 Issue dateTitleTopic
ML18016A90112 April 1999Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected
ML20140G4481 May 1997Part 21 Rept Re Potential Defect in Component of Dsrv & Dsr Enterprise Standby Diesel Generator Sys.Recommends That Springs Be Inspected on Periodic Basis,Such as During Refueling Outages
ML20115D2009 July 1996Part 21 Rept Re Mfg Defect of Enterprise DSR-4 & DSRV-4 Edgs,Originally Mfg by Calcon Corp.Amot Control Corp Purchased Calcon Product Line & Maintains Design & Production.Valves Returned to Cooper Energy Svcs on 960131
ML20117G46414 May 1996Part 21 Rept Re Cooper Bessemer Reciprocating Products,Div of Cooper Cameron Corp,Issued Ltr to Define Utils/Plants Containing Similar Equipment as Supplied on Cooper Bessemer Ksv & Enterprise Dsr EDGs
ML18022A97029 September 1995Part 21 Rept Re Failure of Charging SI Pump Miniflow Check Valves.Caused by Cocking of Piston Towards Valve Outlet Port Due to Large Hydraulic Surge.Valves That Experienced Failures ReplacedBoric Acid
Hydrostatic
Anchor Darling
Stress corrosion cracking
Eddy Current Testing
ML20059H77217 January 1994Part 21 Rept Re Virginia Power Notifying Fairbands Morse Via Failure Analysis Rept NESML-Q-058 of Defective Air Start Distributor cam,16104412
ML20059F2637 January 1994Part 21 Rept Re Air Start Distributor Cam Mfg by Fairbanks Morse.Mfg Suggests That Site Referenced in Encl App I Inspect Air Start Distributor Cam as Soon as Practical
ML20058K3849 December 1993Part 21 Rept Re Potential Defect in Component of Dsrv & Dsr Enterprise Standby DG Sys,Regarding Potential Problem W/ Subcover Assembled Atop Power Head
ML20127H23015 January 1993Part 21 Rept Re Potential Defeat in Component of Dsrv & Dsr Enterprise Standby DG Sys.Starting Air Distributor Housing Assemblies Installed as Replacement Parts at Listed Sites
ML20126J59631 December 1992Part 21 Rept Re Potential Loss of RHR Cooling During Nozzle Dam Removal.Nozzle Dams May Create Trapped Air Column Behind Cold Leg Nozzle Dam.Mod to Nozzle Dams Currently Underway. Ltrs to Affected Utils EnclHydrostatic
ML20126B04217 December 1992Final Part 21 Rept Re Potential Problem W/Steel Cylinder Heads.Initially Reported on 921125.Caused by Inadequate Cast Wall Thickness at 3/4-inch-10 Bolt Hole.Stud at Location Indicated on Encl Sketch Should Be RemovedLoctite
ML20125C7167 December 1992Part 21 Rept Re Possibility for Malfunction of Declutching Mechanisms in SMB/SB-000 & SMB/SB/SBD-00 Actuators. Malfunction Only Occurs During Seismic Event.Balanced Levers May Be Purchased from Vendor.List of Affected Utils EnclStroke time
Anchor Darling
ML20127P58623 November 1992Followup to 921005 Part 21 Rept Re Potential Defect in SB/SBD-1 Housing Cover Screws.Procedure Re Replacement of SBD-1 Spring Cover Bolts Encl.All Fasteners Should Be Loosened & Removed.List of Affected Utils Encl
ML17289A69726 June 1992Amend 1 to Part 21 Rept 158 Re gear-wear Induced Failures in engine-driven Jacket Water Pump in DSRV-16-4 Standby DG Sys. Initially Reported on 911029.Grand Gulf Station Observed Wear Characteristics in as Little as 500 Operating Hours
ML18010A57023 March 1992Initial Part 21 Rept Re Defect in Anchor Darling Supplied Main Feedwater Preheater Bypass Isolation Valves.On 920112, All non-Q Components Replaced W/Suitable Components & Tested Satisfactorily.Next Rept Will Be Submitted by 920214Anchor Darling
ML20094L12713 March 1992Amend 1 to Part 21 Rept 159 Re Potential Defect in Power Cylinder Liner.Initially Reported on 920115.Caused by Liner/ Block Fit & Localized Matl Microstructure.All Drawings & Specs Revised to Address Matl Design Requirements
ML18010A50716 January 1992Initial Part 21 Rept Re Deficiency in Actuator to Main Feedwater Preheater Bypass Isolation Valves.On 920107,2 H Surveillance Interval Was Commenced to Verify Actuator Components Were Functioning Properly
ML20005G6835 January 1990Part 21 Rept Re Installation Instructions for Grommet Use Range for Patel Conduit Seal P/N 841206.Conduit Seals in Environ Qualification Applications Inspected for Proper Wire Use Range & Grommets Replaced
ML20248E01213 September 1989Supplemental Part 21 Rept Re Potential Problem W/Six Specific Engine Control Devices in Air Start,Lube Oil, Jacket Water & Crankcase Sys.Initially Reported on 890429. California Controls Co Will Redesign Valve Seating
ML18005B03225 August 1989Potential Part 21 Rept Re ITE-Siemens molded-case Circuit Breakers Not Holding Required Load,Resulting in Inoperability.Motor in-rush Current Tests Will Be Performed on S-4 Motor to Determine If Correct Breaker UtilizedCommercial Grade
ML18005B00826 July 1989Part 21 Rept Re Potential Failure of Main Steam PORVs Supplied by Control Components,Inc.Initially Reported on 890719.Cause of Failure Speculated to Be Dirt or Corrosion Particles Preventing Ring from Sealing.Porv Trim ModifiedSafe Shutdown
ML20247P7994 April 1989Part 21 Rept Re Atmospheric Dump Valves.Cause of Failure Speculative But Result of Piston Ring That Failed to Seal. Resolution to Problem Requires Increasing Pilot Valve Capacity & Reworking of Plug to Enlarge Pilot Flow Area
ML20207P0455 October 1988Part 21 Rept 146 Re Defect in Left Intercooler Inlet Adapter on Standby Diesel Engine Generator.Recommends Utils Inspect Left Intake Manifold Drain as Part of Operating Plan.Addl Info Expected by 881015
ML18005A65529 September 1988Part 21 Rept Re Deficiency in Control & Power Circuits for Dc motor-operated Valves Due to Lack of Surge Protection. Initially Reported on 880518.Interim Measures Established to Ensure Proper Operation of Valves Until Surge Installed
ML18005A44018 May 1988Part 21 Rept Re Dc Motor Failure on Auxiliary Feedwater Limitorque Operated Valves.Plant Mod Will Be Implemented to Install Surge Protection for Shunt Coil Circuitry of Subject Dc MotorsOverspeed trip
ML20154J41012 May 1988Addendum 1 to Supplemental Part 21 Rept 145 Re Potential Problem w/F-573-156 Pressure Sensor/Lube Oil Trip.Initially Reported on 880429.Addl 1-1/8-inch Diameter W/Deep Counterbone in Pressure Head Added to Activate Valve
ML20153B61929 April 1988Part 21 Rept Re Potential Defect in Component of Dsr or Dsrv Standby Diesel Generators Supplied to Utils.Recommends Return of Subj Components in Onsite Warehouse Storage & Suggests Surveillance of Devices Already Installed
ML18004B94622 September 1987Part 21 Rept Re Failure to Postulate Unavailability of Vital Dc Bus in Conjunction W/Auxiliary Feedwater (AFW) Isolation Design.Afw Isolation Logic Modified W/Westinghouse Involvement.Operation Will Resume Upon Completion of ModsUnanalyzed Condition
ML18004B8701 July 1987Part 21 & Deficiency Rept Re LOCA Occurring During Modes 3 & 4.Initially Reported on 860815.Completion Date for Item Cannot Be Determined Due to Continued Westinghouse Owners Group Effort
ML20234C73523 June 1987Supplemental Part 21 Rept Re Silicone Foam Seal Anomolies at Wolf Creek Generating StationFire Watch
ML20216E47228 May 1987Part 21 Rept 140 Re Potential Defect in Air Pressure Regulators Mfg by Bellofram.Dripwell Gasket May Fail Due to Mismachining of Gasket Seating Surface Causing Loss of Control Air & Starting Air Pressure
ML20207R70311 March 1987Part 21 Rept Re Potential Defect in Static Exciter Voltage Regulator (Sevr) Reset Design.Recommends Mod to Control Circuits to Energize Sevr Upon Receipt of Emergency Start Signal.Mods Will Be Completed by 870331
ML20211P72123 February 1987Part 21 Rept Re Rockbestos Coaxial Cable Used in Sorrento Electronics Digital & Analog high-range Radiation Monitor. Insulation Resistance at High Temp Not High Enough for Ion Chamber & Associated Electronics to Operate Properly
ML20210E7904 February 1987Part 21 Rept Re Incorrect Operation of Hfa Auxiliary Relays, Per 861114 GE Svc Advice Ltr 188.1.Relays Installed in Standby Diesel Generator Sys Af Plant.Svc Ltr Forwarded to Util
ML20215F00412 December 1986Final Deficiency Rept,Item 233 Re Quantity of Electrical Separation Interactions That Remained Undetected After Installation Insp.Initially Reported on 860822.Remaining Separation Interactions Identified,Reworked & Reinspected
ML20213F81010 November 1986Interim Deficiency Rept,Item 233,re Electrical Separation. Initially Reported on 860822.Addl Time Necessary to Submit Final Rept.Final Rept Expected on 861210
ML20215K53014 October 1986Deficiency Rept,Item 234 Re Structural Steel Welds Not Meeting Project Acceptance Criteria.Initially Reported on 860921.Item Not Reportable Per 10CFR50.55(e) & 10CFR21, Confirming 861014 Telcon
ML20215K56514 October 1986Deficiency Rept,Item 231 Re Use of Hylomar Thread Sealant in Stainless Steel Applications.Initially Reported on 860814. Item Not Reportable Per 10CFR50.55(e) Confirming 861014 Telcon
ML20215G68010 October 1986Part 21 Rept Re Vendor Tests of air-operated Diaphragm Valves Revealing Natural Frequencies Less than Required Values of 33 Hz.Initially Reported on 841227.No Adverse Effects Noted During TestingStroke time
ML20215G53510 October 1986Part 21 Rept Re Vendor Tests of air-operated Diaphragm Valves Revealing Natural Frequencies Less than Required Values of 33 Hz.Initially Reported on 841227.No Adverse Effects Noted During TestingStroke time
ML20214K4133 October 1986Interim Deficiency Rept,Item 233 Re Electrical Separation. Initially Reported on 860822.Final Rept Will Be Issued by 861110
ML20214K85829 September 1986Interim Deficiency Rept,Item 231 Re Hylomar Thread Sealant Exceeding Acceptable Chloride Limits.Initially Reported on 860814.Addl Time Required to Complete Testing.Next Rept Delayed Until 861010
ML20206U66619 September 1986Interim Deficiency Rept,Item 233 Re 12 Electrical Separation Interactions on Two Conduits in Fuel Handling Bldg.Initially Reported on 860822.Separation Interactions Reworked & Reinsp.Next Rept Will Be Submitted by 861003
ML20210D63011 September 1986Part 21 & Deficiency Rept,Item 232 Re LOCA Occurring During Modes 3 & 4.Initially Reported on 860815.Util Will Pursue Resolution W/Westinghouse Owners Group.Next Rept Will Be Submitted by 870701
ML20210D53011 September 1986Deficiency Rept,Item 231 Re Hylomar Thread Sealant Used in Stainless Steel Applications Found to Exceed Acceptable Chloride Limits.Initially Reported on 860814.Testing Underway.Item Reportability Will Be Submitted by 860926
ML20212P31714 August 1986Final Part 21 & Deficiency Rept,Item 230 Re Foreign Objects in Steam Generators B & C.Initially Reported in 860814 Telcon.Evaluation Completed.Condition Nonreportable Per 10CFR50.55(e) & 10CFR21
ML20205F61413 August 1986Part 21 Rept Re Connecting Rod Bolts for Dsrv Engines.Listed Procedures Recommended for Next Connecting Rod Insp, Including Replacement of Bolts Due to Cracked Threads & Large Grooves & Galls in Threads
ML20212B5831 August 1986Part 21 Rept Re Technical Noncompliance W/Matl Certification of Krueger (Div of Phillips Industries) Aluminum Extrusions Used at Nuclear Plants.Vendor to Perform Tensile Tests from Each Heat Number If use-as-is Condition Unacceptable
ML20203D02214 July 1986Part 21 Rept Re Air Monitoring Sys Probes Exhibiting Blue Tip Rather than Normal White Tip & Insensitive to Chlorine. Caused by Improper Handling/Storage.Advisory Bulletin Encl. Item Not Reportable Per Part 21
ML20212D0089 July 1986Final Deficiency Rept,Item 229,re Emergency Svc Water Pump a Trip.Initially Reported on 860609.Caused by Failure of Penetration Seal at Intake Structure.Seal Design Modified. Pump Disassembled & Inspected