Part 21 Rept Re Deficiency in Control & Power Circuits for Dc motor-operated Valves Due to Lack of Surge Protection. Initially Reported on 880518.Interim Measures Established to Ensure Proper Operation of Valves Until Surge Installed
ML18005A655
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 09/29/1988
From: Watson R
CAROLINA POWER & LIGHT CO.
To: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
CON-NRC-644, REF-PT21-88, REF-PT21-88-125-000 HO-880196-(O), PT21-88-125, PT21-88-125-000, NUDOCS 8810240225
Download: ML18005A655 (4)


Text

I ~

C CELE RATED ~IBUTION DEMONS4ikTION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8810240225 DOC.DATE: 88/09/29 NOTARIZED: NO DOCKET C.

FACIL:50-400 Shearon Harris Nuclear Power .Plant, Unit 1, Carolina '5000400 AUTH. NAME AUTHOR AFFILIATION WATSON,R.A. Carolina Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION GRACE,J.N. Region 2, Ofc of the Director

SUBJECT:

Part 21 rept re deficiency in control 6 power circuits for dc motor o-perated valves due to lack of surge protection. R DISTRIBUTION CODE:. IE19D COPIES RECEIVED:LTR / ENCL 0 SIZE: I TITLE: Part 21 Rept (50 DKT)

D NOTES:Application for permit renewal filed. 05000400 8

I r il RECIPIENT "COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 LA 1 0 PD2-1 PD 1 1 A BUCKLEY,B 1 1 INTERNAL: AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1l ARM TECH ADV 1 1 NRR CRUTCHFIELD 1 1 NRR VARGA,S 1 1 NRR/DEST/ADE 8H 1 1 NRR/DEST/ADS 7E 1 1 NRR/DLPQ/QAB 10 1 1 NRR/DOEA/EAB 11 1 1 NEW/DOEA/GCB 11 1 1 RIS VIB 9D 1 1 NUDOCS-ABSTRACT 1 1 RE 01 1 1 RES/DSIR/EIB 1 1 EB/5S 'EPY 1 1 RGN1 1 1 RGN2 1 1 RGN3 1 1 RGN4 1 1 RGN5 1 1 EXTERNAL: INPO RECORD CTR 1 1 LPDR 1 1 NRC PDR 1 1 NSIC SILVERf E 1 1 8

'A NOTE TO ALL "RIDS" RECIPIEÃIS PZKBE HELP US TO REDUCE HASTE! CGÃI'ACT 'le DOQ3MEFZ CONZROL DESK ROCN P1-37 (EXT. 20079) TO EIZKQQZE YOUR NAME FRY DISTEUBUTIQN LISTS H)R DOCUMENTS YOU DGNPT NEEDt TOTAL NUMBER OF COPIES REQUIRED: LTTR 27 ENCL 2 0

t~

'0

,1 0

)i

)

t

CÃQD Carolina Power & Light Company HARRIS NUCLEAR PROJECT P. 0. Box 165 New Hill, North Carolina 27562 SEP 29 1988 File Number: SHF/10-13510 NRC-644 Letter Number'HO-880196 (0)

Dr. J. Nelson Grace United States Nuclear Regulatory Commission Region II 101 Marietta Street, Northwest (Suite 2900)

Atlanta, Georgia 30323 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 10CFR PART 21 REPORTABLE ITEM DC MOTOR FAILURE Dear Dr. Grace'.

On May 18, 1988, Carolina Power & Light Company submitted to the NRC a 10CFR21 Notification (NRC-625) concerning a deficiency in the control and power circuits for DC motor-operated valves due to the lack of surge protection. The report provided the corrective actions taken and the interim measures established to ensure the proper operation of the subject DC motor-operated valves until permanent surge protection was installed.

It was projected at that time that a modification would be implemented to install the required surge protection by October 1, 1988.

The purpose of this letter is to inform you that the current projected date for installation of this modification is now November 4, 1988.

If you should have any questions regarding this matter, please contact Mr. Dean Tibbitts at (919) 362-2718.

Very truly yours, R. A. Watson Vice President Harris Nuclear Project MGW:vdj cc.'Messrs. W. H. Bradford (NRC-SHNPP)

B. C. Buckley (NRR)

NRC Document Control Desk 8810240225 880929 PDR ADOCK OiaOO4OO 8 PDC MEM/HO-8801960/1/Osl H~py I