Text
,
- !p n
1 EISON
' EDISON PLAZA ~
300 MADISON AVENUE..
TOLEDO. OHIO 43652 0001 r Docket Number 50-346
~l m
License Number,NPF-3 Serial' Number'l-918 May 11 L1990!
i a
United l States. Nuclear Regulatory Commission
-Document' Control; Desk'
?Vashington, D.-C.
20555 Subj ect s-Response to Inspection Report Number 50-346/90003.
Gentlemen:
Toledo Edison (TE) has received Inspection-Report Number 90008 (Log Number 1-2264) and providesLthe following response.
s q
Violation-1 90008-01:
" Technical Specification 6.9.1.10,1; dated October 31, 1985,, requires-
'j that the Annual Environmental Operating' Reports shall:includeithe-c)
-results of analysis of all radiological environmental samples =and-
- i f
.i of all environmental radiation measurements taken'during-the period lT pursuant to the locations.specified in the1Tablefand Figures ~in the q
ODCH,-as well as summarized and tabulated results of these ' analyses-a and measurements.
Contrary to the above, although the' licensee's' Annual Radiological!
Environmental Operating Reports coveringE he years 1986 through 1
t 1988, included summaries, they did.not contain the r'esults of the-analyses of.all radiological' environmental' samples 1and-environmental radiation measurements taken during the respective periods."
Responses Acceptance or Denial of the Alleged Violation Toledo Edison acknowledges the alleged violation.
'/f
~
g q
lo l'
\\
PDR ADOCK 05000346 D'(
9005210044 900511 l
-Q PDC j,
1
- E.
IP'
~
)
9--
m Dock 9t Nunbar'50-346 License Number NPF-3
' Set ial' Number '1-918 Page 2' Reason for the' Violation i
~
i
-On July 2,t1985, Toledo Edison' received Amendment Number 86 to the-Davis-Besse Facility Operating License (FOL)'from_the Nuclear j
Regulatory Commission (NRCh This amendment-involved the-a Radiological Environmental Technical Specifications (RETS), andlin' part replaced;the reporting sectionLthat existed in Appendix 1B of
-the FOL vithithel reporting requirements of the-Administrative LControls section ofithe= Standard Technical-Specifications. This'.
change incorporated'the' addition of a-requirement'to include in the' Annual Radiological Environmental-Operating Reportf(ARE0R)Lthe-
.results of analysis of all' radiological environmental samples 3and' of all environmental radiation measurements taken during the'.
+. l reporting periodI ; Prior.:to1this change,Jthe: ARE0R vas' required to contain this information only in a summarized, tabulated. format;:
While'the summarized,7tabulatedLdata continuedit'o be included;in t
the 1985 through11988'AREORs, the requirement to include /the results of analysis of=all-radiologicalLenvironmental samples:and:
p 3
{
of'all environmental radiation measurements was. inadvertently omittedi
[
The-inadvertent omission ofLthese data is primarilyLattributed-to.
the:Iallure;of procedure HS-EC-00001, " Annual Radiological.
j Environmental Operating Report. Preparation and> Submittal'_"'.to'.
+
-adequately proceduralize-the.line item, requirements.'of the-g technical-specifications:that applysto.the'ARE0R.
In addition,.although several Quality Assurance audits of the-4
. Radiological Environmental Monitoring Program'(REMP) andtthe AREOR-l vere conducted during-the time period-in question,Jthe' failure.to:
include the results of analysis of=all radiological environmental samples and.of all. environmental radiationtmeasurements was not-discovered.
]
Corrective Action Taken and~ResultsIAchievedI The results of-analysis of all' radiological-environmental samplea l
and.of all environmental radiation measurements were included in O
the the 1989 AREOR, 'which was submitted,to the NRC:in Toledo Sdison-1 derial Number 1791, dated April 17, 1990.,
j r
' 4 The results of analysis of.all radiological environmental samples and of all environmental radiatio'n measurements for the 1985 through 1988 AREORs 'will be subd t ted to the NRC in addenda to--
these: reports by June 4, 1990.
j i
-l l
'l
t i
\\
- f Dock,t Nunb:r:50-346.
. License Number NPF-3',
. : Strial: Number 1-918 Page'3 AJsignificant) change in the Davis-Be'sse Quality Assurance audit t
~
process:vas. instituted in'earlyfl989. ;0uality: Assurance' audits'nov includeLnot only.a;reviev.of programmatic compliance toLTechnical.
L Specification-requirements,.but:an assessment of.the technical j
adequacyLof the' programs and-procedures which implementithesef
- 1 requirements.
In fact,iToledo Edison vas; conducting such anLauditl of the'REMP and the AREOR at..the same time.the NRC inspection was
- taking. place. > :The Quality Assurance audit:; team: issued AuditL Reporti
- Number AR-90-RADPR-01,4 vhich documents that the' results 'of all::
J radiological environmental samples andtmeasurementsLvere not-
+ i!
-included in'the AREORs..
i
,=
JAction Takhn.to2PreventLRecurrence-
.t
. Procedure:HS-EC-00001, "AnnualLRadiological1Environmentalc0perating
<7 Report Preparation and LSubmittalMis' being revised toj specifically.
list the~ individual line itemsLrequired to be included =-inithe.AREOR by.the Technical-Specifications. This revision! vill.be'effectivet by June 4, 1990.-
t
. Date When Fulli Compliance Vill' Be' Achieved.
Ji i
Full compliance. vill be" achieved bp" June 4',L19902:
d Very.truly yours, i
a
.i AVA/ssg
-i cc
'P. H. Byron', DB-1 NRC Senior Resident Inspector-A. B. Davis, Regional Administrator, NRC Region III T. V. Vambach, DB-1 NRC Senior Project l Manager
'}