Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML18017A918 | 8 October 1999 | LER 99-008-00:on 991008,CR Emergency Filtration Sys Tech Specs Occurred.Caused by Site Personnel Failed to Recognize That Blocking Open CR Emergency Filtration Sys.Procedures Revised.With 991008 Ltr | |
ML18017A915 | 30 September 1999 | Monthly Operating Rept for Sept 1999 for Shearon Harris Npp. with 991012 Ltr | |
ML20217A993 | 30 September 1999 | NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data | |
ML18017A867 | 10 September 1999 | LER 99-007-00:on 990811,determined That Cvis ARMs High Alarm Setpoints Were Not within TS Limit.Caused by Not Having Procedure to Verify If Cvis ARM High Alarm Setpoints Were within TS Requirements.Revised Procedures.With 990910 Ltr | |
ML18017A862 | 31 August 1999 | Monthly Operating Rept for Aug 1999 for Harris Nuclear Plant.With 990908 Ltr | |
ML18016B048 | 4 August 1999 | LER 99-006-01:on 981124,noted Failure to Comply with TS 4.0.4 & TS 3/4.6.3, Civs. Caused by post-maint Testing That Did Not Adequately Test Control Circuitry & Verify Isolation Time Following Maint.Procedure Was Revised | |
ML18017A836 | 31 July 1999 | Monthly Operating Rept for July 1999 for Shearon Harris Nuclear Power Plant.With 990811 Ltr | |
ML18016B015 | 30 June 1999 | Monthly Operating Rept for June 1999 for Shearon Harris Npp. with 990713 Ltr | |
ML20196H862 | 30 June 1999 | NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept | High Radiation Area Power change |
ML18016A980 | 4 June 1999 | LER 99-006-00:on 981124,failed to Comply with TS 4.0.4 & TS 3/4.6.3, Civ. Caused by post-maint Testing That Did Not Adequately Test Control Circuitry & Verify Isolation Time Following Maint.Procedure Will Be Revised.With 990604 Ltr | |
ML18016A985 | 31 May 1999 | Monthly Operating Rept for May 1999 for Shearon Harris Nuclear Plant,Unit 1.With 990614 Ltr | |
ML18017A898 | 12 May 1999 | Technical Rept Entitled, Harris Nuclear Plant-Bacteria Detection in Water from C&D Spent Fuel Pool Cooling Lines. | |
ML18016A958 | 30 April 1999 | Monthly Operating Rept for Apr 1999 for Shearon Harris Nuclear Plant,Unit 1.With 990513 Ltr | |
ML18016A901 | 12 April 1999 | Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected | |
ML18016A911 | 12 April 1999 | LER 99-005-00:on 990313,plant Exceeded ESFAS TS 3.3.2,Action 21.Caused by Inadequate Procedure Rev Preparation.Licensee Revised Applicable Maint Surveillance Test Procedure (MST-10072) to Identify TS Required Actions.With 990412 Ltr | |
ML18016A897 | 8 April 1999 | LER 99-004-00:on 990312,unit Trip Was Noted.Caused by Degraded Condition of SG Water Level Flow Control Valve. Replaced Positioners on All Three FW Regulating Valves.With 990408 Ltr | |
ML18016A894 | 5 April 1999 | Revised Pages 20-25 to App 4A of non-proprietary Version of Rev 3 to HI-971760 | |
ML18016A910 | 31 March 1999 | Monthly Operating Rept for Mar 1999 for Shearon Harris Nuclear Power Plant.With 990413 Ltr | |
ML18016A866 | 31 March 1999 | Shnpp Operator Training Simulator,Simulator Certification Quadrennial Rept. | Boric Acid Shutdown Margin Emergency Lighting Overspeed trip |
ML18017A893 | 28 February 1999 | Risks & Alternative Options Associated with Spent Fuel Storage at Shearon Harris Nuclear Power Plant. | Safe Shutdown Earthquake Probabilistic Risk Assessment Operating Basis Earthquake Earthquake Chernobyl Fuel cladding Power Uprate |
ML18016A855 | 28 February 1999 | Monthly Operating Rept for Feb 1999 for Shearon Harris Npp. with 990312 Ltr | |
ML18016A826 | 22 February 1999 | LER 99-003-00:on 990123,noted That Plant Was Outside Design Basis Due to Isolation of Fire Protection Containment Sprinkler Sys.Caused by Human Error.Restored Containment Sprinkler Sys to Operable Status.With 990222 Ltr | Safe Shutdown Fire Barrier Fire Protection Program |
ML18016A853 | 18 February 1999 | Non-proprietary Rev 3 to HI-971760, Licensing Rept for Expanding Storage Capacity in Harris SFP 'C' & 'D'. | High Radiation Area Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Nondestructive Examination Earthquake Control of Heavy Loads Fuel cladding Liquid penetrant Overexposure Depleted uranium Water rod |
ML18016A811 | 12 February 1999 | LER 99-002-00:on 990114,RT Due to Not Removing Temporary Device from Relay Following Calibration Was Noted.Caused by Human Error.Counseled Personnel Involved in Event.With 990212 Ltr | |
ML18016A797 | 5 February 1999 | LER 99-001-00:on 990106,SF Pool Water Level Was Not Maintained Greater than 23 Feet Above Stored BWR Fuel Assemblies.Caused by Fasteners Bending Under Specific Circumstances.Increased Water Level.With 990205 Ltr | |
ML18022B063 | 4 February 1999 | Rev 0 to Nuclear NDE Manual. with 28 Oversize Uncodable Drawings of Alternative Plan Scope & 4 Oversize Codable Drawings | Hydrostatic Nondestructive Examination VT-2 Liquid penetrant |
ML20202J116 | 1 February 1999 | SER Accepting Relief Requests Associated with Second 10-year Interval Inservice Testing Program | Incorporated by reference |
ML18016A804 | 31 January 1999 | Monthly Operating Rept for Jan 1999 for Shearon Harris Nuclear Power Plant.With 990211 Ltr | |
ML18016A794 | 29 January 1999 | LER 98-004-01:on 980313,identified Design Deficiency Re Potential Runout of Tdafwp.Caused by Inadequate Original AFW Sys Design.Operability Evaluation Was Completed on 980313 & Addl Engineering Analysis Was Performed by Vendor | Unanalyzed Condition Overspeed trip |
ML18016A780 | 31 December 1998 | Monthly Operating Rept for Dec 1998 for Shearon Harris Npp. with 990113 Ltr | |
ML18016A767 | 30 November 1998 | Monthly Operating Rept for Nov 1998 for Shnpp,Unit 1.With 981215 Ltr | |
ML18016A973 | 28 November 1998 | Changes,Tests & Experiments, for Harris Nuclear Plant.Rept Provides Brief Description of Changes to Facility & Summary & of SE for Each Item That Was Implemented Under 10CFR50.59 Between 970608-981128.With 990527 Ltr | Safe Shutdown Boric Acid Shutdown Margin High Radiation Area Ultimate heat sink Fire Barrier Stroke time Anticipated operational occurrence Safe Shutdown Earthquake Coatings Temporary Modification Emergency Lighting Locked High Radiation Area Flow Accelerated Corrosion Eddy Current Testing Operability Determination Fuel cladding Pressure Boundary Leakage Continuous fire watch Siren Overspeed trip Operational leakage |
ML18016A835 | 28 November 1998 | ISI Summary 8th Refueling Outage for Shearon Harris Power Plant,Unit 1. | Hydrostatic Anchor Darling Nondestructive Examination Eddy Current Testing Liquid penetrant |
ML18016A741 | 25 November 1998 | Rev 1 to Shnpp Cycle 9 Colr. | Shutdown Margin |
ML18016A721 | 17 November 1998 | LER 98-007-00:on 981023,turbine Control Anomaly Caused Manual Rt.Caused by Failure to Incorporate Verbal Vendor Guidance in Operating Procedures.Addl Vendor Guidance Will Be Verified & Added to Procedures.With 981117 Ltr | Downpower |
ML18016A707 | 3 November 1998 | Rev 0 to Harris Unit 1 Cycle 9 Colr. | Shutdown Margin |
ML18016A720 | 31 October 1998 | Monthly Operating Rept for Oct 1998 for Shearon Harris Nuclear Power Plant.With 981113 Ltr | |
ML20154F870 | 6 October 1998 | Safety Evaluation Authorizing Proposed Alternative to Requirements of OMa-1988,Part 10,Section 4.2.2.3 for 21 Category a Reactor Coolant Sys Pressure Isolation Valves | High Radiation Area Incorporated by reference |
ML18016A620 | 30 September 1998 | Monthly Operating Rept for Sept 1998 for Harris Nuclear Power Plant.With 981012 Ltr | |
ML18016A597 | 21 September 1998 | Rev 1 to Harris Unit 1 Cycle 8 Colr. | Shutdown Margin |
ML18016A588 | 31 August 1998 | Monthly Operating Rept for Aug 1998 for Shnpp,Unit 1.With 980914 Ltr | |
ML18016A507 | 31 July 1998 | Monthly Operating Rept for Jul 1998 for Shearon Harris Nuclear Plant.W/980811 Ltr | |
ML18016A943 | 7 July 1998 | Rev 1 to QAP Manual. | Safe Shutdown Non-Destructive Examination Hydrostatic Probabilistic Risk Assessment Coatings Nondestructive Examination Incorporated by reference Condition Adverse to Quality Commercial Grade Fire Protection Program |
ML18016A484 | 7 July 1998 | LER 97-002-01:on 970207,determined That Cold Weather Conditions Resulted in Mfiv Being Potentially Inoperable During Period 970117-20.Caused by Inadequate Design of HVAC Sys.Implemented Mods to Steam Tunnel HVAC Sys | Stroke time Temporary Modification |
ML18016A937 | 30 June 1998 | Technical Rept on Matl Identification of Spent Fuel Piping Welds at Hnp. | |
ML18016A486 | 30 June 1998 | Monthly Operating Rept for June 1998 for SHNPP.W/980715 Ltr | |
ML18016A470 | 30 June 1998 | LER 97-021-03:on 980210,discovered That SFP Water Level Had Not Been Verified Greater than 23 Feet Above BWR Fuel Assemblies.Caused by Misinterpretation of TS Requirements. Will Submit TS Change Request to Revise TS 3.9.1.11 | |
ML18016A449 | 8 June 1998 | LER 98-006-00:on 980508,failure to Perform Insp & Preventive Maint on MCCB as Required by TS Was Noted.Caused by Inadequate Sps.Tested 9 Pressurizer Heater Bank Breakers by Cycling each.W/980608 Ltr | |
ML18016A452 | 31 May 1998 | Monthly Operating Rept for May 1998 for Shearon Harris Nuclear Power Plant.W/980612 Ltr | |
ML18016A771 | 26 May 1998 | Non-proprietary Rev 2 to HI-971760, Licensing Rept for Expanding Storage Capacity in Harris Spent Fuel Pools 'C' & 'D'. | High Radiation Area Ultimate heat sink Non-Destructive Examination Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Nondestructive Examination Earthquake Control of Heavy Loads Fuel cladding Liquid penetrant Overexposure Water rod |