Monthly Operating Rept for May 1998 for Shearon Harris Nuclear Power Plant.W/980612 Ltr
ML18016A452
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 05/31/1998
From: Donahue J, Shannon Rogers
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HNP-98-085, HNP-98-85, NUDOCS 9806190041
Download: ML18016A452 (6)


Text

'CATEGORY 1 REGULATvRY INFORMATION DISTRIBUTIO SYSTEM (RIDS)

DOCKET FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH. NAME AUTHOR AFFILIATION ROGERS,S.i ~ ~

Carolina Power E Light Co; DONAHUE,J;$k. Carolina Power E Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly o Plant /980612

'ept ltr. for May 1998 for Harris Nuclear DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:Application for permit renewal filed. 05000400E RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 PD 1 1 FLANDERS,S 1 1 INTERNAL: ACRS 1 '

1 AEOD/SPD/RRAB 1 1 J 1 OC/DBA/PAD 1 1 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC NRC PDR 1 1 D

U N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

I Carolina Power & Light Company Harris Nuclear Plant PO Box 165 New Hill NC 27562 JUN,1 2 1998 United States Nuclear Regulatory Commission Serial: HNP-98-085 ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 MONTHLYOPERATING REPORT

Dear Sir or Madam:

In accordance with Carolina Power Ec Light Company's Harris Nuclear Plant Technical Specification 6.9.1.5, the report of operating statistics and shutdown experience for the month of May 1998 is provided.

Sincerely, J. W. Donahue Director of Site Operations Harris Plant SGR Enclosure c: Mr. J. B. Brady - NRC Senior Resident Inspector

~BI t I

Mr. S. C. Flanders - NRC Project Manager Mr. L. A. Reyes - NRC Regional Administrator 980bi9004i 98053i 05000400 I

PDR ADOCK R PD~R State Road 1134 New Hill NC

USNRC Document Control Desk HNP-98-085 / Page 2 bc: Mr. T. C. Bell Mr. B. H. Clark Mr. G. W. Davis Ms. D. J. Hamilton Mr. W. D. Johnson Ms. W. C. Langston (PE8cRAS File)

Mr. R. D. Martin Mr. W. S. Orser Mr. W. R. Robinson Ms. S. G. Rogers Mr. W. G. Wendland (American Nuclear Insurers)

Nuclear Records Licensing File

Enclosure to Serial HNP-98-085 Sheet l of 2 I I CP&L CO. PLANT PERFORMANCE DATA SYSTEM PAGE 1 RUN DATE 06/03/98 OPERATING DATA REPORT RPD36"000 RUN TIME 11:02:15 HARRIS UNIT 1 DOCKET NO. 050"400 COMPLETED BY SHEILA ROGERS OPERATZNG STATUS TELEPHONE (919)362-2573

1. UNIT NAME: HARRIS UNIT 1
2. REPORTING PERIOD: MAY 98
3. LICENSED THERMAL POWER (MWT): 2775
4. NAMEPLATE RATING (GROSS MWE): 950.9
5. DESIGN ELECTRICAL RATING (NET MWE):, 900.0
6. MAX DEPENDABLE CAPACITY (GROSS MWE): 920.0
7. MAX DEPENDABLE CAPACITY (NET MWE): 860.0
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE):
10. REASONS FOR RESTRICTION IF ANY:

THIS YR TO CUMUL MONTH DATE ATIVE

11. HOURS IN REPORTING PERIOD 744.00 3623.00 97152.00
12. NUMBER OF HOURS REACTOR CRITICAL 744.00 3623.00 81932.71
13. REACTOR RESERVE SHUTDOWN HRS .00 .00 .00
14. HOURS GENERATOR ON LINE 744.00 3623.00 81116.54
15. UNIT RESERVE SHUTDOWN HOURS .00 .00 .00
16. GROSS THERMAL ENERGY GEN. (MWH) 2060144.46 9975641.04 217810418.22
17. GROSS ELEC. ENERGY GEN (MWH) 682760.00 3337302.00 72519106.00
18. NET ELEC. ENERGY GENERATED (MWH) 641429.00 3135222.00 67660527.00
19. UNIT SERVICE FACTOR 100.00 100.00 83.49
20. UNIT AVAILABILITYFACTOR 100.00 100.00 83.49
21. UNIT CAP. FACTOR (USING MDC NET) 100.25 100.62 80.98
22. UNIT CAP. FACTOR (USING DER NET) 95.79 96.15 77.38
23. UNIT FORCED OUTAGE RATE .00 .00 3.25
24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHZEVED INITIAL CRITICALITY IN1TIAL ELECTRICITY COMMERCIAL OPERATION 1.16 - 9

~ 1

~ ~

Enclosure to Serial: HNP-98-085 Sheet 2 of 2 CP&L CO. PLANT PERFORMANCE DATA SYSTEM PAGE 1 RUN DATE 06/03/98 APPENDIX B AVERAGE DAILY POWER LEVEL RPD39-000 RUN TIME 11:02:15 HARRIS UNIT 1 DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362-2573 1998 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET) (MWE-NET) 865 17 856 869 18 861 867 19 857 869 20 856 867 21 855 864 22 866 863 23 865 864 867 865 25 855 10 868 26 854 869 27 855 12 868 28 858 871 29 855 14 869 30 853 15 867 31 854 16 856