Final Part 21 Rept Re Potential Problem W/Steel Cylinder Heads.Initially Reported on 921125.Caused by Inadequate Cast Wall Thickness at 3/4-inch-10 Bolt Hole.Stud at Location Indicated on Encl Sketch Should Be Removed
ML20126B042
Person / Time
Site: Perry, Harris, Vogtle, San Onofre, Rancho Seco, Bellefonte, Shoreham  Southern California Edison icon.png
Issue date: 12/17/1992
From: Labrun H
COOPER INDUSTRIES, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
REF-PT21-92 QCG-9218, NUDOCS 9212210357
Download: ML20126B042 (8)


Text

1 o -

coop.c w m 7

R.cipet.

Olvision 150 Uncoln Avenue

.orove C y A 161271898 sW8 December 17,1992 COOPER Our Ref: OCG 9218 Document Control Desk U.S. Nuclear Regulatorv Comm ssion Washington, D.C. 20:15 Subject; 10 CFR Part 21 Steel Cylinder Heads - F nal Report On November 25,1992 Cooper-Bessemer Products Division, a division of Cooper industries notified the Commission and affected Utilities of a potential problem with cylinder heads (Our Ref. OCG-9190). The purpose of this report is to advise of further identification of affected heads by serial number and recommended corrective action.

The root cause for the failure at G"If States Utilities Company (GSU) was due to inadequate cast wall thickness at the 3/4"-10 bolt hole indicated on the sketch supplied with the 10 CFR Part 21 notification. Our Design Engineering has reviewed the design drawings to determine if any other subcover bolt holes do not have adequate wall thickness between the bolt hole and water passage. Their review revealed no other bolt hole with inadequate wall thickness.

The cylinder heads are identified by one of the following part numbers: 03-360-03-OF, 1 A 6446,1 A-6447,1 A-6879,1 A-6240,1 A-6239,1 A-7062,1 A-5559,1 A-5558,1 A-6266, or 1 A-6265. Cylinder heads affected are those cast prior to August 1,1984.

Identification of individual heads may be accomplished by referring to the attached sketch and from the following information. All heads have the cast serial number, heat number, cast date, manufacturing date, water test, air test, gas test, and possibly reconditioning information stamped on the head. At Area 1 on attached sketch, which is inside the subcover, the serial number, heat number and cast date should be stamped with minimum of 1/4" size letters. Area 2 on the attached sketch, which is outslua the subcover on the head,.;.ludes serial number, heat number, manufacturing date, water test, air test, gas test t Mmation and possibly reconditioning data.

Area 1 should be examined for the cast date as ctamped by the Enterprise foundry with steel stamps. This may be difficult to see as this area has been painted. Other clues to the age of the cylinder tiead are at Area 2. If the serial number is L99 or less, and the manufacturing date is before 1986, it is most likely a cylinder head cast prior to August 1, 1984. Any questions concerning cast dates and serial numbers should be directed to John R. Schneider, Manager, Quality Assurance at 412-458-3434.

9212210357 921217 gDR ADOCK 05000206 PDR g QQ Cooper Bessemer *

  • Emerpries* Penn' I/ /

Page 2 OC.'i-9218

, December 17,1992 Corrective action at the affected utility sites may be accomplished by removing the stud at the location shown on the sketch, and applying Loctite Hydraulic Sealant (Item No.

56931) or equivalent, per Loctite instructions to the threaded ! solo and stud. Tests at Cooper Bessemer conducted on December 7,1992, proved this repair sufficient to withstand 100 PSI of water pressure (hot or cold) without leakage. Service Information Memo (SIM) #384 is being issued which explains this procedure in more detail. This corrective action should be performed at the next scheduled refueling outage, or cold shutdown, or whichever occurs first.

Corrective action at Cooper Bessemer will be to repair this head section on all cylinder heads cast prior to August 1,1984 which are retumed to C-B for rebuild or repair with our standard repair EAR 11-001. This involves drilling the hole 1/8" oversize and 1/8" deeper, welding the area complete, redrilling and retapping to blueprint size and depth, and re-hydrotesting.

We believe these actions warrant closure of this 10 CFR Part 21 report. Questions conceming this issue should be directed to John R. Schneider, Manager, Quality Assurance at 412-458-3434, or Ron G. Billig, Supervisor, Enterprise Engineering at 412-458-3584.

Sincer ly

/

. A.

n Vice President and General Manager HAtlkil

' Attachment cc:

J. R. Schneider - CES/GC B. R. Sedelmyer - CES/GC A. D. Gillette - CES/GC D. T. Blizzard CES/GC J. M. Home - CES/GC R. G. Billig-CES/GC K. E. Tasik - CES/GC J. A. Manno - CES/ Alameda B. C. Guntrum - CES/ Alameda R. L. Nimmo - CES/ Alameda Lee Duck - CES/ Alameda Mr. Walter Haass - NRC One White Flint North Mailstop 9D4 Washington, DC 20555 j

Prge 3 QCG 9218 December 17,1992 cc:

Entergy Operations P. O. Box 429 Echelon One

.1340 Echelon Parkway Jackson, MS 39286-1995 Attn:

T. H. Cloninger Vice Pres. N'nt. Eng.

Carolina Power and Light Co.

Harris Nuclear Project P. O. Box 165 New Hill, NC 27562 Attn:

Dept. Mgr.

Carolina Power and Ught Co.

Harris Nuclear Project P. O. Box 165 New Hill, NC 27562 Attn:

Mr. C. S. Hinnant Plant Gen. Mgr.

Carolina Power and Ught Co.

P. O. Box 1551 Raleigh, NC 27602 Attn:

R. A. Watson Sr. Vice President Carolina Power and Ught Co.

Shearon Harris Nuclear Project P. O. Box 1551 Raleigh, NC 27602 Attn:

S. D. Floyd -

Mgr. Nuclear Licensing Carolina Power and Ught Co.

Shearon Harris Nuclear Project P. O. Box 165 New Hill, NC 27562 Attn:

Mr. O.C. Olexik Mgr. of Regulatory Committee Carolina Power and Ught Co.

Shearon Harris Nuclear Plant P. O. Box 165 New Hill, NC 27562 Attn:

Jerry R. Cribb Mgr, Quality Control l

I

Page 4 QCG-9218 December 17,1992 cc:

Cleveland Electric illuminating Perry Nuclear Power Plant P. O. Box 97 Perry, OH 44081 Attn:

M. Lister Cleveland Electric illuminating Perry Nuclear Power Plant P. O. Box 97 Perry, OH 44081 '

Attn:

Russell J..Tadych Manager, Quality Control Cleveland Electric illuminating Perry Nuclear Power Plant P. O. Box 97.

Perry, OH 44081 Attn:

Harold M. Coon Cooper Enterprise Clearinghouse Duke Engineering & Service 230 South Tryon St.

P.O. Box 1004 Charlotte, NC 28201 1004 Attn:

Mike Anthony Duke Power Co.

Nuclear Generation Dept.

P. O. Box 1007 Charlotte, NC 28201-1007-Attn:

Mgr., Nuclear Safety

- Duke Power Co.

Nuclear Generation Dept.

- P. O. Box 1007 Charlotte, NC 28201-1007 Attn:

W. T. Robertson Vice President, Procurement Entergy -

P. O. Box 429 Port Gibson, MS 33150-Attn:

Fred Titus

. Dir.,- Nuc'aar Plant Eng.

Entergy

- P. O. Box-756 Port Gibson, MS 391b3 Attn:

Vice Pres., Nuclear. Operations

)

.l 1

Page5 QCG 9218

  • December 17,1992 i

cc:

Entergy P. O. Box 756 Port Gibson, MS 39150 Ann:

D.L. Pace Design Engineering i

Georgia Power Co.

Plant Vogtle P. O. Box 1295 Birmingham, AL 35201 Attn:

Mr. T. Green i

Mgr., Engineering and Licensing Georgia Power Co.

Plant Vogtle P. O. Box 1600 Waynesboro, GA 38030 i

Attn:

Mr. W. B. Shipman Gen. Mgr.

Manager, Quality Control i

Gulf States Utilities P. O. Box 220, MA-3 St. Francisville, LA 70775 Attn:

Director Nuclear Licensing Long Island Ughting Co.

Shoreham Nuclear Power Station d

North Country Rd.

L Wading River, NY 11792 Attn:

Mgr. Nuclear Operti Support Dept.

Southem Califomia Edison Co.

San Onofre Nuclear Generating Station P. O. Box 128 San Clemente, CA 92672 Attn:

Manager, Nuclear Oversight Div.

Sacramento Municipal Utility District l

Rancho Seco Nuclear Power Plant 14440 Twin Cities Road Herald, CA 95638 I

Attn:

- Vice Pres & Gen. Manager i

P t.

Prge' 6 OCG-9218

  • December 17,1992 cc:

Tennessee Valley Authority 1101 Market Street, LP 4F Chattanooga, TN. 37402 Attn:

Tim Chan Tennessee Valley Authority 1101 Market Street, LP SB Chattanooga, TN 37402 Attn:

Mr. M. J. Fecht Mgr. Nuclear Experience Review Tennessee Valley Authority Bellefonte Nuclear Authority P. O. Box 2000 Hollywood, AL 35752 Attn:

C. W. Fulwider Texas Utilities Electric 400 North Olive Street, L.B. 81 Dallas, TX 75201 Attn:

W. J. Cahill Group Vice President 4

Washington Public Power Supply P. O. Box 460 Richland, WA 99352 Attn:

Mr. L C. Oakes Manager, WNP-1 Engineer Mr. Oh, Yong Shick Plant Mgr., Kori 3 & 4 Korea Electric Power Corp.

216 Ko-Ri Jangan Up Yangsan Gun Kyung-Nam, Korea 626-950 Sang Kee Park General Manager Korea Electric Power Corporation Gangnam Ku Yeong Dong P.O. Box 40 Seoul,135-791 Korea Hong, Jin Moon Plant Mgr., Yonggwang Nuclear Unit 1 & 2

. Korea Electric Power Co.

517, Kyema-Ri Hong Nong-Eup Yonggwang-Gun Jeon Nam -

Korea 513-880 n_____-__.____

Ptge 7 OCG-9218

  • December 17,1992 cc:

G. C. Lee, Superintendent

- Talwan Power Company Kuosheng Nuclear Power Station 60 Pa Tou Yeh Uu Village -

Wan Li Hsiang, Taipel Hsien 1

(20703), Taiwan, R.O.C.

Y. H. Chen Director, Nuclear Quality Dept.

Taiwan Power Company 17F,242,Sec.3 Roosevelt Road Taipel, Taiwan R.O.C.

S. H. Soong.

Station Superintendent Third Nuclear Power Station Taiwan Power Company _

P. O. Box 39 Heng-Chun, Ping Tung Hsein Taiwan,~ 924 R.O.C.

File KSfa22

____.m.-___m_

.a-_-_

Attachment to OCG-9218 '

Serial No. may be cast on outside surface.

[

Area 1

-Cast S/N

-Heat No.

-Cast Date jArea 4

+

Oi.v'O 9

? <0 0

.e.

yea..

Area 2

'f b

O "SR" 4

g Manufacture Date Sra No.

s

/

LEAK OCCURRED AT BOTTOM OF THIS i

THREADED (3/4"-10) HOLE

.R-4 CYLINDER HEAD SHROUD SIDE VIEW l

-