ML20064L267: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 30: Line 30:
==Dear Mr. O'Reilly:==
==Dear Mr. O'Reilly:==


On November 1, 1982, Mr. A. Hardin of the NRC was notified of a potentially reportable item per the provisions of 10CFR50.55(e).        In our November 30, 1982 letter, we stated this item was also potentially reportable per the provisions of 10CFR, Part 21; this, however, is not correct. Our Quality Assurance program did not accept the equipment through our QA program; therefore, this item is only potentially reportable per the provisions of 10CFR50.55(e).
On November 1, 1982, Mr. A. Hardin of the NRC was notified of a potentially reportable item per the provisions of 10CFR50.55(e).        In our {{letter dated|date=November 30, 1982|text=November 30, 1982 letter}}, we stated this item was also potentially reportable per the provisions of 10CFR, Part 21; this, however, is not correct. Our Quality Assurance program did not accept the equipment through our QA program; therefore, this item is only potentially reportable per the provisions of 10CFR50.55(e).
On November 30, 1982, we informed you that an evaluation of the cabinets would be complete by the later part of January and requested an extension until February 4, 1983 for completing the reportability evaluation. Since November, the vendor has done a seismic analysis to determine structural integrity of the cabinets as built. The report of this analysis has been received and is currently under evaluation. For this reason, we would request an extension until April 29, 1983 for submitting a report on the reportability of this item.
On November 30, 1982, we informed you that an evaluation of the cabinets would be complete by the later part of January and requested an extension until February 4, 1983 for completing the reportability evaluation. Since November, the vendor has done a seismic analysis to determine structural integrity of the cabinets as built. The report of this analysis has been received and is currently under evaluation. For this reason, we would request an extension until April 29, 1983 for submitting a report on the reportability of this item.
Tnanic you for your consideration in this matter.
Tnanic you for your consideration in this matter.

Latest revision as of 21:24, 31 May 2023

Interim Deficiency Rept Re Auxiliary Relay Cabinets. Initially Reported on 821101.Extension Requested for Final Rept to Allow for Evaluation of Vendor Seismic Analysis of Structural Integrity of Cabinets.Final Rept by 830429
ML20064L267
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 02/04/1983
From: Parsons R
CAROLINA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
CON-NRC-40 10CFR-050.55E, 10CFR-50.55E, NUDOCS 8302150177
Download: ML20064L267 (1)


Text

-

CNLL +

l Carolina Power & Light Company muumma P. O. Box 101, New Hill, N. C. 27562 February 4, 1983 j m

P1 -

=2  :'

Mr. Jameu P. O'Reilly NR5240 United States Nuclear Re gulatory Commission m Region II "

101 Marietta Street, Northwest (Suite 3100) . '*,

Atlaata. Georgia 30303

.e CAROLINA POWER & LIGHT COMPANY SHEARON HARRIS NUCLEAR POWER PLANT 1986 900,000 KW - UNITS 1 & 2 -

AUXILIARY RELAY CABINETS, NY-435246, ITEM 105

Dear Mr. O'Reilly:

On November 1, 1982, Mr. A. Hardin of the NRC was notified of a potentially reportable item per the provisions of 10CFR50.55(e). In our November 30, 1982 letter, we stated this item was also potentially reportable per the provisions of 10CFR, Part 21; this, however, is not correct. Our Quality Assurance program did not accept the equipment through our QA program; therefore, this item is only potentially reportable per the provisions of 10CFR50.55(e).

On November 30, 1982, we informed you that an evaluation of the cabinets would be complete by the later part of January and requested an extension until February 4, 1983 for completing the reportability evaluation. Since November, the vendor has done a seismic analysis to determine structural integrity of the cabinets as built. The report of this analysis has been received and is currently under evaluation. For this reason, we would request an extension until April 29, 1983 for submitting a report on the reportability of this item.

Tnanic you for your consideration in this matter.

Very truly yours, 97)?

R. M. Parsons Project General Manager Shearon Harris Nuclear Power Plant RMP/sh cc: Mr. G. Maxwell (NRC-SHNPP)

Mr. V. Stello (NRC)

TOFFICIAL CON PJO2150177 830204

~

Y PDR ADOCK 05000400 S PDR