ML18016A486

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for June 1998 for SHNPP.W/980715 Ltr
ML18016A486
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 06/30/1998
From: Donahue J, Shannon Rogers
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HNP-98-096, HNP-98-96, NUDOCS 9807220232
Download: ML18016A486 (5)


Text

CATEGORY 1 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

DOCKET FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH.NAME w AUTHOR AFFILIATION ROGERS,S. Carolina Power E Light Co; DONAHUE,J.W. Carolina Power &. Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for June 1998 for SHNP 980715 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR'NCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs T

NOTES:Application for permit renewal filed. 05000400 E

RECIPIENT COPIES RECIPIENT COPIES XD CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 PD 1 '

'LANDERS,S 1 1 0 INTERNAL: ACR 1 1 AEOD/SPD/RRAB 1 1 LE CENTER 01 1 ' 1 OC/DBA/PAD 1 1 RGN2 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 D

N NOTE TO ALL "RZDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEZVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPXES REQUIRED: LTTR 10 ENCL 10

0 T Carolina Power & light Contpany Harris Nuclear Plant PO Box 165 New Hill NC 27562 JUL 1 S 1998 United States Nuclear Regulatory Commission Serial: HNP-98-096 ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 MONTHLYOPERATING REPORT

Dear Sir or Madam:

In accordance with Carolina Power & Light Company's Harris Nuclear Plant Technical Specification 6.9.1.5, the report of operating statistics and shutdown experience for the month of June 1998 is provided.

Sincerely, J W. Donahue Director of Site Operations Harris Plant SGR Enclosure c: Mr. J. B. Brady - NRC Senior Resident Inspector Mr. S. C. Flanders - NRC Project Manager Mr. L. A. Reyes - NRC Regional Administrator

'st807220232 'st80630 PDR ADQCK 05000400 R PDR State Road 1134 New Hill NC

Enclosure to Serial HNP-98-096 Sheet l of 2 CP&L CO. PLANT PERFORMANCE DATA SYSTEM PAGE 1 RUN DATE 07/06/98 OPERATING DATA REPORT RPD36-000 RUN TIME 10:07:19 HARRIS UNIT 1 DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS OPERATXNG STATUS TELEPHONE (919)362-2573

1. UNIT NAME: HARRIS UNIT 1
2. REPORTING PERIOD: JUNE 98
3. LICENSED THERMAL POWER (MWT): 2775
4. NAMEPLATE RATING (GROSS MWE): 950.9
5. DESIGN ELECTRICAL RATING (NET MWE): 900.0
6. MAX DEPENDABLE CAPACITY (GROSS MWE): 920.0
7. MAX DEPENDABLE CAPACITY (NET MWE): 860.0
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE):
10. REASONS FOR RESTRICTION IF ANY:

THIS YR TO CUMUL MONTH DATE ATIVE

11. HOURS IN REPORTING PERIOD 720.00 4343.00 97872.00
12. NUMBER OF HOURS REACTOR CRITICAL 720.00 4343.00 82652.71
13. REACTOR RESERVE SHUTDOWN HRS .00 .00 .00
14. HOURS GENERATOR ON LINE 720.00 4343.00 81836.54
15. UNIT RESERVE SHUTDOWN HOURS .00 .00 .00
16. GROSS THERMAL ENERGY GEN. (MWH) 1993704.30 11969345.34 219804122.52
17. GROSS ELEC. ENERGY GEN (MWH) 653799.00 3991101.00 73172905.00
18. NET ELEC. ENERGY GENERATED (MWH) 614081.00 3749303.00 68274608.00
19. UNXT SERVICE FACTOR 100.00 100.00 83.62
20. UNXT AVAILABILITYFACTOR 100. 00 100.00 83.62
21. UNIT CAP. FACTOR (USING MDC NET) 99. 17 100.38 81.12
22. UNIT CAP. FACTOR (USING DER NET) 94.77 95.92 77.51
23. UNIT FORCED OUTAGE RATE .00 .00 3.22
24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

Plant Refueling Outage number 8 is planned to begin October 24, 1998, and is scheduled for a duration of 34 days.

25. 1F SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
26. UNITS XN TEST STATUS (PRIOR TO COMMERCIAL OPERATXON): FORECAST ACHIEVED INITIAL CRITICALITY INITXAL ELECTRICITY COMMERCIAL OPERATION 1.16 - 9

\

~

+ ~

~I Enclosure to Serial: HNP-98-096 Sheet 2 of2 CP&L CO. PLANT PERFORMANCE DATA SYSTEM PAGE 1 RUN DATE 07/06/98 APPENDIX B " AVERAGE DAILY POWER LEVEL RPD39-000 RUN TIME 10:07:18 HARRIS UNIT 1 DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362-2573 JUNE 1998 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET) (MWE-NET) 851 17 852 854 18 853 850 19 849 861 20 853 858 21 853 865 22 850 871 23 850 868 24 850 863 25 849 10 857 26 854 27 843 12 848 28 846 13 850 29 848 858 30 845 15 849 16 845