcparath>n of Data Entry Shc'ts I'or Licensee I:.v nt R p >rt (I.l!I()File(NURI!G-OI6I)

Exhibit I - Sa>nc Source

(J l *'

NIAGARA MOHAWK POWER CORPORATION NINE MILE POINT NUCLEAR STATION UNIT Pl NARRATIVE OF OPERATING EXPERIENCE November 1978 The station operated at 85.2/ electrical capacity factor with an availability of 100'5.

The unit is derated to 92.0A thermal power as a result of scram reactivity restrictions.

November 1-4 The unit operated at 92$ power maintained with recirculation flow.

November 5

November 6-9 Reduced load to 500 MWe for condensate demineralizer change at 0005.

At 0335 load was increased back to 558 MWe after demineralizer change.

The unit maintained 92% power with recirculation flow.

November 10 November 11 November 12 Reduced load to 500 MWe at 0130 for condensate demineralizer change.

At 0558 load was returned to 560 MWe after demineralizer change.

Unit was operated at 92/ power.

Reduced load to 500 MWe for condensate demineralizer change at 0132.

At 0648 load was'eturned after demineralizer change.

November 13-21 Maintained load at 92/ thermal power with recir-culation flow.

On the 21st, 100/ recirc flow was reached.

November 21-24 Load slowly coasted down until 0600 on the 24th when power was reduced to 350 MWe for control rod pattern change to an all rods out configuration.

At 0840 all control rods were at position 48.

At 1345 pre-conditioning started at a rate of approximately 3 MWe/hr.

November 24-27 November 28 November 29-30 Increasing load as PCIOMR limits allow.

Reached 92/ power (all rods out).

The unit maintained 92%%d power with recirculation flow.

Jk f