Monthly Operating Rept for Dec 1998 for Shearon Harris Npp. with 990113 Ltr
ML18016A780
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 12/31/1998
From: Alexander D, Shannon Rogers
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HNP-99-003, HNP-99-3, NUDOCS 9901210062
Download: ML18016A780 (9)


Text

CATEGORY 1 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

DOCKET FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH. NAME AUTHOR AFFILIATION ROGERS,S. Carolina Power S Light Co.

ALEXANDER,D.B. Carolina Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthl rept for Dec 1998 for Shearon Harris Plan .With 9 0113 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:Application for permit renewal filed. 05000400>

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 PD 1 1 FLANDERS,S 1 1 INTERNAL: AC 1 1 AEOD/SPD/RRAB 1 1 FILE CENTER 0 1 1 OC/DBA/PAD 1 1 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 U'OTE TO ALL "RZDS" RECZPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

Carolina Power & Light Company Harris Nuclear Plant P.O. Box 165 New Hill NC 27562 JAN 1 3 ]999 United States Nuclear Regulatory Commission Serial: HNP-99-003 ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 MONTHLYOPERATING REPORT

Dear Sir or Madam:

In accordance with Carolina Power Ec Light Company's Harris Nuclear Plant Technical Specification 6.9.1.5, the report of operating statistics and shutdown experience for the month of December 1998 is provided.

Sincerely, D. B. Alexander Manager, Regulatory Affairs Harris Plant SGR Enclosure c: Mr. J. B. Brady - NRC Senior Resident Inspector Mr. S. C. Flanders - NRC Project Manager Mr. L. A. Reyes - NRC Regional Administrator 990i2i0062 98i23i.

PDR ADQCK 05000400 u R PDR:,

5413 Shearon Harris Road New Hill NC

'(

~ /

.5 v ~

r, e t

Enclosure to Serial HNP-99-003 Sheet l of 3 CP&L CO. PLANT PERFORMANCE DATA SYSTEM PAGE 1 RUN DATE 01/04/99 OPERATING DATA REPORT RPD36"000 RUN TIME 11:54:45 HARRIS UNIT 1 DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS OPERATING STATUS TELEPHONE (919)362-2573

1. UNIT NAME: HARRIS UNIT 1
2. REPORTING PERIOD: DECEMBER 98
3. LICENSED THERMAL POWER (MWT): 2775
4. NAMEPLATE RATING (GROSS MWE): 950.9
5. DESXGN ELECTRICAL RATING (NET MWE): 900.0
6. MAX DEPENDABLE CAPACXTY (GROSS MWE): 920.0
7. MAX DEPENDABLE CAPACITY (NET MWE): 860.0
8. IF CHANGES OCCUR IN CAPACITY RATINGS (XTEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE):
10. REASONS FOR RESTRICTION XF ANY:

THIS YR TO CUMUL MONTH DATE ATIVE

11. HOURS XN REPORTING PERIOD 744.00 8760.00 102289.00
12. NUMBER OF HOURS REACTOR CRITICAL 744.00 7915.90 86225.61
13. REACTOR RESERVE SHUTDOWN HRS .00 .00 .00
14. HOURS GENERATOR ON LXNE 744.00 7892.07 85385.61
15. UNIT RESERVE SHUTDOWN HOURS .00 .00 .00
16. GROSS THERMAL ENERGY GEN. (MWH) 2015895.42 21584946.78 229419723.96
17. GROSS ELEC. ENERGY GEN (MWH) 678762.00 7162233.00 76344037.00
18. NET ELEC. ENERGY GENERATED (MWH) 637123.00 6711567.00 71236872.00
19. UNIT SERVICE FACTOR 100. 00 90.09 83.47
20. UNZT AVAILABILITYFACTOR 100.00 90.09 83.47
21. UNIT CAP. FACTOR (USING MDC NET) 99.58 89.09 80.98
22. UNIT CAP. FACTOR (USING DER NET) 95.15 85.13 77.38
23. UNIT FORCED OUTAGE RATE .00 .04 3.10
24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE/ AND DURATION OF EACH):
25. ZF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALXTY INITIAL ELECTRICITY COMMERCIAL OPERATION 1.16 - 9

I Y

l, 'Q P

P<

p

Enclosure to Serial: HNP-99-003 Sheet2of3 CP6L CO. PLANT PERFORMANCE DATA SYSTEM PAGE 1 RUN DATE 01/04/99 APPENDIX B - AVERAGE DAILY POWER LEVEL RPD39"000 RUN TIME 11:54:44 HARRIS UNIT 1 DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362-2573 DECEMBER 1998 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET) (MWE-NET) 530 17 879 664 18 882 856 19 879 866 20 879 865 21 875 861 22 872 860 23 885 861 884 872 25 883 10 877 26 882 876 27 882 12 874 28 880 13 872 29 882 870 30 881 15 868 31 883 16 868

I

  • ~

Enclosure toi.

Serial: HNP-99-009:

Sheet 3 of 3 j UNIT SHUTDOWNS AND POWER REDUCTION UNITNAME: Harris DATE: 12/31/98 COMPLETED BY: S. G. Rogers TELEPHONE: (919) 362-2573 REPORT MONTH: December 1998 CAUSE AND CORRECTIVE METHOD OF LICENSEE ACTION TO DURATION SHUTTING DOWN EVENT SYSTEM COivlPONENT PREVENT RECURRENCE NUMBER DATE TYPE I (HOURS) REASON 2 REACfOR 3 REPORT It CODE 4 CODE 5 Plant )vas rctumed to 98-005 10/23/98 0.0 N/A service on 11/28/98 Q 23:36 and ramp-up to 100 lo popover was compIete on 12/03/98 04:00 I 2 3 4 F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) I-Manual for Preparation of Data B-Maintcnancc or Test 2-Manual Scram Entry Sheets for Licensee Event C-Refueling 3-Automatic Scram Report (LER) File D-Regulatory Restriction 4<ontinued (NUREG4161)

E&perator Training &, License Examination 5-Reduced Load F-Administrative 6<ther 5 GRperational Error (Explain) Exhibit I - Same Source Hither (Explain)

~

~

A