Monthly Operating Rept for Jan 1999 for Shearon Harris Nuclear Power Plant.With 990211 Ltr
ML18016A804
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 01/31/1999
From: Alexander D, Shannon Rogers
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HNP-99-020, HNP-99-20, NUDOCS 9902180079
Download: ML18016A804 (7)


Text

CATEGORY 1 REGULATO Y INFORMATION DISTRIBUTIOh SYSTEM (RIDS)

DOCKET FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH NAME AUTHOR AFFILIATION ROGERS,S. Carolina Power S Light Co.

ALEXANDER,D.B. Carolina Power & Light Co.,

RECIP.NAME RECIPIENT AFFILIATION Monthly operating rept for

SUBJECT:

Nuclear Power Pla . 3.t 990211 ltr. for Shearon Harris DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:Application for permit renewal filed. 0500040(S RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 PD 1 1 FLANDERS,S 1 1 INTERNAL: 1 1 AEOD/SPD/RRAB 1 1 1 1 OC/DBA/PAD 1 1 RGN2 1 1 EXTERNAL: LITCO BRYCE,J H NOAC 1 1

~ NRC PDR NOTE TO ALL "RZDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

Carolina Power & Light Company Harris Nuclear Plant P.O. Box 165 New Hill NC 27562 FEB 11 ]999 United States Nuclear Regulatory Commission Serial: HNP-99-020 ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HA&US NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 MON'I'HLYOPERATING REPORT

Dear Sir or Madam:

In accordance with Carolina Power A Light Company's Harris Nuclear Plant Technical Specification 6.9.1.5, the report of operating statistics and shutdown experience for the month of January 1999 is provided.

Sincerely, D. B. Alexander Manager, Regulatory Affairs Harris Plant SGR j/

Enclosure c: Mr. J. B. Brady - NRC Senior Resident Inspector Mr. S. C. Flanders - NRC Project Manager Mr. L. A. Reyes - NRC Regional Administrator 99oi~eoor9 ivassxQ poa Aoacw osaaoeoo

. P~D

>goy 5413 Shearon Harris Road New Hill NC

Enclosure to Serial HNP-99-020 Sheet I of3 CP&L CO. PLANT PERFORMANCE DATA SYSTEM PAGE 1 RUN DATE 02/03/99 OPERATING DATA REPORT RPD36-000 RUN TIME 11:37:33 HARRIS UNIT 1 DOCKET NO. 050-400 COMPLETED BY SHE1LA ROGERS OPERATING STATUS TELEPHONE (919)362-2573

1. UNIT NAME: HARRIS UNIT 1
2. REPORT1NG PERZOD: JANUARY 99
3. LICENSED THERMAL POWER (MWT): 2775
4. NAMEPLATE RATING (GROSS MWE): 950.9
5. DESXGN ELECTRICAL RATING (NET MWE): 900.0
6. MAX DEPENDABLE CAPACITY (GROSS MWE): 920.0
7. MAX DEPENDABLE CAPACITY (NET MWE): 860.0
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SZNCE LAST REPORTS GIVE REASONS:
9. POWER LEVEL TO WHZCH RESTRICTED IF ANY (NET MWE):
10. REASONS FOR RESTRICTION IF ANY:

THIS YR TO CUMUL MONTH DATE ATIVE

11. HOURS IN REPORTING PERIOD 744.00 744.00 103033.00
12. NUMBER OF HOURS REACTOR CRITICAL 719.68 719.68 86945.29
13. REACTOR RESERVE SHUTDOWN HRS .00 .00 .00
14. HOURS GENERATOR ON LINE 700.43 700.43 86086.04
15. UNIT RESERVE SHUTDOWN HOURS .00 .00 .00
16. GROSS THERMAL ENERGY GEN. (MWH) 1906265.16 1906265.16 231325989.12
17. GROSS ELEC. ENERGY GEN (MWH) 639389.00 639389.00 76983426.00
18. NET ELEC. ENERGY GENERATED (MWH) 598552.00 598552.00 71835424.00
19. UNIT SERVICE FACTOR 94.14 94.14 83.55
20. UNXT AVAILABXLITYFACTOR 94.14 94.14 83.55
21. UNIT CAP. FACTOR (USING MDC NET) 93.55 93.55 81.07
22. UNIT CAP. FACTOR (USING DER NET) 89.39 89.39 77.47
23. UNIT FORCED OUTAGE RATE 5.86 5.86 3.12
24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1.16 9

f Enclosure to Serial: HNP-99-020 Sheet2of3 CP&L CO. PLANT PERFORMANCE DATA SYSTEM PAGE 1 RUN DATE 02/03/99 APPENDIX B AVERAGE DAILY POWER LEVEL RPD39-000 RUN TIME 11:37:32 HARRIS UNIT 1 DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362-2573 JANUARY 1999 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET) (MWE-NET) 883 17 859 858 18 861 857 19 872 884 20 871 884 21 870 881 22 866 880 23 834 880 867 875 25 876 10 883 26 878 880 27 873 12 877 28 871 874 29 876 318 30 880 15 -40 31 882 16 231

Enclosure to =

Serial: HNP-99-OXO Sheet 3 of 3 UNIT SHVTDOIVNS AND POAVER REDUCTIOiI UNITNAME: Harris DATE: 01/31/99 COMPLETED BY: S. G. Rogers TELEPHOiiE: (919) 362-2573 REPORT MOirTH: January 1999 CAUSE AND CORRECTIVE METHOD OF LICENSEE ACI'IONTO DURATIOiN SHUITING DOWN EVENT SYSTEM COMPOhVZG'ODE PREVENT RECURRENCE NUMBER DATE TYPE I (HOURS REASON 2 REACTOR 3 REPORT ¹ CODE 4 5 Plant trip occurred I/14/99 99-001 01/14/99 43.57 RELAYX when worl;ers were performing preventive maintenance on bus. Ramp up

'A'uxiliary began I/16/99 9 Ot:52 and the plant was returned to 100% power on I/17/99 8'4:00.

I 2 3 4 F: Forced Reason: Mdhod: Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) I-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee Event Report C-Refueling 3-Automatic Scram (LER) File D-Regulatory Restriction 4-Continued (NUREG-0161)

E-Operator Training /b License Examination 5-Reduced Load F-Administrative 6-Other 5 G-Operational Enor (Explain) Exlubit I - Same Source H-Other (Explain)

~ ~ ~ ~