|
---|
Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML18017A9151999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Shearon Harris Npp. with 991012 Ltr ML18017A8621999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Harris Nuclear Plant.With 990908 Ltr ML18017A8361999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Shearon Harris Nuclear Power Plant.With 990811 Ltr ML18016B0151999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Shearon Harris Npp. with 990713 Ltr ML18016A9851999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Shearon Harris Nuclear Plant,Unit 1.With 990614 Ltr ML18016A9581999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Shearon Harris Nuclear Plant,Unit 1.With 990513 Ltr ML18016A9101999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Shearon Harris Nuclear Power Plant.With 990413 Ltr ML18016A8551999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Shearon Harris Npp. with 990312 Ltr ML18016A8041999-01-31031 January 1999 Monthly Operating Rept for Jan 1999 for Shearon Harris Nuclear Power Plant.With 990211 Ltr ML18016A7801998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Shearon Harris Npp. with 990113 Ltr ML18016A7671998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Shnpp,Unit 1.With 981215 Ltr ML18016A7201998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Shearon Harris Nuclear Power Plant.With 981113 Ltr ML18016A6201998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Harris Nuclear Power Plant.With 981012 Ltr ML18016A5881998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Shnpp,Unit 1.With 980914 Ltr ML18016A5071998-07-31031 July 1998 Monthly Operating Rept for Jul 1998 for Shearon Harris Nuclear Plant.W/980811 Ltr ML18016A4861998-06-30030 June 1998 Monthly Operating Rept for June 1998 for SHNPP.W/980715 Ltr ML18016A4521998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Shearon Harris Nuclear Power Plant.W/980612 Ltr ML18022B0521998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Shearon Harris Nuclear Power Plant.W/980514 Ltr ML18016A3901998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for SHNPP.W/980414 Ltr ML18016A3511998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for SHNPP.W/980313 Ltr ML18016A3181998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Shearon Harris Nuclear Power Plant.W/980212 Ltr ML18016A2851997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Shearon Harris Nuclear Plant,Unit 1.W/980114 Ltr ML18016A2651997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Shearon Harris Nuclear Power Plant.W/971216 Ltr ML18016A2291997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Shearon Harris Nuclear Power Plant.W/971114 Ltr ML18016A2121997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Shearon Harris Nuclear Power Plant,Unit 1.W/971014 Ltr ML18016A1871997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Shearon Harris Nuclear Plant.W/970911 Ltr ML18012A8591997-07-31031 July 1997 Monthly Operating Rept for July 1997 for SHNPP.W/970813 Ltr ML18012A8321997-06-30030 June 1997 Monthly Operating Rept for June 1997 for Shearon Harris Nuclear Power Plant.W/970711 Ltr ML18012A8131997-05-31031 May 1997 Monthly Operating Rept for May 1997 for Shearon Harris NPP, Unit 1.W/970616 Ltr ML18012A7821997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Shearon Harris Nuclear Power Plant.W/970514 Ltr ML18012A6181997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Harris Nuclear Plant,Unit 1.W/970415 Ltr ML18012A5821997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Shearon Harris Nuclear Power Plant.W/970312 Ltr PY-CEI-NRR-2150, Monthly Operating Rept for Feb 1997 for PNPP1997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for PNPP ML18012A5141997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Shearon Harris Nuclear Power Plant.W/970214 Ltr ML18012A4651996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Shearon Harris Nuclear Power Plant.W/970110 Ltr ML18012A4431996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Shearon Harris Nuclear Power Plant.W/961211 Ltr ML18012A4291996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Shearon Harris Nuclear Power Plant.W/961113 Ltr ML18012A4001996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Shearon Harris Nuclear Power Plant.W/961014 Ltr ML18012A3601996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Shearon Harris Nuclear Power Plant.W/960911 Ltr ML18012A3321996-07-31031 July 1996 Monthly Operating Rept for Jul 1996 for Shearon Harris Nuclear Power Plant.W/960812 Ltr ML18012A2951996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Shearon Harris Nuclear Power Plant Unit 1.W/960711 Ltr ML18012A2731996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Shearon Harris Nuclear Power Plant.W/960614 Ltr ML18012A2441996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for Harris Nuclear Plant.W/960513 Ltr ML18012A2091996-03-31031 March 1996 Monthly Operating Rept for Mar 1996 for Harris Nuclear Plant.W/960410 Ltr ML18012A1711996-02-29029 February 1996 Monthly Operating Rept for Feb 1996 for Harris Nuclear Plant.W/960311 Ltr ML18012A1271996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for Shearon Harris Nuclear Power Plant.W/960209 Ltr ML18011B0971995-12-31031 December 1995 Monthly Operating Rept for Dec 1995 for SHNPP.W/960110 Ltr ML18011B0821995-11-30030 November 1995 Monthly Operating Rept for Nov 1995 for Shearon Harris Nuclear Power Plant.W/951213 Ltr ML18011B0491995-10-31031 October 1995 Monthly Operating Rept for Oct 1995 for Shearon Harris Nuclear Power Plant.W/951109 Ltr ML18011B0261995-09-30030 September 1995 Monthly Operating Rept for Sept 1995 for Harris Nuclear Plant.W/951012 Ltr 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML18017A9181999-10-0808 October 1999 LER 99-008-00:on 991008,CR Emergency Filtration Sys Tech Specs Occurred.Caused by Site Personnel Failed to Recognize That Blocking Open CR Emergency Filtration Sys.Procedures Revised.With 991008 Ltr ML18017A9151999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Shearon Harris Npp. with 991012 Ltr ML20217A9931999-09-30030 September 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data ML18017A8671999-09-10010 September 1999 LER 99-007-00:on 990811,determined That Cvis ARMs High Alarm Setpoints Were Not within TS Limit.Caused by Not Having Procedure to Verify If Cvis ARM High Alarm Setpoints Were within TS Requirements.Revised Procedures.With 990910 Ltr ML18017A8621999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Harris Nuclear Plant.With 990908 Ltr ML18016B0481999-08-0404 August 1999 LER 99-006-01:on 981124,noted Failure to Comply with TS 4.0.4 & TS 3/4.6.3, Civs. Caused by post-maint Testing That Did Not Adequately Test Control Circuitry & Verify Isolation Time Following Maint.Procedure Was Revised ML18017A8361999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Shearon Harris Nuclear Power Plant.With 990811 Ltr ML18016B0151999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Shearon Harris Npp. with 990713 Ltr ML20196H8621999-06-30030 June 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept ML18016A9801999-06-0404 June 1999 LER 99-006-00:on 981124,failed to Comply with TS 4.0.4 & TS 3/4.6.3, Civ. Caused by post-maint Testing That Did Not Adequately Test Control Circuitry & Verify Isolation Time Following Maint.Procedure Will Be Revised.With 990604 Ltr ML18016A9851999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Shearon Harris Nuclear Plant,Unit 1.With 990614 Ltr ML18017A8981999-05-12012 May 1999 Technical Rept Entitled, Harris Nuclear Plant-Bacteria Detection in Water from C&D Spent Fuel Pool Cooling Lines. ML18016A9581999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Shearon Harris Nuclear Plant,Unit 1.With 990513 Ltr ML18016A9011999-04-12012 April 1999 Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected ML18016A9111999-04-12012 April 1999 LER 99-005-00:on 990313,plant Exceeded ESFAS TS 3.3.2,Action 21.Caused by Inadequate Procedure Rev Preparation.Licensee Revised Applicable Maint Surveillance Test Procedure (MST-10072) to Identify TS Required Actions.With 990412 Ltr ML18016A8971999-04-0808 April 1999 LER 99-004-00:on 990312,unit Trip Was Noted.Caused by Degraded Condition of SG Water Level Flow Control Valve. Replaced Positioners on All Three FW Regulating Valves.With 990408 Ltr ML18016A8941999-04-0505 April 1999 Revised Pages 20-25 to App 4A of non-proprietary Version of Rev 3 to HI-971760 ML18016A9101999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Shearon Harris Nuclear Power Plant.With 990413 Ltr ML18016A8661999-03-31031 March 1999 Shnpp Operator Training Simulator,Simulator Certification Quadrennial Rept. ML18017A8931999-02-28028 February 1999 Risks & Alternative Options Associated with Spent Fuel Storage at Shearon Harris Nuclear Power Plant. ML18016A8551999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Shearon Harris Npp. with 990312 Ltr ML18016A8261999-02-22022 February 1999 LER 99-003-00:on 990123,noted That Plant Was Outside Design Basis Due to Isolation of Fire Protection Containment Sprinkler Sys.Caused by Human Error.Restored Containment Sprinkler Sys to Operable Status.With 990222 Ltr ML18016A8531999-02-18018 February 1999 Non-proprietary Rev 3 to HI-971760, Licensing Rept for Expanding Storage Capacity in Harris SFP 'C' & 'D'. ML18016A8111999-02-12012 February 1999 LER 99-002-00:on 990114,RT Due to Not Removing Temporary Device from Relay Following Calibration Was Noted.Caused by Human Error.Counseled Personnel Involved in Event.With 990212 Ltr ML18016A7971999-02-0505 February 1999 LER 99-001-00:on 990106,SF Pool Water Level Was Not Maintained Greater than 23 Feet Above Stored BWR Fuel Assemblies.Caused by Fasteners Bending Under Specific Circumstances.Increased Water Level.With 990205 Ltr ML18022B0631999-02-0404 February 1999 Rev 0 to Nuclear NDE Manual. with 28 Oversize Uncodable Drawings of Alternative Plan Scope & 4 Oversize Codable Drawings ML20202J1161999-02-0101 February 1999 SER Accepting Relief Requests Associated with Second 10-year Interval Inservice Testing Program ML18016A8041999-01-31031 January 1999 Monthly Operating Rept for Jan 1999 for Shearon Harris Nuclear Power Plant.With 990211 Ltr ML18016A7941999-01-29029 January 1999 LER 98-004-01:on 980313,identified Design Deficiency Re Potential Runout of Tdafwp.Caused by Inadequate Original AFW Sys Design.Operability Evaluation Was Completed on 980313 & Addl Engineering Analysis Was Performed by Vendor ML18016A7801998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Shearon Harris Npp. with 990113 Ltr ML18016A7671998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Shnpp,Unit 1.With 981215 Ltr ML18016A9731998-11-28028 November 1998 Changes,Tests & Experiments, for Harris Nuclear Plant.Rept Provides Brief Description of Changes to Facility & Summary & of SE for Each Item That Was Implemented Under 10CFR50.59 Between 970608-981128.With 990527 Ltr ML18016A8351998-11-28028 November 1998 ISI Summary 8th Refueling Outage for Shearon Harris Power Plant,Unit 1. ML18016A7411998-11-25025 November 1998 Rev 1 to Shnpp Cycle 9 Colr. ML18016A7211998-11-17017 November 1998 LER 98-007-00:on 981023,turbine Control Anomaly Caused Manual Rt.Caused by Failure to Incorporate Verbal Vendor Guidance in Operating Procedures.Addl Vendor Guidance Will Be Verified & Added to Procedures.With 981117 Ltr ML18016A7071998-11-0303 November 1998 Rev 0 to Harris Unit 1 Cycle 9 Colr. ML18016A7201998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Shearon Harris Nuclear Power Plant.With 981113 Ltr ML20154F8701998-10-0606 October 1998 Safety Evaluation Authorizing Proposed Alternative to Requirements of OMa-1988,Part 10,Section 4.2.2.3 for 21 Category a Reactor Coolant Sys Pressure Isolation Valves ML18016A6201998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Harris Nuclear Power Plant.With 981012 Ltr ML18016A5971998-09-21021 September 1998 Rev 1 to Harris Unit 1 Cycle 8 Colr. ML18016A5881998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Shnpp,Unit 1.With 980914 Ltr ML18016A5071998-07-31031 July 1998 Monthly Operating Rept for Jul 1998 for Shearon Harris Nuclear Plant.W/980811 Ltr ML18016A9431998-07-0707 July 1998 Rev 1 to QAP Manual. ML18016A4841998-07-0707 July 1998 LER 97-002-01:on 970207,determined That Cold Weather Conditions Resulted in Mfiv Being Potentially Inoperable During Period 970117-20.Caused by Inadequate Design of HVAC Sys.Implemented Mods to Steam Tunnel HVAC Sys ML18016A9371998-06-30030 June 1998 Technical Rept on Matl Identification of Spent Fuel Piping Welds at Hnp. ML18016A4861998-06-30030 June 1998 Monthly Operating Rept for June 1998 for SHNPP.W/980715 Ltr ML18016A4701998-06-30030 June 1998 LER 97-021-03:on 980210,discovered That SFP Water Level Had Not Been Verified Greater than 23 Feet Above BWR Fuel Assemblies.Caused by Misinterpretation of TS Requirements. Will Submit TS Change Request to Revise TS 3.9.1.11 ML18016A4491998-06-0808 June 1998 LER 98-006-00:on 980508,failure to Perform Insp & Preventive Maint on MCCB as Required by TS Was Noted.Caused by Inadequate Sps.Tested 9 Pressurizer Heater Bank Breakers by Cycling each.W/980608 Ltr ML18016A4521998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Shearon Harris Nuclear Power Plant.W/980612 Ltr ML18016A7711998-05-26026 May 1998 Non-proprietary Rev 2 to HI-971760, Licensing Rept for Expanding Storage Capacity in Harris Spent Fuel Pools 'C' & 'D'. 1999-09-30
[Table view] |
Text
carzaoar 1 REGULATO Y INFORMATION DISTRIBUTIO SYSTEM (RIDS)
II FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH. NAME AUTHOR AFFILIATION ROGERS,S. Carolina Power & Light Co.
ALEXANDER,D.B. Carolina Power &. Light Co.
RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
Monthly operating re Nuclear Plant, Unit. .With'or t
90513 ltr. Shearon Harris DISTRIBUTION CODE: IE24D COPIES RECEIVED,:LTR TITLE: Monthly Operating Report (per Tech Specs)
I ENCL J SIZE:
NOTES:Application"for permit renewal filed. 05000400 E RECIPIENT, COPIES ,RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL LPD2-2 PD 1 1 LAUFER,R. 1 1 INTERNAL: ACRS 1 '
1 AEOD/SPD/RRAB 1 1 CENTER 0 1 OC/DBA/PAD 1 1 1 1 EXTERNAL: LMITCO MARSHALL 1 1 NOAC NRC PDR 1 1 D
'E NOTE TO ALL "RZDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE.'TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT LISTS THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10
Carolina Power & Ught Company Harris Nocloar Plant P.O. Box 165 New Hill NC 27562 MAY 13 1999 United States Nuclear Regulatory Commission Serial: HNP-99-089 ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 MONTHLYOPERATING REPORT
Dear Sir or Madam:
In accordance with Carolina Power & Light Company's Harris Nuclear Plant Technical Specification 6.9.L5, the report of operating statistics and shutdown experience for the month of April 1999 is provided.
Sincerely, D. B. Alexander Manager, Regulatory Affairs Harris Plant SGR Enclosure Mr. J. B. Brady - NRC Senior Resident Inspector Mr. R. J. Laufer - NRC Project Manager Mr. L. A. Reyes - NRC Regional Administrator 5413 Shearon Harris Road Now Hill NC
~
~.:r'(.r:if'7905200i54 990430 PDR R
ADQCK 05000400 PDR L
'l
1 ~
'7
Enclosure to Serial HNP-99-089 Sheet I of 2 CP&L CO. PLANT PERFORMANCE DATA SYSTEM PAGE 1 RUN DATE 05/05/99 OPERATING DATA REPORT RPD36-000 RUN TIME 10:34:28 HARRIS UNIT 1 DOCKET NO. 050-400 COMPLETED BY SHEXLA ROGERS OPERATZNG STATUS TELEPHONE (919)362-2573
- 1. UNIT NAME: HARRIS UNIT 1
- 2. REPORTING PERXOD: APRI'L 99
- 3. LICENSED THERMAL POWER (MWT): 2775
- 4. NAMEPLATE RATING (GROSS MWE): 950.9
- 5. DESIGN ELECTRICAL RATING (NET KfE): 900.0
- 6. MAX DEPENDABLE CAPACITY (GROSS MWE): 920.0
- 7. MAX DEPENDABLE CAPACITY (NET MWE): 860.0
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRXCTED XF ANY (NET MWE):
- 10. REASONS FOR RESTRICTION ZF ANY:
THIS YR TO CUMUL MONTH DATE ATIVE
- 11. HOURS IN REPORTING PERIOD 719.00 2879.00 105168.00
- 12. NUMBER OF HOURS REACTOR CRITICAL 719.00 2717.60 88943.21
- 13. REACTOR RESERVE SHUTDOWN HRS .00 .00 .00
- 14. HOURS GENERATOR ON LINE 719.00 2643.11 88028.72
- 15. UNIT RESERVE SHUTDOWN HOURS .00 .00 .00
- 16. GROSS THERMAL ENERGY GEN. (MWH) 1990967.04 7140971.88 236560695.84
- 17. GROSS ELEC. ENERGY GEN (MWH) 663910.00 2388368.00 78732405.00
- 18. NET ELEC. ENERGY GENERATED (MWH) 625015.00 2234161.00 73471033.00
- 19. UNIT SERVICE FACTOR 100.00 91.81 83.70
- 20. UNIT AVAILABILXTYFACTOR 100.00 91.81 83.70
- 21. UNIT CAP. FACTOR (USING MDC NET) 101.08 90.23 81.23
- 22. UNIT CAP. FACTOR (USING DER NET) 96.59 86.22 77.62
- 23. UNIT FORCED OUTAGE RATE .00 8.19 3.26
- 24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
- 25. ZF SHUTDOWN AT END OF REPORT PERIOD, ESTXMATED DATE OF START UP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERAT1ON): FORECAST ACHIEVED INITIAL CRITICALITY ZNZTXAL ELECTRICITY COMMERCIAL OPERATION 1.16 - 9
4 p~
4 l
Enclosure to Serial: HNP-99-089 Sheet 2 of 2 CP&L CO. PLANT PERFORMANCE DATA SYSTEM PAGE 1 RUN DATE 05/05/99 APPENDIX B - AVERAGE DAILY POWER LEVEL RPD39-000 RUN TIME 10:34:28 HARRIS UNIT 1 DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362-2573 APRIL 1999 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET) (MWE-NET) 864 17 876 864 18 877 864 19 876 859 20 870 870 21 871 874 22 860 865 23 859 861 871 857 25 876 10 868 26 871 868 27 866 12 872 28 877 13 877 29 875 875 30 874 869 16 871
0 (o V
I, s w &r.. x ~ v.