ML18017A915

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Sept 1999 for Shearon Harris Npp. with 991012 Ltr
ML18017A915
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 09/30/1999
From: Alexander D, Shannon Rogers
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HNP-99-151, NUDOCS 9910190154
Download: ML18017A915 (7)


Text

CATEGORY 1 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

DOCKET I FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH.N~E , AUTHOR AFFILIATION ROGERS,S.G. Carolina Power & Light Co.

ALEXANDER,D.B. Carolina Power & Light Co.

RECIP.NAME RECIPIENT AFFILXATION

SUBJECT:

Mon rept for Sept 1999 for Shearon Harris NPP. C, With 991012 ltr DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: OR Submittal: General Distribution NOTES:Application for permit renewal filed. 05000400 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL 0 DUNNINGTON,E 1 1 LAUFER,R. 1 1 SC 1 1 R INTERNAL: ACRS 1 1 PILE CENTER 01 1 1 Y NRR/DSSA/SPLB 1 1 R/DID/SRXB 1 1 NUDOCS-ABSTRACT 1 1 OGC/RP 1 0 EXTERNAL: NOAC 1 1 NRC PDR 1 1 D

U

'E NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, DISTRIBUTION LISTS CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF. COPIES REQUIRED: LTTR 11 ENCL 10

CM Carolina Power & Ugbt Company Harris NucIear Plant PO Box 165 New Hill NC 27562 OCT 12 1999 Serial: HNP-99-151 United States Nuclear Regulatory Commission A ITENTION: Document Control Desk Washington, DC 20555 SHEARON HARMS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 MONTHLYOPERATING REPORT

Dear Sir or Madam:

In accordance with Carolina Power, &, Light Company's Harris Nuclear Plant Technical Specification 6.9.1.5, the report of oper'ating statistics and shutdown experience for the month of September 1999 is provided.

Sincerely, D. B. Alexander Manager, Regulatory Affairs Harris Plant SGR Enclosure 1

c: ~

.Mr. J. B. Brady - NRC Senior Resident Inspector Mr. R. J. Laufer - NRC Project Manager Mr. L. A. Reyes - NRC Ret innal Arlministrator 99'i0'i90i54 990930 PDR ADQCK 05000400 R PDR 3.80039 5413 Shearon Harris Road New Hill NC

Enclosure to Serial HNP-99-151 Sheet 1 of 3 cprcL co. PLANT PERFORMANCE DATA SYSTEM PAGE 1 RUN DATE 10/04/99 OPERATING DATA REPORT RPD36-000 RUN TIME 11:04:09 HARRIS UNIT 1 DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS OPERATING STATUS TELEPHONE (919)362-2573

1. UNIT NAME: HARRIS UNIT 1
2. REPORTING PERIOD: SEPTEMBER 99
3. LICENSED THERMAL POWER (MWT): 2775
4. NAMEPLATE RATING (GROSS MWE): 950.9
5. DESIGN ELECTRICAL RATING (NET MWE): 900.0
6. MAX DEPENDABLE CAPACITY (GROSS MWE): 920.0
7. MAX DEPENDABLE CAPACITY (NET M(')E): 860.0
8. IF CHANGES OCCUR ZN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE):
10. REASONS FOR RESTRICTION ZF ANY:

THIS YR TO CUMUL MONTH DATE ATIVE

11. HOURS IN REPORTING PERIOD 720.00 6551.00 108840.00
12. NUMBER OF HOURS REACTOR CRITICAL 720.00 6389.60 92615.21
13. REACTOR RESERVE SHUTDOWN HRS .00 .00 .00
14. HOURS GENERATOR ON LINE 720.00 6315.11 91700.72
15. UNIT RESERVE SHUTDOWN HOURS .00 .00 .00
16. GROSS THERMAL ENERGY GEN. (MWH) 1976041.98 17288787.24 246708511.20
17. GROSS ELEC. ENERGY GEN (MWH) 652857.00 5729843.00 82073880.00
18. NET ELEC. ENERGY GENERATED (MWH) 613915.00 5374650.00 76611522.00
19. UNIT SERVICE FACTOR 100.00 96.40 84.25
20. UNIT AVAILABILZTYFACTOR 100.00 96.40 84.25
21. UNZT CAP. FACTOR (USING MDC NET) 99.15 95.40 81.85
22. UNIT CAP. FACTOR (USING DER NET) 94.74 91.16 78.21
23. UNIT FORCED OUTAGE RATE .00 3.60 3.13
24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
25. ZF SHUTDOWN AT END OF REPORT PERIOD, ESTZMATED DATE OF START UP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1.16 - 9

Enclosure to Serial: HNP-99-151 Sheet 2of 3 CP&L CO. PLANT PERFORMANCE DATA SYSTEM PAGE 1 RUN DATE 10/04/99 APPENDIX B AVERAGE DAILY POWER LEVEL RPD39-000 RUN TIME 11:04:11 HARRIS UNIT 1 DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362-2573 SEPTEMBER 1999 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET) (MWE-NET) 863 17 867 857 18 866 855 19 865 853 20 861 855 21 859 851 22 870 853 23 870 852 24 865 806 25 862 10 725 26 856 842 27 856 12 861 28 856 861 29 856 857 30 868 15 854 16 859

Enclosure to Serial: HNP-99-151, Sheet 3 of 3 UNITSHUTDOWNS AND POWER REDUCTION UNIT NAMF Harris DATE: 04/01/99 COMPLETED BY: S. G. Rogers TELEPHONF'919) 362-2573 REPORT MONTH: March 1999 CAUSE AND CORRECTIVE MErHOD OF LICENSEE ACTIONTO DURATION SHUITING DOWN EVENT SYSTEM COMPONENT PREVENT RECURRENCE NUMBER DATE TYPE I (HOURS REASON 2 REACI'OR 3 REPORT ¹ CODE 4 CODE 5 Plant reduced power to 86%

09/09/99 0.0 NA HH VALVEX at 14:09 on 9/9/99 when (3)

Preheater Bypass Valves simultaneously closed.

Repairs were made and plant on 9/11/99 I was returned to 100% power 06:00.

I 2 3 4 F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) I-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licenscc Event Report C-Refueling 3-Automatic Scram (LER) File D-Regulatory Restriction 4-Continued (NUREG-0161)

E-Operator Training & License Examination 5-Rcduccd Load F-Administrative 6-Other 5 G-Operational Error (Explain) Exhibit I - Same Source H-Other (Explain)

{ i ~ r r

t'>>