ML20083A206: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 14: Line 14:
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| page count = 2
| page count = 2
| project = TAC:42508
| stage = Other
}}
}}


Line 26: Line 28:


Attached please find one copy of the Toledo Edison Davis-Besse Nuclear Power Station Unit No. 1 Equipment Qualification Manual Revision 2 update. This revision is comprehensive and involves complete replacement of all Master Lists and System / Component Evaluation Worksheets in Section 2 Chapter 3 through 25 and Section 3. Chapters 1 and 2, Chapter 3.3 Master List has been revised and several new System / Component Worksheets added.
Attached please find one copy of the Toledo Edison Davis-Besse Nuclear Power Station Unit No. 1 Equipment Qualification Manual Revision 2 update. This revision is comprehensive and involves complete replacement of all Master Lists and System / Component Evaluation Worksheets in Section 2 Chapter 3 through 25 and Section 3. Chapters 1 and 2, Chapter 3.3 Master List has been revised and several new System / Component Worksheets added.
This revision addresses all the comments contr.*ned in the Franklin Technical Evaluation Report (TER). TEDS pre.vious TER response letter dated May 20, 1983 (Serial No. 951) provided tabular listings of all Franklin comments relative to those items in TER Categories I.B and II.A. All items listed there have been addressed in Revision 2.
This revision addresses all the comments contr.*ned in the Franklin Technical Evaluation Report (TER). TEDS pre.vious TER response {{letter dated|date=May 20, 1983|text=letter dated May 20, 1983}} (Serial No. 951) provided tabular listings of all Franklin comments relative to those items in TER Categories I.B and II.A. All items listed there have been addressed in Revision 2.
Additionally, a comprehensive review of all the radiation and thermal aging analyses has been performed. The results of this review have been incorporated into Revision 2.
Additionally, a comprehensive review of all the radiation and thermal aging analyses has been performed. The results of this review have been incorporated into Revision 2.
The May 20, 1983 response referred to certain components which were not included in previous submittals. Those components were located within local switch and relay cabinets. We have included these in Revision 2, although we are still in the process of qualifying some of those compenents.
The May 20, 1983 response referred to certain components which were not included in previous submittals. Those components were located within local switch and relay cabinets. We have included these in Revision 2, although we are still in the process of qualifying some of those compenents.

Latest revision as of 06:55, 26 September 2022

Forwards Equipment Qualifications Manual,Rev 2
ML20083A206
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 11/29/1983
From: Crouse R
TOLEDO EDISON CO.
To: Stolz J
Office of Nuclear Reactor Regulation
Shared Package
ML17150A231 List:
References
1009, TAC-42508, NUDOCS 8312200211
Download: ML20083A206 (2)


Text

. .,

e e-4 TOL500 Docket No. 50-346 License No. NPF-3 ""a R Cm Ef17~

Serial No. 1009

  • S MS*

November 29, 1983 Director of Nuclear Reactor Regulation Attention: Mr. John F. Stolz Operating Reactor Branch No. 4 Division of Operating Reactors United States Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Stolz:

Attached please find one copy of the Toledo Edison Davis-Besse Nuclear Power Station Unit No. 1 Equipment Qualification Manual Revision 2 update. This revision is comprehensive and involves complete replacement of all Master Lists and System / Component Evaluation Worksheets in Section 2 Chapter 3 through 25 and Section 3. Chapters 1 and 2, Chapter 3.3 Master List has been revised and several new System / Component Worksheets added.

This revision addresses all the comments contr.*ned in the Franklin Technical Evaluation Report (TER). TEDS pre.vious TER response letter dated May 20, 1983 (Serial No. 951) provided tabular listings of all Franklin comments relative to those items in TER Categories I.B and II.A. All items listed there have been addressed in Revision 2.

Additionally, a comprehensive review of all the radiation and thermal aging analyses has been performed. The results of this review have been incorporated into Revision 2.

The May 20, 1983 response referred to certain components which were not included in previous submittals. Those components were located within local switch and relay cabinets. We have included these in Revision 2, although we are still in the process of qualifying some of those compenents.

Very truly yours, s'M -

RPC: GAB:lah W ((~j.g$

g attachment cc: DB-1 NRC Resident Inspector THE TOLEOO EOISON COMPANY EO: SON PLAZA 300 MADISON AVENUE TOLEOO. OHIO 43652 8312200211 831129 PDR ADOCK 05000346 P PDR

.Dockst'No. 50-346 e Lic nze No. NPF-3 w Serial No. 1009

  • November 29, 1983 Attachment INSTRUCTIONS FOR REVISION 2 0F EQ MANUAL Section 1.0 No change Section 2.0 Chapter 2.1 and 2.2; no change Chapters 2, 3 through 2.25; remove entire contents of chapters, insert entire contents of new chapter, Revision 2.

Section 3.0 Chapters 3.1 and 3.2; remove entire contents of chapters, insert entire contents of new chapters, Revision 2.

Chapter 3.3; remove QA cover sheet (1 sheet) and Master List (pages 303M-001, Revision 0 through 303M-007, Revision 0). Insert new QA cover sheet and new Master List, Revision 2 (pages 303M-001 through 303M-007 Revision 2).

Insert new pages 303M-033 through 303M-036A Revision 2 in

~

order, behind page 303M-032A, Revision 0.

4 1

1 h

c k

l i.

s

~-