ML18017A836

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for July 1999 for Shearon Harris Nuclear Power Plant.With 990811 Ltr
ML18017A836
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 07/31/1999
From: Alexander D, Shannon Rogers
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HNP-99-126, NUDOCS 9908170166
Download: ML18017A836 (5)


Text

ORY 1 REGULAT Y INFORMATION DISTRIBUTIO YSTEM (RIDS)

FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina DOCKET 05000400 I

RUTH.NAME AUTHOR AFFILIATION ROGER,S. Carolina Power &. Light Co.

ALEXANDER,D.B. Carolina Power 8 Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating re Ju 9 for Shearon Harris Nuclear Power Pla .With 9'908 t DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR TITLE: Monthly Operating Report (per Tech Specs)

I ENCL X SIZE:

NOTES:Application for permit renewal filed. osooo4oo E RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL LAUFER,R. 1 1 INTERNAL: ACRS 1 1 FILE Cgggg~ 1 1 OC/DBA/PAD 1 1 KS DRAA/OERAB 1 1 RGN2 1 1 EXTERNAL: LMITCO MARSHALL 1 1 NOAC 1 1 NRC PDR 1 1 D

'E N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, LISTS CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OP COPIES REQUIRED: LTTR 9 ENCL 9

'c Carolina Power & Light Company Harris Nuclear Plant P.O. 8ox 165 New Hill NC 27562 Serial: HNP-99-126 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 MONTHLYOPERATING REPORT

Dear Sir or Madam:

In accordance with Carolina Power & Light Company's Harris Nuclear Plant Technical Specification 6.9.1.5, the report of operating statistics and shutdown experience for the month of July 1999 is provided.

Sincerely, D. B. Alexander Manager, Regulatory Affairs Harris Plant SGR Enclosure ~Q' Mr. J. B. Brady - NRC Senior Resident Inspector Mr. R. J. Laufer - NRC Project Manager Mr. L. A. Reyes - NRC Regional Administrator 5413 Shearon Harris Road New Hill NC

'st'st08'l70166 st90731 PDR R '","'05000400

'ADOCK PDR'

  • e e

f e ~

Enclosure to Serial HNP-99-126 Sheet 1 of 2 CPEcL CO. PLANT PERFORMANCE DATA SYSTEM PAGE 1 RUN DATE 08/06/99 OPERATING DATA REPORT RPD36-000 RUN TIME 12:23:04 HARRIS UNIT 1 DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS OPERATING STATUS TELEPHONE (919)362-2573

1. UNIT NAME: HARRIS UNIT 1
2. REPORTING PERIOD: JULY 99
3. LICENSED THERMAL POWER (MWT): 2775
4. NAMEPLATE RATING (GROSS MWE): 950.9
5. DESIGN ELECTRICAL RATXNG (NET MWE): 900.0
6. MAX DEPENDABLE CAPACITY (GROSS MWE): 920.0
7. MAX DEPENDABLE CAPACITY (NET MWE): 860.0
8. ZF CHANGES OCCUR XN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRXCTED ZF ANY (NET MWE):
10. REASONS FOR RESTRlCTION ZF ANY:

THIS YR TO CUMUL MONTH DATE ATIVE r

11. HOURS IN REPORTXNG PERIOD 744.00 5087.00 107376.00
12. NUMBER OF HOURS REACTOR CRITICAL 744.00 4925.60 91151. 21
13. REACTOR RESERVE SHUTDOWN HRS .00 .00 .00
14. HOURS GENERATOR ON LlNE 744.00 4851.11 90236.72
15. UNIT RESERVE SHUTDOWN HOURS .00 .00 .00
16. GROSS THERMAL ENERGY GEN. (MWH) 2060091.18 13252993.74 242672717.70
17. GROSS ELEC. ENERGY GEN (MWH) 673755.00 4402034.00 80746071.00
18. NET ELEC. ENERGY GENERATED (MWH) 632165.00 4126640.00 75363512.00
19. UNIT SERVICE FACTOR 100.00 95.36 84.04
20. UNIT AVAILABILITYFACTOR 100.00 95.36 84.04
21. UNIT CAP. FACTOR (USXNG MDC NET) 98.80 94.33 81.61
22. UNXT CAP. FACTOR (USING DER NET) 94.41 90.13 77.99
23. UNIT FORCED OUTAGE RATE .00 4.64 3.18
24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
25. I'F SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
26. UNITS 1N TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1.16 - 9

Enclosure to Serial: HNP-99-126 Sheet 2 of 2 CPEcL CO. PLANT PERFORMANCE DATA SYSTEM PAGE 1 RUN DATE 08/06/99 APPENDIX B AVERAGE DAILY POWER LEVEL RPD39-000 RUN TIME 12:23:03 HARRIS UNIT 1 DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362-2573 JULY 1999 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET) (MWE-NET) 852 17 850 853 18 848 850 19 847 847 20 847 843 21 847 843 22 845 850 23 842 850 24 845 25 849 10 847 26 846 860 27 848 12 866 28 846 13 865 29 849 14 861 30 846 15 858 31 16 854